Table of contents 1.- Personal motivation 2.- BIM: Building Information modelling 3.- 4D Modelling 4.- Research project 5.- Research planning.

Slides:



Advertisements
Similar presentations
BIM EXECUTION PLANNING PROCESS
Advertisements

1 A Software Project Management Method: A 3 Sergio Coronado, José Alberto Jaén, UNIVERSIDAD POLITECNICA DE MADRID.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.
Disasters and Human Factors Literature Nestor L Osorio Northern Illinois University.
University of Southern California Center for Systems and Software Engineering Productivity Data Analysis and Issues Brad Clark, Thomas Tan USC CSSE Annual.
E. T. S. I. Caminos, Canales y Puertos1 Dimensional Analysis Engineering Computation.
Scale Modelling in Architectural Design B. de Vries.
Phase Difference = Phase Difference = 0.05.
IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: C:
Building Information Modeling
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Process Capability Training and Explanation 1.
Chapter 1 Construction Graphics: An Overview. Key Terms American Institute of Architects (AIA) (pg. 4) Architect/engineer (AE) (pg. 5) Computer-aided.
Project Execution Planning for Building Information Modeling
Emerging Trends in Electronic Design and Construction April 2013.
The vBuilding Process Skills Development Program.
Information and Communication Technology in Construction Industry
Architectures review for interoperability in e-health
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
Northside Residence Hall Texas A&M University College Station, Texas Project No Proposal For CMAR Services for.
Information Systems: Databases Define the role of general information systems Describe the elements of a database management system (DBMS) Describe the.
Software Safety Risk Evaluation Process Yorick Bouma, , Group III.
Uganda Scholarly Digital Library (USDL) Makerere University’s Institutional Repository By Margaret Nakiganda URL:
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 5: Advanced Structural Analysis & Coordination Advanced Structural Analysis & Coordination.
Fundamentals of Engineering Scales and Scaling. Goals Understand units and measures Understand concepts of scaling and types of scales Scales and Scaling.
Methodology Section In-class workshop. METHODOLOGY YesNo Clearly write/identify your research questions Describe what your instrumentation was (survey.
Overview of Building Information Modeling What does it mean for Civil Engineering?
IFIP TC5 Working Group 5.4 Computer Aided Innovation Objectives: The Working Group will: – Identify the different existing approaches – Share opinions,
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
BIM October-2014Dr. Walid Al-Awad 1 Building Information Modelling.
Databases. Databases – objective Define database Show differences between databases and search engine Show pathfinder Demonstrate databases Search databases.
Brownfields 101 Environmental Engineering Considerations Presented By: Ileen Gladstone, P.E., LSP, LEED.
What does a Civil Engineer do?
Page 1 / DI Martin Moesl, M.A. Univ. Prof. DI Dr. Arnold Tautschnig Determining and controlling of the Life-Cycle-Yield in an early planning.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
RISKS CONSORTIUM Seismic and volcanic risks Ciência 2010 Lisboa, 5-6 Julho, 2010.
Task 9:Fusion Power Plant Studies Status & Planned Activities
2. Building Information Modelling
I-15 North Phase 4 Preliminary DRAFT CRA Results July 2014
NUCLEAR POWER PLANTS DECOMMISSIONING
Building Pass as Building Material Information System
WINTEC New Zealand Diploma in Engineering (NZDE)
Design Quality (30%) - 6slides
BIM EXECUTION PLANNING PROCESS
Utilization of bim during architectural study
Beck Technology Innovation in all Dimensions.
EXTRA SLIDES.
Chapter 8: Marketing Market Research.
BIM MAPPING.
Design Quality (30%) - 6slides Explain your key concept? (2slides)
What is your FICO IQ Quiz? Link to article attached.
Best Ideas about Topics over Civil Engineering Seminar or Projects
Your Next Construction Project Demands Engineering Consulting Companies BIM ENGINEERING U.S. LLP.
Construction 101 Start to Finish
BIM EXECUTION PLANNING PROCESS
Design Quality (30%) - 6slides
خطوات البحث العلمي.
Results of the 2nd year of the program Title
Results of the 2nd year of the program Title
Results of the 1st year of the program Title
Who is the Responsible Person under Article 3?
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.

Results of the 1st year of the program Title
CIC BIM Competition Presentation Template & Content Guide
Оюутны эрдэм шинжилгээний хурлын зорилго:
Table 1. Project Control Factors and their hierarchy
Presentation transcript:

Table of contents 1.- Personal motivation 2.- BIM: Building Information modelling 3.- 4D Modelling 4.- Research project 5.- Research planning

1.- Personal motivation  Jesús de Paz Sierra  Ingeniero de Caminos Canales y Puertos  BIM Manager  Researcher hired in GITECO (Research group of construction technologies) 1

2.- BIM : Building Information Modelling  Is not just for building  Is not just a 3D model  Is not just a Database 2

2.- BIM : Building Information Modelling  Is not just for building  Is not just a 3D model  Is not just a Database 3

2.- BIM : Building Information Modelling Civil Engineer Structural Eng. MEP Eng. Geotechnical Eng. Concrete plant Manager Construction Manager Topographer Etc. Owner Architect 4

2.- BIM : Building Information Modelling 5 The MacLeamy curve

3.- 4D Modelling 6

4.- Research project 3D model & Planning SAFETY 4D Tool  Identifies the safety risks  Identifies the safety measures Self safety measures Collective safety measures  Develops and provides the safety measures, with 3D models and for each construction phase This tool analyzes the location and construction phase of the different elements and: 7

5.- Research planning  Preliminary analysis regarding to safety measures  EUBIM 2016 Conference New conferences New contacts  Article, paper or posters in other conferences  BIM Software workshops 8