ILC Cryogenic Systems Status Tom Peterson for the cryogenics global group 13 July 2006.

Slides:



Advertisements
Similar presentations
20 July 2007 Tom Peterson CEC ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20.
Advertisements

Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Cryomodule Concepts & Cryogenics J.D. Fuerst SPX Technical Study Group Meeting 27-29JUL10.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Current status Arkadiy Klebaner November 21, 2012
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
ILC Cryogenic Systems Status and EDR Plans Tom Peterson 25 October 2007.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
1 st stage Possible extension XFEL Cryo System Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13)
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
15 Dec 2006 SLAC Cryogenics Global Group 1 ILC Cryogenic Systems (edited to remove cost estimate numbers) Tom Peterson for the cryogenics global group.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Cryomodules as Part of the ILC Cryogenic System
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
Innovative He cycle Francois Millet.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Project X: Cryogenic Segmentation Issues
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ILC Cryogenic Systems Draft EDR Plan
Commissioning and First Cooldown of XFEL Linac
BriXS – MariX WG 8,9 LASA December 13, 2017.
ILC GDE meeting Cryogenics
Cryogenic cavern in Asian site
Cost Optimization Models for SRF Linacs
Mathew C. Wright January 26, 2009
Electron Source Configuration
ILC Experimental Hall Cryogenics An Overview
ILC Cryogenics -- Technical Design Report Planning
ILC - Global Design Effort
Tom Peterson, Fermilab 6 December 2011
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

ILC Cryogenic Systems Status Tom Peterson for the cryogenics global group 13 July 2006

Cryogenics, 13 July Sources of information TESLA TDR XFEL talks and reports »Most recently, "XFEL civil and cryoplant", by Wilhelm Bialowons and Bernd Petersen at Bernd Petersen, et. al. (DESY) direct communications Tuesday morning systems status webex/teleconference presentations and discussions » Tuesday morning CF&S videoconferences »Also direct communications with Tom Lackowski, Emil Huedem, and others

Cryogenics, 13 July Main linac information Mostly by direct communication »Chris Adolphsen »Nikolay Solyak And from TESLA TDR and XFEL concepts

Cryogenics, 13 July RTML information Very informative and up-to-date wiki page with information about the cryogenics requirements for the RTML, at » r:rdr_as:rtml_cryohttp:// r:rdr_as:rtml_cryo

Cryogenics, 13 July Damping ring information Damping ring cryogenic component arrangement and heat load estimates are taken from “DR Design Status”, a talk by S. Guiducci at the DR System Area Status Videoconference on 4 April 06. » fId=308http://ilcagenda.cern.ch/conferenceDisplay.py?con fId=308 Also useful discussions with Richard Ehrlich and Eric Smith of Cornell about CESR RF cavity cooling

Cryogenics, 13 July e- and e+ source information Electron source parts list u.php?id=rdr:rdr_as:rdr_as_home u.php?id=rdr:rdr_as:rdr_as_home POSITRON_Tuesday_Review_April.ppt by John Sheppard, presented on April play.py?confId=309 play.py?confId=309

Cryogenics, 13 July ILC cryogenic system definition The cryogenic system is taken to include cryogen distribution as well as production »Cryogenic plants and compressors Including evaporative cooling towers »Distribution and interface boxes Including non-magnetic, non-RF cold tunnel components »Transfer lines »Cryo instrumentation and cryo controls Production test systems will also include significant cryogenics »We are providing input to those cost estimates

Cryogenics, 13 July ILC cryomodule count

Cryogenics, 13 July ILC superconducting magnets GHz modules have SC magnets Some SC magnets are outside of RF modules »200 meters of SC helical undulators, in meter length units, in the electron side of the main linac as part of the positron source »In damping rings -- 8 sections of wigglers, 10 wigglers per section x 2.5 m per wiggler »Some magnets in sources and in RTML (spin rotator, etc.)

Cryogenics, 13 July End boxes and service boxes String end boxes are short, separate cryostats with approximately the same cross-section as a module Cryogenic unit end boxes (or “service” boxes) are mostly offset from the beamline to reduce drift space length between cryogenic units »A cavern (20 meters long) will be required at each cryogenic unit end to accommodate these offset boxes The following two XFEL slides and TTF photo illustrate the concepts for string end boxes and unit service boxes

Cryogenics, 13 July Bunch Compressor Bypass Transferline (only 1-phase helium) Feed-Box JT Cool-down/warm-up End-BOX ‚regular‘ string connection box XFEL linac cryogenic components This slide from XFEL_Cryoplant_ ppt by Bernd Petersen The ILC string end box concept is like this -- a short, separate cryostat The ILC cryogenic unit service boxes may be offset from the beamline, reducing drift space length, with a concept like this.

