2011-04-08E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.

Slides:



Advertisements
Similar presentations
FC7 AMC FMC carrier for CMS
Advertisements

Shelf Management & IPMI SRS related activities
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
Creotech Instruments Jacek Kosiec On behalf of.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
The First HCAL Readout Schedule! (7/22/99 UMD meeting)
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Current DCC Design LED Board
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
A Compact Trigger Architecture for SLHC
DHH progress report Igor Konorov TUM, Physics Department, E18
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
The Train Builder Data Acquisition System for the European-XFEL
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Task T - CMS at LHC Global Calorimeter Trigger
Trigger Upgrade Planning
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Status of the oSLB project
AMC13XG (XG = Ten Gigabit)
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
CMX Status and News - post PRR -
FED Design and EMU-to-DAQ Test
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
Presentation transcript:

E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration

E. Hazen2 AMC13 Status ● What is AMC13? (review) ● Potential users ● DAQ Interface ● Status / Plans ● M&S Cost

E. Hazen3 Spartan 6 Virtex 6 GT X SFP GT X SFP GT X SFP GT X IO SFP? CD S 128 Mbyte DDR3 GT P Flash IO TTC DAQ 6Gb/s Spar e MMC uC IPMI GbE JTAG LED s MCH1 Front Panel via T3 Fabric A 12 ports £ GB/s Fabric B 80 MB/s CLK F/O 40.xx CLK To AMCs CMS AMC13 Module Block Diagram Optional RAM DAQ 6Gb/s 2:1 Switc h

E. Hazen4 AMC13 Board Stack T1 T2 T3 T4 New custom T1 base board MMC functions (as AMC-13) TTC optical rx 3 or 4x SFP Cross-over GbE from MCH1 for controls and local DAQ Clocks board Clock / controls fanout T3 board Provides JTAG / LEDs on front panel Crosspoint switch for trigger applications (could be omitted if some other solution is found for front panel) ● Base configuration has only tongues 1, 2 ● Base board - With optics and HS links (Fabric A) ● Clocks board - distributes LHC clock and controls ● Mezzanine connector for T3 with I2C ● T3 has JTAG and LEDs Connector to T3 provides: Power Serial bus (SPI or I2C) from MMC Front-panel signals: JTAG or SPI for miniUSB Status LEDs Quad SFP+ Cage

E. Hazen5 AMC13 Users ● HCAL – 16 crates ● RCT – 6 crates ● Assisting in design (provided MMC) ● Will use AMC13 for either CCT or TMT options ● GT – 4? crates ● Discussed at some length this week ● GCT ? DTTF ?

E. Hazen6 DAQ Upgrade ● FRL will eventually be replaced by Fiber... the question is when, and what protocol. HCAL will be first with some number of FEDs during 2013 shutdown ● Intensive negotiations continue... in my opinion an adapter will not be required, but stay tuned!

E. Hazen7 AMC13 Progress ● Schematics are done! ● T1 layout is done! T2 should be done this week ● BOMs are available!

E. Hazen8 AMC13 Plans / Schedule ● T1+T2 layout ready for review this week ● Internal review (only) for prototype (by engineers, perhaps Frahm, Gorsky, Iles) ● Fabricate 10 pieces (plus spare parts) ● Aim for mid-July delivery of assembled boards ● Distribute to Early Adopters after smoke test (August) ● Develop early firmware (based on DTC) during PCB fab/assembly ● Integrate with MiniCTR2C Sept-Nov ● … further planning must fit with HCAL schedule ● This depends on continuous funding!

E. Hazen9 AMC13 M&S Costs ● For 10 pieces (BU was allocated $5k M&S this year)