L1Calo Upgrade Phase 2 ● Phase 2 Functional Blocks? – Thoughts on L1 “refinement” of L0 ● Simulation framework ● Phase 1 Online SW Murrough Landon 2 February.

Slides:



Advertisements
Similar presentations
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
Advertisements

The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
S. Silverstein For ATLAS TDAQ Level-1 Trigger upgrade for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
JFEX Uli Schäfer 1 Mainz. Jet processing Phase-0 jet system consisting of Pre-Processor Analogue signal conditioning Digitization Digital signal processing.
FEX Uli Schäfer, Mainz 1 L1Calo For more eFEX details see indico.cern.ch/getFile.py/access?contribId=73&sessionId=51&resId=0&materialId=slides&confId=
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
JFEX baseline Uli Schäfer 1 Uli. Intro: L1Calo Phase-1 System / Jets Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM.
S. Rave, U. Schäfer For L1Calo Mainz
R3 for ABCN Discussion Feb 2011R3 for ABCN Discussion Regional Readout Level-1 Muon/Calo system identifies a Region of Interest (RoI)Level-1 Muon/Calo.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
Algorithms and TP Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, Heidelberg, January 11-13, 2010.
JFEX Uli Schäfer 1. Constraints & Numerology Assumption: one crate, several modules. Each module covers full phi, limited eta range Data sharing with.
2003 Conference for Computing in High Energy and Nuclear Physics La Jolla, California Giovanna Lehmann - CERN EP/ATD The DataFlow of the ATLAS Trigger.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Mark Thomson University of Cambridge WP6: L1Calo Upgrade.
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
17 December, 2010 ATLAS L1Calo upgrade meeting Meeting overview Recent hardware developments, ideas.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
ROD Activities at Dresden Andreas Glatte, Andreas Meyer, Andy Kielburg-Jeka, Arno Straessner LAr Electronics Upgrade Meeting – LAr Week September 2009.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Samuel Silverstein, Stockholm University For the ATLAS TDAQ collaboration The Digital Algorithm Processors for the ATLAS Level-1 Calorimeter Trigger.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Phases: to be 2 or to be B? The question of new timescales ● L1Calo phase 2 → phases B and C? ● Implications for design ● Example timescales ● Organising.
Online Software Status ● Overview ● Recent Changes ● Required Changes ● Desirable Changes ● Upgrade ● Summary Murrough Landon 1 July 2009.
L1 Technical Proposal: Phase 2 ● Slow progress on writing TP phase 2 – Distractions with beam and calibration – Also some things are still unclear ● Hence.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Phase 2 L1Calo/Calo Interface ● Introduction ● Calo RODs ● Granularity and algorithms ● Calo-L1Calo links ● L1Calo design? ● Summary Murrough Landon 9.
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
ATLAS calorimeter and topological trigger upgrades for Phase 1
L1Calo Upgrade Phase 2 Introduction and timescales
Communication Models for Run Control with ATCA-based Systems
L1Calo Requirements on the DPS
Demonstrator Slice Possibilities and Timetable
L1Calo Phase-1 architechure
L1Calo upgrade discussion
for the transition region on behalf of the RPC upgrade group
ATLAS L1Calo Phase2 Upgrade
Online Software Status
Possibilities for CPM firmware upgrade
Run-2  Phase-1  Phase-2 Uli / Mainz
The First-Level Trigger of ATLAS
Level-1 Calo Monitoring
ATLAS: Level-1 Calorimeter Trigger
SVT detector electronics
Presentation transcript:

L1Calo Upgrade Phase 2 ● Phase 2 Functional Blocks? – Thoughts on L1 “refinement” of L0 ● Simulation framework ● Phase 1 Online SW Murrough Landon 2 February 2010

, QMUL 2 L1Calo Upgrade Phone Meeting “L1Calo” Functional Block Diagram?

, QMUL 3 L1Calo Upgrade Phone Meeting “L1Calo” Functional Block Summary ● L0Calo ● Big system (64 modules, 8 crates?), ~40Tbit/s ● L0Topo/Merger ● One or few modules(?), ~2Tbit/s – May be fairly simple: do we need much more than merging for L0 RoIs? ● L1Calo ● One full crate system?, ~2Tbit/s, very complex FW – Limited rate reduction (π0 rejection), may not be needed? Or phase 2.5? ● L1Topo ● One or few modules(?), few Gbit/s ● ROD ● Scattered system (1 module per crate?) – HW/FW/SW experts willing & able to travel to all test rigs!

, QMUL 4 L1Calo Upgrade Phone Meeting Functional Blocks: Separate or Combine? ● L0xxx and L1xxx – Running at different rates (40 MHz vs 500 kHz) – Easier to keep separate? ● Except L0CTP & L1CTP? – Combine to provide RODs & FEs with single L0/L1 interface? – But then single CTP needs sets of L0 and L1 trigger inputs ● *Topo and *CTP? – CTP has detector interface and inputs from other triggers ● Luminosity, forward, calibration triggers, etc – Keep CTP separate from topological triggers? ● But *Topo would probably take over MuCTPI function? ● Unless separate MuCTPI makes it easier for L1Calo group to provide the L*Topo systems?

, QMUL 5 L1Calo Upgrade Phone Meeting L1Calo (phase 2) Functional Block (1) ● No need for L0 RoIs? – Must have fibre(s) from each ROD/mezzanine anyway ● Some RODs (FCAL?) may be hot: send data every L0A – Plenty of latency available: simplest to send everything? ● Strips are 50% of the data, so everything is only factor 2 more – Rerun all algorithms at L0A rate, now with full granularity ● Input Data Volume – All calo cells preprocessed to give Et, time, quality flags ● Say 20 bits/cell, 200k cells => 4 Mbit data (compressible?) ● On LAr RODs, ~500 cells/mezzanine => 10 kbit per 0.4*0.2 eta*phi ● Transmit in about 0.5µs over one 20 Gbit/s fibre ● Tile: one such fibre per ROD is more than enough – Average L0A rate 500 kHz (ie 1 per 2µs) ● Need some derandomising, limits on instantaneous L0A rate ● Even with 2µs transmission latency, still several µs left for logic

, QMUL 6 L1Calo Upgrade Phone Meeting L1Calo (phase 2) Functional Block (2) ● Total L1Calo Input and Output – Total ~512 * 1 fibre per mezzanine => Gbit/s fibres ● EM 432 mezzanines, LarHad 32 mezzanines, Tile ~64 ● Output: 8 fibres, one per 0.8*0.8 RoI map (as L0Calo)? ● Example Architecture – Single crate, eight modules – 64 * 20 Gbit/s fibres/module – Module covers 0.8 in eta and all phi ● 100% fanout to neighbours

, QMUL 7 L1Calo Upgrade Phone Meeting Phase 2 Simulation Framework ● Need new simulation toolkit for phase 2 – New summing of cells to minitowers – New algorithms run on these minitowers – Would like several variants of them – Volunteers?

, QMUL 8 L1Calo Upgrade Phone Meeting Phase 1 Module Services SW ● How to communicate with modules? – Existing: SW layer over VME driver to FW register model ● Proposed phase 1 TCM: ethernet to all modules – Keep vaguely similar SW model? ● ATCA modules stay fairly dumb (as seen by SW!) ● New protocols for SW to address registers/memories ● SW running elsewhere loads data into modules – Or ATCA modules get smarter? ● Use CPU cores in FPGA ● SW runs in the module – Still need some model to interact with FW ● Module fetches its data from external sources – Any idea how other ATLAS groups are thinking?