Cryogenics, 13 July XFEL Bunch-Compressor-Transferlines This slide from XFEL_Cryoplant_ ppt by Bernd Petersen The cryogenic unit service boxes may be offset from the beamline as shown, but they would be larger. Drift space is reduced to about 2 meters on each end plus warm drift space.

Cryogenics, 13 July TTF cold-warm transition ~ 2 m End module Cryogenic lines Warm beam pipe Structure for vacuum load

Cryogenics, 13 July Main linac modules Maintain liquid level in helium vessels over a 143 m string length Pipes sized for pressure drops in 2.3 km cryogenic unit Very limited cryogenic instrumentation

Cryogenics, 13 July

Cryogenics, 13 July Cryogenic instrumentation RF unit (~8 total thermometers per RF unit) »Temperature sensors on magnet current leads »Temperature sensor on one helium vessel per module »Temperature sensor on quad helium vessel String end box »18 temperature sensors »2 liquid level sensors »2 flow sensors »5 pressure taps (tube to room temperature sensor) »2 heater controllers »3 valve controllers »Vacuum gauges

Cryogenics, 13 July Module predicted heat loads Heat load estimates are still under development »May go lower with better understanding of HOM dynamic load scaling from TESLA »May go higher as discover forgotten sources of heat

Cryogenics, 13 July Cryogenic unit parameters

Cryogenics, 13 July CERN LHC capacity multipliers Cryo capacity = Fo x (Qd + Qs x Fu) »Fo is overcapacity for control and off-design or off-optimum operation »Fu is uncertanty factor on load estimates, taken on static heat loads only »Qd is predicted dynamic heat load »Qs is predicted static heat load

Cryogenics, 13 July Heat Load evolution in LHC Temperature level Heat load increase w/r to Pink Book Main contribution to the increase K1,3Separate distribution line 4-20 K1,3Electron-cloud deposition 1,9 K1,5 Beam gas scattering, secondaries, beam losses Current lead cooling 1,7 Separate electrical feeding of MB, MQF & MQD Basic Configuration: Pink Book 1996 Design Report: Design Report Document 2004 At the early design phase of a project, margins are needed to cover unknown data or project configuration change.

Cryogenics, 13 July Cryogenic unit length limitations 25 KW total equivalent 4.5 K capacity »Heat exchanger sizes »Over-the-road sizes »Experience Cryomodule piping pressure drops with 2+ km distances Cold compressor capacities With 192 modules, we reach our plant size limits, cold compressor limits, and pressure drop limits 192 modules results in 2.23 km long cryogenic unit -- 5 units per 250 GeV linac »Divides linac nicely for undulators at 150 GeV

Cryogenics, 13 July Main linac lengths

Cryogenics, 13 July Main linac warm drift space Presently 6.27 meters warm drift space, only between cryogenic units »Result of discussions with Nikolay Solyak »Desire to minimize drift length »Arbitrarily one module length minus 2.5 meter transition on each end From cryogenics viewpoint, no strong preference for lengths -- determine from main linac, instrumentation, vacuum input

Cryogenics, 13 July Accelerator Division / Cryogenics - M. Geynisman - April 21, 2006 Calculations of the pressure drops in the ILC Cryo Unit Conclusions (based on inputted data):

Cryogenics, 13 July Module pipe sizes updated

Cryogenics, 13 July RTML BC2 follows main linac pattern

Cryogenics, 13 July Damping ring heat loads

Cryogenics, 13 July Damping ring cryo system concept Four cryo plants located around each damping ring, one at each RF location Each plant provides the liquid for 4.5 K bath cooling of the RF and wiggler magnets and the nominally 70 K shield At least part of each plant is underground, at tunnel elevation, in caverns which also provide RF power, etc. Wigglers are in 8 locations »Each plant supplies two sets of wigglers, one 4.5 K / 70 K transfer line goes 1/8 of the way around the damping ring, through the tunnel from each plant, to the remote wigglers

Cryogenics, 13 July Damping ring cryo plant sizes

Cryogenics, 13 July Cryogenic architecture For shaft depth above 30 m, the hydrostatic head in the 2 K pumping line becomes prohibitive and active cryogenics (e.g. cold compressor system) has to be installed in caverns (LBC), i.e. additional cost for cryogenics and civil engineering.

