HCAL Summary CMS Upgrade Workshop November 10, 2011 Jeremiah Mans University of Minnesota.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
The CMS Upgrade Program ECFA High Luminosity LHC Experiments Workshop Aix-les-Bains, October 1, 2013 J. Spalding, on behalf of the CMS Collaboration 1.
1 HCAL Upgrade TP simulation studies Jane Nachtman (Iowa) – for the HCAL group Trigger Upgrade meeting April 28, 2010.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Andris Skuja :: January 2012 Kolkata-Mumbai Workshop Overview1 H C A L Kolkata-Mumbai HCAL Upgrade Workshop Overview of HCAL Upgrade Workshop Andris Skuja.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Status & Plans for Backend Program  Backend Architecture  Current Status  Schedule for HF Backend  Schedule for HB/HE Backend  Summary & Plans November.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Backend Control Systems in uTCA HCAL Requirements January 21, 2010 Jeremiah Mans.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
Organization for Micro-Electronics desiGn and Applications HGCAL Front-End Electronics Christophe de LA TAILLE, Marcello MANNELLI sept 2015.
CMS HCAL optical links Eric Hazen (BU), Tullio Grassi (UMD) OptoWG - 28 Sept 2011.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
HCAL upgrade FPGA FW: tasks and issues 12 May2016 Tullio Grassi, Univ. of Maryland.
CMS ROC Report Patricia McBride May 26, 2005.
Jim Fast Pacific Northwest National Laboratory
ETD meeting Architecture and costing On behalf of PID group
Micromegas Vertex Tracker Status Report
Update on CSC Endcap Muon Port Card
HERD Prototype Beam Test
HCAL M&O-B Budget CMS Finance Board
CMS November Upgrade Week
Mini-drawers, FE-ASIC , Integrator
Old ROD + new BOC design plans
Status of the oSLB project
ScECAL+AHCAL+TCMT Combined Beam FNAL
RPC Detector Control System
ATLAS Tile Calorimeter Interface The 8th Workshop on Electronics for LHC Experiments, Colmar, 9-13 September 2002 K. Anderson, A. Gupta, J. Pilcher, H.Sanders,
Vertex Detector Overview Prototypes R&D Plans Summary.
The CMS Tracking Readout and Front End Driver Testing
Presented by T. Suomijärvi
RPC Detector Control System
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Commissioning of the CMS Hadron Forward Calorimeters Phase 1 Upgrade
Update on MPPC frontend electronics development at IU
Presentation transcript:

HCAL Summary CMS Upgrade Workshop November 10, 2011 Jeremiah Mans University of Minnesota

November 10, 2011 HCAL Summary :: J. Mans 2 HCAL Upgrade Overview ● Main idea : replace phototransducers to reduce noise and improve performance ● Realizing the benefit for physics requires an increase in channel count and a new ADC, data link ● Increased data volumes require upgraded backend electronics ● Backend must be installed and commissioned in parallel with CMS operations before frontend: “big bang” approach is unacceptable QIE10

November 10, 2011 HCAL Summary :: J. Mans 3 Questions: SiPM ● Need devices with sufficient pixel capacity, recovery speed, radiation tolerance ● Several excellent candidates, including impressive new vendors (Ketek) ● Testing ongoing using both teststands and testbeam ● Optical mixing is important for SiPMs to effectively use the dynamic range : R&D to continue Muon Ketek

November 10, 2011 HCAL Summary :: J. Mans 4 Questions: SiPM Total Dose Effects ● Tested Hamamatsu SiPM array before and after irradiation at the PS irradiation facility ● Irradiated to HL-LHC total dose levels ● Results are encouraging, raise a few questions ● Will there be any problems with the QIE swallowing this amount of charge from pedestals? ● Should we plan the mechanics to make the SiPM volume sealed and dry enough for significantly reduced operational temperatures? HPK Muon/Pedestal at Zero Dose, 20° C HPK Muon/Pedestal after 4500 fb -1, 20° C HPK Muon/Pedestal after 4500 fb -1, 5° C

November 10, 2011 HCAL Summary :: J. Mans 5 SiPM : Neutron Behavior 10 7 neutrons/cm 2 over 300 ms ECAL APD at gain 200 PIN diodes FBK, ZEC, Ketek SiPMs Large, slow signals seen in Hamamatsu, still under study Neutron signals observed with oscilloscope during SiPM irradiation

November 10, 2011 HCAL Summary :: J. Mans 6 Questions: Detector Segmentation QIE ● Physics studies done to this point indicate that three segments in HB seem to be sufficient ● Layer 0, shower-max, deep segment ● More than one SiPM needed in the deep segment ● Detector robustness against SiPM failure can be improved by interleaving connections to the several SiPMs, allowing a failed SiPM to be turned off

November 10, 2011 HCAL Summary :: J. Mans 7 HF Multianode PMTs ● HF replacement PMTs have thinner windows, metal cases, and multiple anodes : tubes will be installed in LS1 ● All will help reduce impact of charged particles passing through the PMTs, as will the TDC capability of QIE10 ● Multianode techniques have been tested with both P5 and testbeam data ● Multianode and TDC capabilities require upgraded electronics ● Choice between 2-anode or 4-anode readout will be important as a cost driver and for engineering complexity

