Get started with the P0 project PV 3Autumn 2012 Medialogy Lars Peter Jensen, Billede: © SLP-gruppen, Aalborg Universitet.

Slides:



Advertisements
Similar presentations
E7-Intro, E051 Project-related course (PE): Project Organised Learning (POL) Master of Science – Introductory Semester (E7 – Intro) Lecturer: Lars Peter.
Advertisements

1 Problem based Learning in Engineering and Science – Development of Supervisor A PhD Course given by: Anette Kolmos Department of development and planning.
Practical Training in PT Education – key aspects to develop PT competences Inga Vau, MBA Estonian Information Technology College.
Literature Survey, Literature Comprehension, & Literature Review.
Facilitation in Problem Based Learning
Prof. A. Taleb-Bendiab Room 605 A. Taleb-Bendiab, Module: Research Methods,
35th International IGIP Symposium, 2006, Tallinn, Estonia Lars Peter Jensen Associated Professor at Automation and Control Department of Electronic Systems.
Thinking Actively in a Social Context T A S C.
Intro Module11 Project-related course (PE): Problem Based and Project Based Learning Xiangyun Du Department of Development and Planning Aalborg University.
Xiangyun Du Learning portfolio Xiangyun Du
The new educational model Assesment of project groups Lars Peter Jensen.
Department of Chemical Engineering Project IV Lecture 3: Literature Review.
Intro Module11 Project-related course (PE): Project Organized Problem Based Learning (POL) Introductory Semester Xiangyun Du Department of development.
1 Project Organised Problem Based Learning (POPBL) What is a Problem Based Project? Introduction to course Lecturer: Lars Peter Jensen.
The Creative Problem Solving Pack. The following pages provide separate packs that you can use in the following situations. * Creative problem solving.
Brainstorm Solutions Problem Solving Module Session 4.
1 Tuesday, the 28th of August: The Aalborg model 8.30 Opening of day two and questions 8.45 Problem based learning and/or Project Work Why use these new.
Lars Peter Jensen Associated Professor at Automation and Control Department of Electronic Systems URL: Introduction to Problem.
1 Ideas of Problem-based Learning As a learner-centred process, problem- based learning meets the learners' interests and as such gives room for developing.
Expectations Widening my knowledge of general pedagogic methods and learning teaching structure at Aalborg University. I hope that I learn the teaching.
1 PE-course Project Organised Learning (POL) Mm 3: Project Management Master of Science – Introductory Semester (E7 + M7 – Intro) Lecturer: Lars Peter.
1 Problem based Learning in Engineering and Science – Development of Facilitator A Course given by: Xiangyun Du Department of Education, Learning and Philosophy.
1 Project Organized Learning - POL What is a problem based project? Project Organization Problem-oriented – what is that? A four phase model of a Project.
1 Problem based Learning – The AAU Way A Work Shop given by: Mona Dahms Department of development and planning Fibigerstraede 11, DK Aalborg East.
Tuesday December 15 th 2015: Results from experiments with facilitation situations + Examination Until the last day of the course the participants are.
35th International IGIP Symposium, 2006, Tallinn, Estonia Lars Peter Jensen Associated Professor at Automation and Control Department of Electronic Systems.
1 Problem based Learning – The AAU Way A Work Shop given by: Mona Dahms Department of development and planning Fibigerstraede 11, DK Aalborg East.
E7-Intro, E071 Project-related course (PE): Project Organised Problem Based Learning (POPBL) Master of Science – Introductory Semester (E7 – Intro) Lecturer:
11/06/04Supervision and Assessment1 Friday the 11 th of June: Supervision and Assessment 09.00:Cases on supervision (LK + LPJ) 11.00:Supervision - strategies.
35th International IGIP Symposium, 2006, Tallinn, Estonia Lars Peter Jensen Associated Professor at Automation and Control Department of Electronic Systems.
1 Project-related course (PE): Project Organised Problem Based Learning (POPBL) Master of Science – Introductory Semester Lecturer: Lars Peter Jensen.
1 Project Organised Problem Based Learning (POPBL) What is a Problem Based Project? Introduction to course Lecturer: Lars Peter Jensen.
1 Problem based Learning in Engineering and Science – Development of Facilitator A Course given by: Xiangyun Du Department of Education, Learning and Philosophy.
1 Introduction to Problem based Learning – The AAU Way Program for to day, Supervision : Exercise: Role play of a supervising situation Lunch Planning.
1 Project Organised Problem Based Learning (POPBL) What is a Problem Based Project? Introduction to course Lecturer: Lars Peter Jensen.
Introduction to the PV course September 3rd 2012 Lars Peter Jensen and Lone Stub Pedersen © SLP-gruppen,
Research Introduction to the concept of incorporating sources into your own work.
PV Introduction to the PV course Problem Based Learning in Science,
The AMSc project: what to expect and how to do it
Problem Orientation An Unsatisfactory Situation
Problem Based Learning The Aalborg case
Project Organized Learning - a course from the Master Programs Introduction Semester for foreign student in Electronics and Information Technology Lars.
Situated supervision Ability to read the situation ….
PE-course Project Organised Learning (POL) Mm 4: Project Management
Assessing Young Learners
Take control of your project
NEEDS ANALYSIS.
M-LANG project  Ref. n NO01-KA Interactive Exchange Workshop on how to use response systems and ICT tools for creating interactive learning.
Take control of your project
What lessons to be learnt from reflective learning journals written by students to improve learning and intercultural awareness? Lars Peter Jensen Associated.
Career Portfolios Building Your Own Personal Career Portfolio
PBL at Aalborg University
By : Nesrine Ali Abdel Azim
Recording Blackboard Collaborate Sessions
Problem-based learning
The new educational model Assesment of project groups
“Tell me and I forget. Show me and I remember
Project Organised Problem Based Learning (POPBL)
The new educational model Assesment of project groups
Style You need to demonstrate knowledge and understanding beyond undergraduate level and should also reach a level of scope and depth beyond that taught.
The new educational model Assesment of project groups
Chapter 2 Research Process
Transdisciplinary Skills for Self-management Skills
Teamwork is crucial to success in an organization
A PhD Course given by: Anette Kolmos
PBL at Aalborg University
Institute of Electronic Systems
Presentation and Communication
RESEARCH METHODOLOGY – EXPLORING RESEARCH FUNDAMENTALS
PBL at Aalborg University
Presentation transcript:

