Preinjectors Status D. Raparia April 26, 2016 Time Meeting.

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
RHIC Run th Time Meeting Tuesday 8 May 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 05/08/2012 Time Meeting, Run 12.
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
experimental platform
September 12, 2013 PSTP 2013 G. Atoian a *, V. Klenov b, J. Ritter a, D. Steski a, A. Zelenski a, V. Zubets b a Brookhaven National Laboratory, Upton,
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
Analytical capability of neutron sensor incorporated into UNCOSS ROV Project meeting and workshop: Dubrovnik 30th November and 01st December 2011.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department Take 5 for Safety.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
Linac Status May 19, 2015 Time Meeting D. Raparia.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
J. Alessi Overview EBIS Project Technical Review 1/27/05 An EBIS-based RHIC Preinjector - Overview Jim Alessi Preinjector Group Collider-Accelerator Department.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Beam diagnostics in the beamlines
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
Linac Status June 16, 2015 Time Meeting D. Raparia.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
BLIP Status  Safety o Ni-63 contamination in TPL (~a week ago) – Decontamination mostly complete, maybe complete decontamination today  Production o.
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Shielding review for temporary spectrometer for RUBICON experiment, ATF beamline #2 K. Kusche, M. Fedurin RSC meeting, Jan 20, 2015.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
FETS Laserwire Status David Lee
Accelerator Support and Maintenance Startup for Run 13.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Preinjectors Status D. Raparia January 26, 2016 Time Meeting.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
G2p/GEp Beamline Status Tim Michalski Project Lead.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Bubble Chamber Schedule – 2017
N. Simos With help from Paola & Elena
Availsim runs and questions
Overview of LERF Status, Plans and Goals
BC2 Commissioning Parameters
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Bubble Chamber Planning Meeting
Run16 Y. Akiba.
Operations Department
Operations Department
LCLS Injector Commissioning Dates ( )
Riad Suleiman February 2, 2017
On behalf of the Caltech Laser Group
Installation and Beam Test Schedule
Linac LLP Outline LINAC Long Lead Procurements
Drive Laser Status and Hand-Off to Operations
Drive Laser Status and Hand-Off to Operations
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Pair Production Analysis
LCLS Control System Personnel Linac & BC2 Controls progress
Isotope Readiness Review Run Plans
Presentation transcript:

Preinjectors Status D. Raparia April 26, 2016 Time Meeting

Tandem Status Ru with pulse, 12 pulses in TTB Will start D+ May 4th in TTB ( for present schedule, May 7) D. Raparia

EBIS Status EBIS running smoothly Au with 12 pulses NSRL last week: Silicon, Helium NSRL this week: Iron, Titanium, Carbon, Laser 3: change with spare one Laser 3 send back to factory for repair D. Raparia

Au at IHLinac for 12 pulses D. Raparia

Linac Status Linac running for BLIP at 117 MeV BLIP at 150 -160 uA 4/19-4/25: 200 MeV to BLIP 4/25-4/29: 200 MeV PP 4/25-4/29: 200 MeV PP to Polarimeter 4/19: Switch to 200 MeV for BLIP (2 HRS) 4/20: PQ49 PS adjustment (0.5 HRS) 4/21: Tank 6 sparking (0.5 HRS) 4/25: switch back to 117 MeV (1 HRs) D. Raparia

Average Current for BLIP & Beam on HRS/day Beam on 163.8 HRS out 168 HRS Energy Change 200 MeV D. Raparia

J. Nelepa D. Raparia

Beamline Location 21’ 14’ plunging harp plunging harp (opposite side) 6.50” collimator bellows (3x) raster magnet steering magnets (existing, 2x) 4.00” collimator plunging harp (opposite side) laser profile monitor beam current transformers (2x) beam position monitor beryllium window (existing) aluminum bellows (existing)