Arranging Bugdget Plan of Construction Cost (RAB) Calculating construction RAB of House Building, water building and Bridge By: SMK NEGERI 5 SURAKARTA.

Slides:



Advertisements
Similar presentations
Civil engineer is the person who is responsible for the planning and construction of structures such as buildings, roads, bridges, dams and ports. His.
Advertisements

TECHNOLOGY AND ENGINERRING SKILL STUDY PROGRAM : BUILDING TECHNOLOGY SKILL COMPETENCE : DRAWING BUILDING TECHNOLOGY.
DIFFERENCE OF STUDIO MAKING OF MASTER AND RECORD Competency : Principle of master making.
DIFFERENCE OF VCD AND DVD
COMPOSITE VIDEO SIGNAL PARTS EXPLAINING BASICS VIDEO SIGNAL By. Sarbini, S.Pd (SMK Muh 3 Yogyakarta)
COMPACT CASSETE RECORDER MAINTENANCE Competency : Repairing of Compact Cassete Recorder.
TROUBLE SHOOTING OF VCR Competency : Improve signal reproduction means of audio video compact cassete.
TUNING AND AMPLIFIER Competency : Repairing of Radio Recei.
MAINTENENCE AND REPAIR OF DVD PLAYER Competency : Improve signal reproduction means of audio video CD.
INSTALATION OF DVD PLAYER Competency : Improve signal reproduction means of audio video CD.
Doing Home Theater Installer EQUIPMENTS OF HOME THEATER WITH 4.1 OR 6.1 CONFIGURATION TO INSTALLER.
DUPLICATION PROCESS Competency : Making audio record in studio.
ACID BASE INDICATOR SMK NEGERI 13 BANDUNG Acid – Base Indicators Weak organic acid or weak organic base which it’s ion colour differ from its molecule.
Cleaning Glassware Apparatus SMK Negeri 13 Bandung.
IMPLEMENTING CONTRUCTION MEASURING
DETERMINE PROCEDUREAND REPAIR PRISE CALCULATE REPAIR PRISE
APPLYING THE BASICS OF PICTURE TECHNIQUE
Determination of Fe SMK Negeri 13 Bandung.
Making picture of construction applying.
Competency: Repairing of CD Player
CALCULATION NEEDS WORK CONSTRUCTION MATERIALS WOOD
Technology and Engineering
Identify House Building Science
IMPLEMENTING JOB OF SCAFOLDING
Face and compass mapping
IMPLEMENTING SCAFFOLDING JOB
TECHNOLOGY AND ENGINERRING
Technology And Engineering
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING
Identifying House Building Science
Making Picture of construction Application
Teknik Dasar Perkapalan
PLAN WOOD CONSTRUCTION JOB
Competency: Installation Sound System
Stoichiometry SMK Negeri 13 Bandung.
Tecknology and Engineering
FOOD-STUFF ANALYSIS SMK Negeri 13 Bandung.
Implementing Finishing Job of Building
Applying of Work Health and Work save
MEASUREMENT INSTRUMENT
HEATING APPARATUS SMK Negeri 13 Bandung.
Understanding Material of Building
EXPLAINING PICTURE FORMATION SYSTEM
Teknologi Dan Rekayasa
LATHE MACHINE OPERATIONAL 1. Installing live centre in tail stock
IMPLEMENTING PRE MOULDED CONCRETE JOB
Gravimetric Analysis SMK Negeri 13 Bandung.
Applying Statistic Science And Tension
BASIC VOCATIONAL MACHINING TYPE MACHINERY : LATHE MACHINE MILL MACHINE
Competency : Repairing of Radio Receiver
Teknologi Dan Rekayasa
Identifying House Building science
Applying the basics of technical drawing
Explain Basic Tecnical Drawing
WORKING PRINCIPLE OF CD PLAYER
Glassware and Ceramic Store Technique
BURNER SMK Negeri 13 Bandung.
Making Picture of Construction Application
Teknologi Dan Rekayasa
Applying Building Material Checking
IMPLEMENTING JOB OF BUILDING FINISHING
Arranging Budget Plan of Construction Cost (RAB)
Arranging Budget Planning of construction cost (RAB)
Teknologi dan Rekayasa
REPAIRING GLASS VEHICLE
Teknologi dan Rekayasa
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Unit 3 Review (Calculator)

Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
Presentation transcript:

Arranging Bugdget Plan of Construction Cost (RAB) Calculating construction RAB of House Building, water building and Bridge By: SMK NEGERI 5 SURAKARTA

Teknologi dan Rekayasa The goals of Learning 1.Student can calculate cost of house building making. 2.Student can calculate cost of road which is asphalted. 3.Student can calculate cost of slope making for water canal.. 4.Student can calculate cost of bridge making.

Teknologi dan Rekayasa The calculation of RAB includes:I 1.Material analysis 2.Labour analysis 3.The prize per unit of material 4.Data labour wages 5.Volume of Job 6.Analysis prize of the job