Preinjectors Status D. Raparia March 22, 2016 Time Meeting.

Slides:



Advertisements
Similar presentations
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Advertisements

Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
EAR2 simulation update Collaboration board meeting Christina Weiss & Vasilis Vlachoudis.
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
RHIC Run th Time Meeting Tuesday 8 May 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 05/08/2012 Time Meeting, Run 12.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerators. Electron Beam  An electron beam can be accelerated by an electric field. Monitors Mass spectrometers  Any charged particle can be accelerated.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department Take 5 for Safety.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Linac Status May 19, 2015 Time Meeting D. Raparia.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
J. Alessi Overview EBIS Project Technical Review 1/27/05 An EBIS-based RHIC Preinjector - Overview Jim Alessi Preinjector Group Collider-Accelerator Department.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
Maintenance and Accelerator Support RHIC Start Up 12.
DOE Review 3/18/03Steve Brice FNALPage 1 MiniBooNE Status Steve Brice Fermilab Overview Beam – Primary Beam – Secondary Beam Detector – Calibration – Triggering.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
RHIC Run 12 7 th Time Meeting 21 February 2012 WELCOME Safety SP's slide Experiments and Machine, status 1 02/21/2012 Time Meeting, Run 12.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Linac Status June 16, 2015 Time Meeting D. Raparia.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Material and thickness for pi0 Y.Sudo Univ. of Tsukuba 2008/07/18.
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
BLIP Status  Safety o Ni-63 contamination in TPL (~a week ago) – Decontamination mostly complete, maybe complete decontamination today  Production o.
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
D. Raparia2005/01/27-28 MAC Review EBIS Injector Linac Optics I I D.Raparia EBIS Review 2005/01/27-28 HEBT Booster Injection.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
Accelerator Support and Maintenance Startup for Run 13.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
HEBT Design Considerations Jingyu Tang, Xiangqi Wang, Hao Hao, Jiajia Tian IHEP, USTC International Review Meeting on Accelerator Physics Design of C-ADS,
1 RHIC NSRL LINAC Booster AGS Tandems STAR 6:00 o’clock PHENIX 8:00 o’clock 10:00 o’clock Polarized Jet Target 12:00 o’clock RF 4:00 o’clock (AnDY, CeC)
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
ANNE I. S. HOLM AARHUS UNIVERSITET INSTITUT FOR FYSIK OG ASTRONOMI BASELINE DESIGN OF THE ESS HIGH ENERGY BEAM TRANSPORT LINE ANNE I. S. HOLM.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
Preinjectors Status D. Raparia January 26, 2016 Time Meeting.
Preinjectors Status D. Raparia April 26, 2016 Time Meeting.
ATF2 Status N.Terunuma, KEK
NICA injection complex status
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
JLEIC ion source: specifications, design, and R&D prospects
Alexander Herlert, CERN (PH-SME-IS)

Bubble Chamber Planning Meeting
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Isotope Readiness Review Run Plans
Presentation transcript:

Preinjectors Status D. Raparia March 22, 2016 Time Meeting

Tandem Status Booster finish D+ from Tandem for now This week Ru to booster D. Raparia

EBIS Status EBIS running smoothly Au with 12 pulses NSRL running with Iron Helium beam was tested in the EBIS on Sunday D. Raparia

EBIS intensity after Linac D. Raparia

Linac Status Linac running for very stably BLIP at 117 MeV BLIP BLIP running at 155 uA as requested Proton for NSRL at 117 MeV from high intensity source 3/16: GaAs target (~3 HRS) 3/17: Linac timing system problem (1 HRS) 03/21: Beam profile tuning (FWHM 13 mm to 10 mm) (4 hrs) 03/23: Maintenance (3-4 HRS) D. Raparia

Average Current for BLIP & Beam on HRS/day Beam on 161.3 HRS out 168 HRS Linac Timing System GaAs Target D. Raparia

J. Nelepa D. Raparia

Beamline Location 21’ 14’ plunging harp plunging harp (opposite side) 6.50” collimator bellows (3x) raster magnet steering magnets (existing, 2x) 4.00” collimator plunging harp (opposite side) laser profile monitor beam current transformers (2x) beam position monitor beryllium window (existing) aluminum bellows (existing)