News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.

Slides:



Advertisements
Similar presentations
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Advertisements

T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
H.-G. Moser, MPP project review, December 17, 2012 Belle & Belle II 1 Belle: ongoing analyses, papers Belle II: accelerator upgrade status Belle II detector.
PXD EVO Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
SVD IR mechanics status S.Tanaka SVD mechanics session.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
SLAC contribution to the Muon Accelerator Program (MAP) SLAC2MAP.
H.-G. Moser, Advisory Board Meeting, July 2, 2013 Flavour Physics 1 B-Physics at Belle and Belle II Physics at B-Factories Upgrade at KEK: SuperKEKB and.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won.
DEPFET Workshop, May 2016 Ladislav Andricek, MPG Halbleiterlabor 1 o Documentation o Transition to “Production Mode” o Please update docu and place it.
X. Zheng, July 22-23, 2008, Hall A Parity Collaboration Meeting Xiaochao Zheng University of Virginia July 22-23, 2008 Overview of the experiment, schedule.
Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
L.Vitale INFN and Univ. Trieste
How to get involved at your school
PXD DAQ Workshop June 9 and 10, 2011 Münzenberg (near Gießen) Goals: 1
KEK IR status S.Tanaka KEK.
B2GM Sessions PXD I: Wednesday, June 6, 16:50-20:20
Update on the SVD construction
7th Belle II VXD Workshop, Prague
KEK news ( ) S.Tanaka.
Status of the CO2 Cooling Project
Bidding resources CIP Workshop 2/23/2017.
Discussion items SVD mechanics session.
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Update of experimental hall in Japanese mountain site
Planning for the TDR KEK schedule: Technical Design Report (TDR)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec CONGRESSIONAL ACTIONS
Completing the Step IV Programme
10/month is the present production rate 2 FTE + sporadic contributions
Preparations for a Lehman Review
Replace This Text with Committee Name
Agriculture and Natural Resources
Run16 Y. Akiba.
Comments to the SVD4 structure
Status of SuperKEKB May 11, 2007 SuperB Workshop Masa Yamauchi KEK.
Agriculture and Natural Resources
Y. Akiba (RIKEN/RBRC) 2016/04/21 Radiation lab meeting
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Information Technology Committee
Middle Managers Committee
Action Items Background: Committee Involved: Action Requested:
SVD group organization, schedule, milestones
Program & Staff Development Committee
Injector/Linac Design Status C. E
Family & Consumer Sciences
Replace This Text with Committee Name
Communications Committee
Ag & Natural Resources Committee
Presentation transcript:

News From KEK S.Tanaka

FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet (Oide-san requested 1 month running at KEK budget hearing) Accelerator study: ? days Background study: a few shifts in 1-2 days ? E CM (max): like to keep <11.02 GeV (BT, magnets) GeV (Linac limit) [achieved max.]

Next B2GM meeting I discussed with IR, SVD people about rearrangement of B2GM meeting (Below is just my idea) PXD session will divide to some sub-meetings. – PXD session (mainly DEPFET, Electronics ) Session style is same (may be shorten than last B2GM meeting). – Service (Cooling, Cabling, assembly issues) Combined with PXD, SVD, IR, Accelerator people Mainly discussion (short summary may talk on PXD session) – DAQ Not decided yet, but I think some detailed discussion should have with SVD and DAQ people.

BELLE PAC (2/19-20) - Design of machine-detector-interface - Technology choices made, and will be made - Construction schedule - Organizational structure of the new collaboration – I’ll prepare the slides based on C. Kiesling’s talk on July B2GM (mainly group structure), H.-G. Moser’s on Nov B2GM and Some update on Prague meeting.