November 10, 2011 HCAL Summary :: J. Mans 8 QIE10: Excellent Progress ● Common project with ATLAS ● Specifications ● 8-bit multi-scale ADC (dynamic range of ) ● 6-bit rising-edge TDC ● Charge-injection calibration capability (covering full range of ADC) ● Serial data output (reduced power consumption) ● Serial parameter programming ● Discriminated signal output for optional external TDC ● Early November design submission should meet all of these specifications except for those in blue which are newer and require some additional development

November 10, 2011 HCAL Summary :: J. Mans 9 GBT: Key Component, Progress ● GBT has two roles in the upgrade ● Secure duplex link for front-end control (ngCCM) ● Fast uplink for data readout ● Over the last year, HCAL has taken stronger involvement in this effort ● Development of test fixtures ● Testing of firmware ● Industry-standard 8b10b data format will be included in the next revision of the GBT, for transmission only ● Continues to be an area of focused interest, but seems likely to meet operational requirements and schedule requirements

November 10, 2011 HCAL Summary :: J. Mans 10 Upgrade FE Controls ● Replacement for the current CCM is planned to resolve several problems and risks associated with the current hardware ● Single-points-of-failure ● Configuration and monitoring are slow ● Too much complexity in the front-end ● Replacement introduces nearest-neighbor connections for redundancy ● Simpler, state-less on-detector electronics (i2c lines driven directly from counting-room electronics via GBT) UVA, Maryland

November 10, 2011 HCAL Summary :: J. Mans 11 Backend: Multiphase ● The development of the upgraded uTCA readout electronics is driven by the goals of upgrading the HB/HE and HF front-ends, which requires higher bandwidth and more capacity than the current electronics. ● In the near term, the upgraded electronics must also be able to operate with the current front-ends and allow phased replacement of the front-ends ● To allow the production and deployment of the backend electronics in preparation to receive the upgraded data links, we must demonstrate both sets of capabilities over the next 14 months.

November 10, 2011 HCAL Summary :: J. Mans 12 Parasitic Operation (2012) ● Overall goal is to demonstrate uTCA electronics capable of running HCAL at 1.6 Gbps (4.8 Gbps validation at B904) ● Immediate focus on HF, as this is the region where front-end replacement would likely come first ● Use optical splitting on optical signal from the front-end (384 channels) to provide parallel current and upgrade branches ● Cross-compare for validation ● Trigger validation (P5 or B.904) for link stability tests ● cDAQ validation at 100 kHz ● HF lumi histogramming HCAL Upgrade Crate Trigger Upgrad e Crate(s) CDAQ FRL Crate for Upgrades Global DAQ HCAL Crate Trigg er Crate s Optical Splitter Lu mi

November 10, 2011 HCAL Summary :: J. Mans 13 Hardware and Software Status AMC13 miniCTR2

November 10, 2011 HCAL Summary :: J. Mans 14 Schedule for 2012 ● Splitter installation: 2nd-half January ● Synchronization tests with beam : March ● Prototype cards built by US (35%), India (65%) ● Local DAQ tests (0.1 Hz common events in Commissioning stream) : May ● Tests with protoduction prototype uHTR cards: August/September ● Global DAQ tests (details of connection into Global DAQ under discussion) : September ● Trigger link synchronization tests in 904, possibly P5 depending on availability of hardware

November 10, 2011 HCAL Summary :: J. Mans 15 LS1* ● Production readiness review for backend electronics: Feb/March 2013 ● Installation of full set of optical splitters: March-July 2013* ● Installation of HF PMTs and cables (keeping original electronics) : March-December 2013* ● Production of HF backend electronics : April-Sept 2013* ● One additional round of DTC/AMC13 expected to provide 10 Gbit output : schedule to be determined in conjunction with cDAQ ● Schedule space for one update to uHTR design if needed ● Burn-in/installation of HF backend electronics: Oct 2013-April 2014* ● Install full set of HB/HE backend uTCA crates (empty) * subject to approval and funding!

November 10, 2011 HCAL Summary :: J. Mans 16 Beyond LS1* ● Production of HB/HE backend driven by multiple considerations ● One year ahead of FE replacement (likely LS2) ● Support of L1-trigger upgrade (2015?) ● Funding availability ● Production of HF front-end driven by upgrade to HF, to gain full function of the PMTs/background rejection ● ngCCM is an integral part of the HF front-end upgrade ● Major subcomponent dates (indicative) ● Full function QIE10 (late 2012) ● SiPM vendor decision (late 2012/early 2013) ● GBT chipset availability (early 2013) ● HB/HE Front-Ends to be ready for installation in extended TS or LS2 * subject to approval and funding!

November 10, 2011 HCAL Summary :: J. Mans 17 Conclusion ● HCAL R&D has made major progress over the last several years ● Nearing solutions for many key components: (SiPMs, QIE10, GBT) ● R&D remains on several items and significant engineering will be required to integrate full systems ● Backend electronics have moved from R&D to development or even pre-production ● Parasitic testing in 2012 to be crucial for validation ● Cooperation with trigger and DAQ groups is very important and is going well – several common projects underway