Get started with the P0 project PV 3Autumn 2012 Medialogy Lars Peter Jensen, Billede: © SLP-gruppen, Aalborg Universitet 1

 Problem Baced Learning  AAU model: what, why og how  Tip for the project  Tools for the project work  Tools for Strukturering - Brainstorm, structure- and flow diagrams  Exercise in group room Agenda © SLP-gruppen, Aalborg Universitet 2

Learning goals for today © SLP-gruppen, Aalborg Universitet Billede: Knowledge of problem-oriented project work at Aalborg University. Knowledge of tools for project work Knowledge of project phases and report writing to such an extent that you can use it in P0 period 3

PBL- principles Learning Problem based Contextual Project organized Experience oriented Socially Participant driven Group /Team based Content Theory /practice relation Interdisciplinary Exemplary learning Meta-learning 4

5 Problems - WHAT? §The project group unpicks and formulates the problem embedded in the project §The problem has to be analyzed within a relevant context before it can be solved §The problem determines the choice of methods and theories to be used in the analysis as well as in the solution

6 Problems – WHY? §‘Real life’ problems are interdisciplinary and complex §Working with ‘real life’ problems meets the learners' interests and enhances motivation §It emphasizes development of transferable skills, i.e. analytical, problem solving and information processing skills

7 AAU students on problems §”We are engineers – our responsibility is to solve real technological problems.” §”This is the first time we found a real problem ourselves rather than getting something from supervisors. It is really exciting. It fits my way of learning. I learn better when I find the way myself. This way of learning is much better than only attending lectures, because I have to know why I need to learn this. When I know the objective clearly, I learn much better.” §”When working on a problem, I am strongly motivated and attracted. We need to solve this problem.” Xiangyun Du, 2005

So, what is “problem-oriented”? To wonder To question To challange To be goal oriented To think in hole (see the big picture) Billede: © SLP-gruppen, Aalborg Universitet 8

§A (for some) unsatifying situation l E.g. an increasing number of danish kids are getting fat §A possibility for improvement l The homepage of AAU is oldfasioned §A situation where the consequences and possibilities are unknown. l We want to investigate if and how IT and new technology can be used to improve kids habits towards doing regular exercising What is a problem? © SLP-gruppen, Aalborg Universitet Billede: 9

§The contextual professionalism l What, Why, Who, Where, When - at both micro (individual), meso (network) and macro (community) level §The technical-scientific professionalism l How - in relation to the product §Project Work professionalism l How - in relation to the process Three professions © SLP-gruppen, Aalborg Universitet Billede: 10