Cryogenics, 13 July

Cryogenics, 13 July ILC cryogenic system inventory Since we have not counted all the cryogenic subsystems and storage yet, ILC probably ends up with a bit more inventory than LHC

Cryogenics, 13 July ILC cryogenic plant size summary ILC 500 will have 12 large cryoplants plus 8 smaller ones (not including BDL) »10 at about 5.2 MW for the main linacs »2 at about 2.5 MW for the sources and RTML’s »4 at about 1.0 MW for the positron damping rings »4 at about 0.4 MW for the electron damping ring Why more cryoplants in ILC than TESLA? »Dynamic load up with gradient squared (length reduced by gradient), larger multipliers, lower assumptions about plant efficiency

Cryogenics, 13 July Items associated with plants Compressor systems (electric motors, starters, controls, screw compressors, helium purification, piping, oil cooling and helium after-cooling) Upper cold box (vacuum-jacketed heat exchangers, expanders, 80 K purification) Lower cold box (vacuum-jacketed heat exchangers, expanders, cold compressors) Gas storage (large tank “farms”, piping, valves) Liquid storage (a lot, amount to be determined)

Cryogenics, 13 July Major cryogenic distribution components 8 large (2 K system) tunnel service or “feed” boxes »Connect refrigerators to tunnel components 8 large (2 K) tunnel distribution or “turnaround” boxes »Terminate and/or cross-connect cryogenic units ~170 large (2 K) string end boxes of several types »Contain valves, heaters, liquid collection vessels, instrumentation, vacuum breaks ~3 km of large transfer lines (including 2 Kelvin lines) ~100 “U-tubes” (removable transfer lines) Damping rings are two 4.5 K systems each the size (in terms of accelerator layout) of the Tevatron »Various distribution boxes and ~7 km of small transfer lines Various special end boxes for isolated SC devices

Cryogenics, 13 July Cryogenics WBS levels 4, 5 (cryogenics starts at level 3)

Cryogenics, 13 July Example of level 6

Cryogenics, 13 July Open issues Still identifying cold devices and estimating heat loads in sources and damping rings »Damping ring cryogenic layout is just a first concept »Need locations of SC devices for sizing transfer lines -- have many but not all Have not dealt with beam delivery system details yet Want to investigate alternatives for reducing cryo system visibility »Compressor grouping, inventory storage grouping, pipe sizing, etc.

Cryogenics, 13 July Plant cost estimates Cost (1998 MCFH) = 2.2*P(4.5 kW equiv)^0.6 »“Economies of Large Helium Cryogenic Systems: Experience from Recent Projects at CERN,” S. Claudet, et. al., Advances in Cryogenic Engineering, Vol 45, pg 1301, Plenum Press, Convert 1998 CFH to 1998 $ and then 1998 $ to 2006 $ Need to scale from 1998 to 2006 with proper factor, to be determined

Cryogenics, 13 July Scaling from 1998 costs For example, from CRU stainless steel price index » »1998 to 2005 is factor 1.44 (consumer price index was only 1.16) »Only have data through 2005 »Result: Cost (2005 $) = 2.16*P(4.5 kW equiv)^0.6 Will also look at aluminum and labor Other more recent cryo plant cost data are available »Linde study for Fermilab’s ILCTA-New Muon Lab refrigerator implies factor 1.53 for 1998 CHF to 2006 $ »SNS, and perhaps others »CERN

Cryogenics, 13 July Thermal cost optimization Additional 1 W at 2 K per module ==> additional capital cost to the cryogenic system of $4300 to $8500 per module (scale plant costs or scale whole system) Additional 1 W at 2 K per module ==> additional installed power of 3.2 MW for ILC »$1100 per year per module operating costs. »There is room in the 2 K pipes for additional flow Low cryo costs relative to module costs suggest that an optimum ILC system cost might involve relaxing some thermal features for ease of fabrication, even at the expense of a few extra watts of static heat load per module.