Mini-workshop on Laser pulse – shaping Zeuthen (30.11.-1.12.2006) Online observation of pulse energy.

Slides:



Advertisements
Similar presentations
PMT absolute calibration using the Rayleigh scattering in Nitrogen air PMT absolute calibration using the Rayleigh scattering in Nitrogen air S. Yoshida,
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
The dawn of a new era Beams! Beams! Beams!. The first results are in 16 bunch train – Qtot = 560 nC – Bbunch = 35 nC 32 bunch train – Qtot = 600 nC –
Output to accelerator area drive laser: MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz,
Diamond Radiator Development Brendan Pratt University of Connecticut GlueX Collaboration Meeting, Jefferson Lab, October 2011.
M. Bonesini - 3/10/061 M. Bonesini INFN Milano Some results from BTF testbeam on TOF.
The result of GoldenDOM Calibration Hiroko Miyamoto T.Noda, S.Yoshida, K.Mase K.Hoshina, M.Krasberg, K.Hanson, C.Rott Chiba University, UW Madison, PSU.
PULSE REPETITION RATE OPTMIZATION IN SLR STATIONS TO PROVIDE MINIMUM SYSTEMATIC ERROR OF RANGING M.A. Sadovnikov M.A. Sadovnikov Institute for Precision.
Injector RF Design Review November 3, 2004 John Schmerge, SLAC LCLS RF Gun Thermal Analysis John Schmerge, SLAC November 3,
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
Bill White Drive Laser April 16, Drive Laser Commissioning Experience Reminder of requirements on Drive Laser.
LGS diagnostics Results (so far) Anna Moore, Hal Petrie LGS facility meeting 30 th Jan 2007.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
Frequency to Voltage Converter and Voltage to Frequency Converter Where an instrumentation system is based mainly on capturing voltage signals (analogue.
Laser Notcher Pulse Energy Requirements & Demonstration Experiment David Johnson, Todd Johnson, Vic Scarpine.
PD Kobe Univ. 06/29/2007 General performance of the IceCube detector and the calibration results I am Mina Inaba from Chiba university. I will.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
Created By group what is the meaning of sensor evaluation?? 2- how to evaluate the sensor?? Size—Sensitivity—Robustness--Standardization--Stability-
October 30th, 2007High Average Power Laser Program Workshop 1 Long lifetime optical coatings for 248 nm: development and testing Presented by: Tom Lehecka.
Motivation There is a consensus that it is not possible to obtain a software (π 0 ) calibration with few days delay (this is to be verified, this is the.
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
FLASH. Free-Electron Laser in Hamburg Long Trains, High Beam Loading Possibilities for high-current long bunch train running at FLASH Siegfried Schreiber.
PESP-2002 Sept High Power Diode Laser System for SHR D.Cheever, M.Farkhondeh, B.Franklin, E.Tsentalovich, T.Zwart MIT-Bates Linear Accelerator.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
HCAL General Meeting: DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova Frank Chlebana HCAL General Meeting Apr 21, 2011.
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
#3205 Summary 6 th Nov 2012 Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University The Uniformity measurement of.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Photodetection EDIT Absolute Measurement of the Quantum Efficiency of a Classical PMT Task: measure the QE of a PMT in the wavelength interval 200 to 800.
OSETI with MAGIC IntroductionIntroduction Radio SETIRadio SETI Optical SETIOptical SETI OSETI with MAGICOSETI with MAGIC SummarySummary July 2004.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
MAX IV linac overview and scope of automation Sara Thorin.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, The University of Tokyo MEG VRVS meeting Jan. 20th, 2004.
DECam Spectrophotometric Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
Wild ideas on photon detection P.Kooijman, NIKHEF.
Date of download: 9/18/2016 Copyright © 2016 SPIE. All rights reserved. Schematic of the OPCPA laser system at Sandia National Laboratories. A stretched.
Plans for this week Preparation of Master course ...
Plans for this week MWPC: wire stretching today
Laser Geiger cell (update)
PMT characterisation for the KM3NeT Project
Drive-Laser Commissioning Status and Plans
E- source R&D update ILC source laser project Faraday rotation experiment A. Brachmann 05/07/07 SLAC R&D meeting.
Kröhnke, 14 November 2012 FCAL Collaboration Meeting Sergej Schuwalow
Drive laser specifications:
HLT & Calibration.
Instrumentation for Colliding Beam Physics 2017
Parity Quality Beam (PQB)
T.K. Hemmick for the Stony Brook Crew
GaAs Photocathode Performance
Resource Efficiency at Work
ورود اطلاعات بصورت غيربرخط
Resource Efficiency at Work
LCLS Commissioning Parameters
Data science online training.
Update on Laser ‘Aftershock’ Triggers
On behalf of the Caltech Laser Group
High harmonic generation in a large-volume capillary for seeding of free-electron lasers Siew Jean Goh.
Drive laser specifications:
Drive Laser Commissioning Status
Invisible and Visible Laser Radiation — Avoid Direct Eye Exposure
Presentation transcript:

Mini-workshop on Laser pulse – shaping Zeuthen ( ) Online observation of pulse energy

Mini-workshop on Laser pulse – shaping Zeuthen ( ) Why do we need this? 1.At the moment no absolute information on laser pulse energy hitting the cathode 2.Experiments on Quantum efficiency (QE) of cathode materials are foreseen

Mini-workshop on Laser pulse – shaping Zeuthen ( ) Current energy measurements: - “online” with virtual cathode - “offline” with Powermeter Problems: - no absolute long-term calibration of PMT (e.g. degradation effects) - possible drift of PMT-signal within one pulse-train => Use of calibrated Photodiode

Mini-workshop on Laser pulse – shaping Zeuthen ( ) Disadvantages of Photodiodes: 1.Limited range of measurable energies (typically 100nJ – 1mJ) 2.Effected by x-rays 3.PD as energy sensors are limited to rep. rate of max. 10kHz Solutions: 1.Special Silicon-diodes exist for desired range of 1-100nJ 2.Shielding is no problem 3.Next slide…

Mini-workshop on Laser pulse – shaping Zeuthen ( ) Idea: Pick one pulse out of every train and measure the energy (-> rep. rate only 10Hz) Trigger => Calibration of PMT possible for every pulse train

Mini-workshop on Laser pulse – shaping Zeuthen ( ) Problem with Pockels cell driver : custom made!!!