2011-02-03E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.

Slides:



Advertisements
Similar presentations
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets 1 MTCA Systems Technology Meeting CERN Genève.
Advertisements

1 Tell10 Guido Haefeli, Lausanne Electronics upgrade meeting 10.February 2011.
First test results with the Gigabit Link Interface Board (GLIB) Paschalis VICHOUDIS CERN PH-ESE-BE on behalf of the GLIB team (M. Barros Marin,
SLAC Particle Physics & Astrophysics The Cluster Interconnect Module (CIM) – Networking RCEs RCE Training Workshop Matt Weaver,
Slide ‹Nr.› l © 2015 CommAgility & N.A.T. GmbH l All trademarks and logos are property of their respective holders CommAgility and N.A.T. CERN/HPC workshop.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Communication in ATCA-LLRF System Presenter:
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
Trigger Hardware Development Modular Trigger Processing Architecture Matt Stettler, Magnus Hansen CERN Costas Foudas, Greg Iles, John Jones Imperial College.
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
MicroTCA in CMS Not Official! Just my opinions... Greg Iles 6 July 2010.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
Mitglied der Helmholtz-Gemeinschaft Status of the MicroTCA developments for the PANDA MVD Harald Kleines, ZEL, Forschungszentrum Jülich.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
Creotech Instruments Jacek Kosiec On behalf of.
Counting Room Electronics for the PANDA MVD
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Modular Electronics an overview of modern standards
High Speed Interconnect Project May08-06
The Data Handling Hybrid
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
The First HCAL Readout Schedule! (7/22/99 UMD meeting)
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
A Compact Trigger Architecture for SLHC
HCAL Data Concentrator Production Status
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Task T - CMS at LHC Global Calorimeter Trigger
Trigger Upgrade Planning
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
AMC13XG (XG = Ten Gigabit)
Read-out of High Speed S-LINK Data Via a Buffered PCI Card
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister,
Matrix Processor / Backplane Design Details
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
GEM for CMS Electronics Overview
FED Design and EMU-to-DAQ Test
Presentation transcript:

E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration

E. Hazen -- HCAL Upgrade Workshop2 MicroTCA Common Platform Working Group E. Hazen (convener) Status report

E. Hazen -- HCAL Upgrade Workshop3 Included in scope of this WG Backplane connectivity (port connections) Protocols on common ports (TTC / TTS / DAQ) Crate and MCH specification Guidelines for AMC designers Power module specifications Not included in this WG (may be in others) Implementation of MMC, GbE, controls DAQ interface upgrades TTC interface upgrades uTCA Common Platform WG

E. Hazen -- HCAL Upgrade Workshop4 Action since last meeting AMC13 now supported by Vadatech and NAT IPMI service provided to MCH2 as “13 th AMC” Update channel GbE provided to MCH2 via switch Vadatech VT892 crates ordered at CERN and MN Document on Crate Concepts and Requirements updated... propose to release as v1.0 this week (current v0.9 draft attached to agenda) Detailed design work started on AMC13 at Boston (see my later talk for some details).

E. Hazen -- HCAL Upgrade Workshop5 Action still needed Follow DAQ and TTC upgrade developments Further testing of TTC implementation for AMC13 Discussion about PCIe and eSATA clocking? Discussion about power modules and standards Hardware requirements (if any) for JTAG Further discussion of “synchronous controls” idea (combined DAQ and controls on Fabric A) We are building hardware compatible with both, so this is not an urgent issue

E. Hazen -- HCAL Upgrade Workshop6 DAQ Upgrade Meeting Tuesday 1 February Brief summary INDICO Link

E. Hazen -- HCAL Upgrade Workshop7 Summary of DAQ Meeting 1 Feb C. Schwick

E. Hazen -- HCAL Upgrade Workshop8 DAQ / TTC Upgrade Status FED-DAQ link upgrade plans: two stages 1 – new SLINK cards  Affects HCAL wherever we keep VME after 2017 (should be transparent, or require trivial firmware changes) 2 – new link  Optical, but speed and protocol not yet defined TTC upgrade: many ideas on the table Passive Optical Networks, Point-to-Point links, synchronous Ethernet... see Jan Troska's talk Existing TTC will continue to be in use through 2020 New FED interface (AMC13) should handle TTC, plus be upgrade-able to a new undefined optical protocol

E. Hazen -- HCAL Upgrade Workshop9 DAQ / TTC Upgrade Implications DAQ link... Should switch from SFP to SFP+ interface to give a little more flexibility. No need to go to 10Gb yet as speed is not decided. TTC link... we can accommodate any reasonable MHz serial input with current hardware. If a PON at i.e. 1.6Gb/s is chosen (one of may options) we would need to modify AMC13 base board design No reason to change the AMC13 design yet

E. Hazen -- HCAL Upgrade Workshop10 Backup Review of current MicroTCA proposal Per WG agreement

E. Hazen -- HCAL Upgrade Workshop11 CMS Readout Crate (i.e. HCAL)

E. Hazen -- HCAL Upgrade Workshop12  TCA Dual-Star Backplane MCH 1 Commercial /Std MCH 2 aka “AMC13”, “CMS-MCH”, “DTC” Custom design for CMS Bi-directional serial (up to 10Gb/sec) point-to-point links from each AMC to MCH (redundant links to each MCH) Fabric A (1 link) Gigabit Ethernet Fabric B (1 link) LVDS private protocol Fabric D-G (4 links) CLK1/2 (1 link) Dedicated MLVDS clock Note: Interconnections can be customized by the backplane manufacturer inexpensively.

E. Hazen -- HCAL Upgrade Workshop13 uTCA Ports Use for CMS

E. Hazen -- HCAL Upgrade Workshop14 Fabrics A, B Use Port 0 is GbE sourced from commercial MCH1 Port 1 – Compatible with Xilinx GTP (<= Gb/s) DAQ data from AMC to MCH2 May be used also for fixed-latency controls (TTC) May be used also for buffer status (TTS) May be used also for auxiliary data (selective readout) Port 3 – “Low speed” serial LVDS ( Mb/s) Fixed-latency controls (TTC) Buffer status (TTS) Auxiliary data (selective readout)

E. Hazen -- HCAL Upgrade Workshop15 Fabrics D and up Use not mandated by this WG Mainly for trigger users Two options for interconnection Star connection to tongue 3, 4 of MCH slots  Interconnect passively or with crosspoint switch at MCH Fixed connections on backplane Or, a combination:  Ports 4-7 interconnected on backplane  Ports 8-12 routed to crosspoint switch on MCH2