L1 Technical Proposal: Phase 2 ● Slow progress on writing TP phase 2 – Distractions with beam and calibration – Also some things are still unclear ● Hence.

Slides:



Advertisements
Similar presentations
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Advertisements

L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
Management Committee Summary Effort at CERN Operational Tasks Cost Sharing and New Expenses ZDC Collaboration Management roles Papers, Conferences and.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
FEX Uli Schäfer, Mainz 1 L1Calo For more eFEX details see indico.cern.ch/getFile.py/access?contribId=73&sessionId=51&resId=0&materialId=slides&confId=
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
CMX (Common Merger eXtension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Multistep Runs with ROD Crate DAQ Murrough Landon, QMUL Outline: Overview Implementation Comparison with existing setup Readout Status ModuleServices API.
S. Rave, U. Schäfer For L1Calo Mainz
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
JFEX Uli Schäfer 1. Constraints & Numerology Assumption: one crate, several modules. Each module covers full phi, limited eta range Data sharing with.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Mark Thomson University of Cambridge WP6: L1Calo Upgrade.
17 December, 2010 ATLAS L1Calo upgrade meeting Meeting overview Recent hardware developments, ideas.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
L1Calo L1 Coordination Meeting March 24th, 2015 Rainer Stamen.
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
CLUE Framework 01 – comments and issues Interim meeting October 2011 Roni Even.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Phases: to be 2 or to be B? The question of new timescales ● L1Calo phase 2 → phases B and C? ● Implications for design ● Example timescales ● Organising.
Online Software Status ● Overview ● Recent Changes ● Required Changes ● Desirable Changes ● Upgrade ● Summary Murrough Landon 1 July 2009.
L1Calo Upgrade Phase 2 ● Phase 2 Functional Blocks? – Thoughts on L1 “refinement” of L0 ● Simulation framework ● Phase 1 Online SW Murrough Landon 2 February.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Phase 2 L1Calo/Calo Interface ● Introduction ● Calo RODs ● Granularity and algorithms ● Calo-L1Calo links ● L1Calo design? ● Summary Murrough Landon 9.
Rainer Stamen, Norman Gee
Online Database Work Overview Work needed for OKS database
ATLAS calorimeter and topological trigger upgrades for Phase 1
L1Calo Upgrade Phase 2 Introduction and timescales
L1Calo Requirements on the DPS
Demonstrator Slice Possibilities and Timetable
UK Simulation Planning
Run Control (and Other) Work
L1Calo Phase-1 architechure
L1Calo upgrade discussion
ATLAS L1Calo Phase2 Upgrade
Online Software Status
Remaining Online SW Tasks
Level 1 (Calo) Databases
Test-rigs outside CERN
Cabling Lengths and Timing
Online Software “To Do” List
Possibilities for CPM firmware upgrade
Run-2  Phase-1  Phase-2 Uli / Mainz
Management Meeting Operations
Level-1 Calo Monitoring
ATLAS: Level-1 Calorimeter Trigger
L1Calo Joint Meeting Introduction
CPM plans: the short, the medium and the long
CMX Status and News - post PRR -
Trigger issues for the CALICE beam test
Presentation transcript:

L1 Technical Proposal: Phase 2 ● Slow progress on writing TP phase 2 – Distractions with beam and calibration – Also some things are still unclear ● Hence some questions here... ● NB evolving TP document at Murrough Landon 19 April 2011

, QMUL 2 L1Calo UK Upgrade Meeting Baseline Phase 2 L1Calo Architecture In the low latency scenario, only the L0 blocks are possible

, QMUL 3 L1Calo UK Upgrade Meeting L0Calo ● Default option: single module for EM/Tau and Jets – Mention option of separate EM/Tau and Jet processors ● Demonstrator proposal has “A” and “B” processors ● How consistent do we need to be? – Should we interpret A and B as EM/Tau and Jet? ● If not, what? – Rationale for separation? ● Technical (links, FPGAs etc) ● Institute responsibilities ● Other? ● NB separate systems probably increase the total cost ● How much detail do we need? – Eg suggestions for contents of data on links?

, QMUL 4 L1Calo UK Upgrade Meeting L0Topo & L1Calo ● L0Topo: – Assumed to be similar to phase 1 TP ● Though different numbers of links and data content ● Might share crate with CTP? – Not much extra to say? ● L1Calo – Just use proposal from Dave Sankey

, QMUL 5 L1Calo UK Upgrade Meeting L1Topo ● Very little work on this – Any ideas for topological algorithms including L1Track? ● We only have some simulation of L1Track/Calo matching for electrons (in a way that would veto gammas) ● Architecture? – Guess some crossbreed between L0Topo and L1Calo – Few modules each getting all the information but running different algorithms – Possibly using CPUs and/or graphics processors – Little idea of data volume from L1Track ● Can guess L1Calo/L1Muon similar to L0Topo, scaled by L1A/L0A rate ● Overlap/integration with CTP? – Also question for L0Topo

, QMUL 6 L1Calo UK Upgrade Meeting ROD ● Default assumption – One common ROD for L0Calo/L0Topo/L1Calo/L1Topo ● One ROD per crate? – Separate ROD crate with fibre links from source modules ● Probably would fit better with future DAQ upgrade ● No room in L0Calo crates (in Sams proposal) ● Abandon any idea of RODs in same crate? – Handle both L0 and L1 readout? ● Only L1 would be simpler and less bandwidth ● But L0 readout of L0Calo/L0Topo would allow more monitoring – Not that we used monitoring features in the present ROD ● Any comments?

, QMUL 7 L1Calo UK Upgrade Meeting Institute Responsibilities ● Difficult subject! – Especially if we are not yet sure about L0/L1 split ● Does the TP need to define this? – If so, impact on architecture is needed now

, QMUL 8 L1Calo UK Upgrade Meeting Miscellaneous Thoughts ● TCM – Ian proposes no TCM for demonstrator but adding one later – My recollection is that the TCM added delay to the project ● We never had the right TCM in the right institute at the right time ● Tests regularly delayed with consequent impact on the schedule – If we can have a TCM-less demonstrator why not stay like that? ● ETSI (23”) crates – Extra wide crates appealing for Sams L0Calo architecture and also favoured by Daves L1Calo proposal – But incompatible with present USA15 infrastructure – Can probably be installed as part of a major long shutdown – But hard to add one for parasitic tests with the real system ● Argument to try to stick with 19” crates if at all possible?