The New Aalborg Model 11 50% cources 50% Project Course 5 ECTS Project 15 ECTS In groups up to 8 persons Individual assessment Self-selected groups Appointed supervisor(s) One semester 1 ECTS (European Credit Transfer System) = 30 working hours Course 5 ECTS Course 5 ECTS 11

What is a project? 12

§A unique task, with a lot of complex activities §Needs several people with different skills §Have a final goal/objective §Limited resources (time, money, people) §Have to deliver a result at a given time: l As a minimum a written report Definition of a Project: © SLP-gruppen, Aalborg Universitet Billede: 13

14 Project – WHY? §A survey carried out in 1997 showed that 75 % of companies wanted new employees to have good skills in project work. §Working with realistic projects is motivating for students. §It increases student activity and thereby increases the learning. §Develops transferable skills, incl. project management, documentation etc.

To work in an unsecure world © SLP-gruppen, Aalborg Universitet Billede: clipart/choice.gif 15

Billede: Stages of a Project work Project phases: §Initiating problem § Problem analysis § Problem formulation § Project boundaries § Problem solving §Report writing Project time Dissemination/Documentation Working papers Report © SLP-gruppen, Aalborg Universitet 16

§are openly expressed §is driven by interest and motivation §has or seeks societal relevance The initiating problem © SLP-gruppen, Aalborg Universitet 17

© SLP-gruppen, Aalborg Universitet Billede © KVL (Andersen et al, 1995:62) §Problem Understanding - relevant definitions and explanations in order to understand the nature of the problem §Problem occurrence and extent §Possible problem solutions framework for problem solutions and the potential buyers. Problem analysis 18

© SLP-gruppen, Aalborg Universitet Billede © KVL (Andersen et al, 1995:62) §Technology Comprehension - relevant definitions and explanations in order to understand a technology's characteristics and potentials §Potential buyers of technology - a quest for problems §Technology social relevance and the possibility of realization Problem analysis 19

Motivating Well argued Bound Able to ”show the route” The Problem analysis is: © SLP-gruppen, Aalborg Universitet 20

Working with the Problem: © SLP-gruppen, Aalborg Universitet §In depth with one aspect of the problem. §Is focused in relation to "what we should know more about", and possibly. "What can we do about it" questions. §Is systematic (vs. methodology) and along- linking theory and practice. Billede © KVL (Andersen et al, 1995:144) 21

Four steps of the Conclusion © SLP-gruppen, Aalborg Universitet §Results §Answer to problem formulation §Reflections of methods §Perpectives Remember to be honest 22

Teamwork LEARNING BY DOING!! It is important to be aware of the different roles in the team to learn to use strengths and improve weaknesses Billede: 23

24 Team work – WHAT? §6 - 8 students co-operating on the same project (at later semesters students per group) §They have to carry out the project and document the results §An oral group presentation is the starting point for en individual exam based on the documentation, held at the end of the project period. Individual marks are given.

25 Team work – WHY? §A survey carried out in 1997 showed that 75 % of companies wanted new employees to have good skills in group work. §The individual student in the group learns from the others (Peer Learning) §Responsibility towards the group makes the individual student work hard

26 AAU students on team work §”I think that it becomes easier when you learn technical matters in groups. Normally we use the blackboard to discuss things. … You gain more from the time you have to spend in the university in this kind of education when you work in teams. We are getting energy in this way.” §”Working in groups we get mental support from each other; it is also a responsibility so that we won’t drop out easily.” (Xiangyun Du 2005)

27 Team work – HOW? §Students are in charge of forming their own groups §Project groups choose their own project It is important  to be aware of different roles in the group and  to learn how to use strengths in a constructive way while improving on weaknesses A Contract of Cooperation (CoC) is a useful tool in making mutual expectations explicit.

28 Group contract – an example

29 Group meeting Subgroup work Discussion Disagreement Presentation Compromise Exam Report writing Life Social activities Studying engineering via group projects Brainstorm Multiple learning resources Participating communities of practice – active learning, communication, organization, and management

What is a supervisor? 30

§A person who through facilitating questions encourages your learning process §A person who points out the potentials in your work §A person who gives loyal and constructive critic of your work §A person who at the project exam is one of the examinors A supervisor is © SLP-gruppen, Aalborg Universitet Billede: 31

§A teacher who is responsible for your learning process §A person who tells you what to do §A person who decides what should be the content of your project §A member of your project group §An inexhaustible resource – therefore: Use your supervisor hours carefully A supervisor is NOT © SLP-gruppen, Aalborg Universitet Billede: 32

Break for 15 minuts Eller er det biksemad ? 33 Use the break to ”vote” once more on experiences with the AAU educational model 2

Synopsis/Abstract Fore word Table of content Introduction 1. Part: problem analysis Problem formulation and boundary 2. Part: problem solving Conclusion References Appendix Report: © SLP-gruppen, Aalborg Universitet Billede: 34

Remember !! References and quotations: The Chicago method (Jensen, 2001a:21) au/Chicago Literature is the listed alphabetic: Jensen, Hans (1999a): ” Elektroniske System, AAU Forlaget, Aalborg By numbers [2] u/Vancouver u/IEEE Literature is the listed by numbers: [4] Hans Jensen, Elektroniske System, AAU Forlaget, Aalborg 1999a © SLP-gruppen, Aalborg Universitet Billede: home6.inet.tele.dk/aamsk/husk_z.gif We have to know all possible information's to be able to find the quoted source: Books: Author(s), year, title, publisher, ISBN or ISSN no. Journals: As above + name of journal, number and date Internet: URL and date for downloading Persons: Name, title, company 35

36 Working papers – WHAT? All types of written documentation, whether on paper or as an electronic file, which is related to §the project task, §the project management §the group work

37 Working papers – WHY? §To capture, coordinate and distribute the information collected and/or created by individual members of the group, to the other group members as well as to the supervisor

38 Working papers – HOW? If written text the working papers should contain the following four parts: 1.Header for identification 2.Introduction (What? Why?) 3.The main text 4.Summary (What did we learn?)

39 Working papers – HOW? §If diagrams, drawings etc. the working papers should as a minimum contain: §Header for identification §Explanatory text

40 Working papers – HOW? In the Contract of Cooperation you could include points on production of working papers: §How to distribute the work tasks §How many persons write in a sub-group §How to give response to working papers §How and when to get response from the supervisor

41 Diary §A diary documents the most important activities and decisions in the group §The group has to decide upon a suitable format for and content of the diary

Blocking contribution to communication §Defense / attack attitude §Disagreement without constructive alternatives §Blocking discussion §Speaking about other topics §Speaking constantly 42

Contributions that promotes communication environment §Praise and encourage others §Supporting others to be heard §Follow and support ideas §State change of position §Demonstrating openness §Have control of the decisions taken Billede: 43

Contributions that promotes discussion directly §Make suggestions §Search information through questions §Provide information §Summarizing discussion §Develop suggestions and ideas §Testing own and others' comprehension of the discussed Billede: 44

Check communication flow 45

Tools for structuring Billede: clipart/choice.gif A map would help © SLP-gruppen, Aalborg Universitet 46

Brainstorm Brainstorming is a tool for idea generation Game rules are: (Asborn, 1941/1948) §The defined theme / issue should be familiar to all participants. §Set the mind free. §Criticism takes place only later §The more ideas the better. §Be inspired along the way. © SLP-gruppen, Aalborg Universitet 47

Post-It brainstorm §Agree on what the starting point for brainstorming shall be §Generate ideas individually and write them on Post-it notes §Read each other's ideas and structure ideas together by moving the flaps in the same category together §Discuss and evaluate the proposals based on selected criteria, for example. interests, resources or relevance © SLP-gruppen, Aalborg Universitet 48

49

50

Structure and charts © SLP-gruppen, Aalborg Universitet 51

Mind-map §Brainstorm from this question and mark them as hybrids on the issue. §Draw branches between questions and ideas, and use the branches to detail the proposals. © SLP-gruppen, Aalborg Universitet Provides overview and ideas by: Writing a topical issue at the center of a large piece of paper 52

Example of mind-map Kilde: © SLP-gruppen, Aalborg Universitet 53

© SLP-gruppen, Aalborg Universitet 54

Cause-effect diagrams © SLP-gruppen, Aalborg UniversitetReference: Mikkelsen & Riis (1998:424) cause effect 55

Objective means diagrams © SLP-gruppen, Aalborg UniversitetReference: Mikkelsen & Riis (1998:421) 56

57 A few examples of sequential structures

58 This is processes … and this is components Flowchart

59 Group task in group room: Experience and expectations 1.Make a round to present experience with problem orientation, project work and/or group work from previous education and/or work. 2.Compare your experience with the Aalborg model, both according to size of projects, number of group members, freedom in choise of subject and methods and interdiciplinarity – what are similarities and what are differences? 3.Discuss how you can draw upon your experience in the project.