H4 beam line for GIF Adrian Fabich, EN-EA-LE GIF users meeting, 17 th February 2016.

Slides:



Advertisements
Similar presentations
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Advertisements

11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
Some beam tuning musings from Fall 2004 runs David Hertzog.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
T. Horn, SHMS Optics Update SHMS Optics Update Tanja Horn Hall C Users Meeting 31 January 2009.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
Construction and Installation of the CLIC Experimental Area
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
East Area Secondary Beam Control User Guide L.Gatignon / AB-ATB 12 June 2008.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
PSI July 2002MuEGamma Review Meeting1 Beam Line Status update 1.  E5 Test Beam Overview : Aims + RequirementsAims + Requirements Zone Layout + Measurement.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
Shielding review for temporary spectrometer for RUBICON experiment, ATF beamline #2 K. Kusche, M. Fedurin RSC meeting, Jan 20, 2015.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
High Energy Neutron and Proton Irradiation Facilities at TSL Alexander Prokofiev, , 6th LHC Radiation Workshop 1.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
g beam test of the Liquid Xe calorimeter for the MEG experiment
Rachel Margraf Supervisor: Nikolaos Charitonidis
T980 STATUS AND CHANGES FOR
MICE Operations Scenario Run 1
Configuration Management and Layout Database ELENA Project
Shift instructions August 16, 2017 Antoni Aduszkiewicz
DAMPE Status (T9) Steadily taking data since last Thursday
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
of secondary light ion beams
of secondary light ion beams
On the ARIEL Pre-separator
James Ridewood BE-OP-SPS
Test beam setup: status report 10/02/2009
AD & I : BDS Lattice Design Changes

Beam Injection and Extraction Scheme
CNGS Primary Beam Results 2010
Beam requirements and operational scenarios in 2010
LHC commissioning Week 38
2003 test beam with 25 ns bunched muons
Sunday
Hall C Users Meeting 31 January 2009
Experimental Areas – LS2 planning
Status Report and highlights from workshop II
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Presentation transcript:

H4 beam line for GIF Adrian Fabich, EN-EA-LE GIF users meeting, 17 th February 2016

Overview 17/2/2016 A. Fabich, EN-EA-LE2  Beam optics and beam elements  Logging data  Magnets, collimators, XTDV  TIMBER data access (GUI to logging data)  GIF periods during 2015  27 th – 31 st August GIF period  21 st October – 4 th NovemberRD51+GIF

SPS North Area - schematics 17/2/2016 A. Fabich, EN-EA-LE3

EHN1 layout and GIF 17/2/2016 A. Fabich, EN-EA-LE4 EDMS doc. SPSXLHN m 340 m 620 m GIF 480 m PPE134

Beam line - optics 17/2/2016 A. Fabich, EN-EA-LE5

Logging database 17/2/2016 A. Fabich, EN-EA-LE6   Settings/readings of beam elements  XTDV only from 2016 onwards  Steps1-2: choose/add beam elements  Step 3: query for period of interest (download as ASCII file or graph)

Experimental scalers 17/2/2016 A. Fabich, EN-EA-LE7  Count rates from users’ setup  EXPT.GIF.001 to EXPT.GIF.004 – you define the registered counter: e.g. large scintillators/coincidence 31/10 4/11 27/1023/10

Beam performance changed? 17/2/2016 A. Fabich, EN-EA-LE8 Use CESAR for verification of settings  If beam performance changed e.g. EXPT.GIF.001 as reference  Check either individual status windows (access, magnets …)  Or quick view on NOTIFICATION pane Indicating all elements different from REFERENCE Beam line scintillators: XSCI , XSCI , XSCI  Typical hick-ups are  No beam from SPS  Access: XTAX closed, bends OFF  Magnet element failed (restart or call CCC) …

XTDV mobile dump 17/2/2016 A. Fabich, EN-EA-LE9  XTDV separating PPE134 and GIF (PPE154)  PPE143 e.g. hosting RD51  Stops all beam but muons  Reference setting during GIF periods: IN-BEAM

Collimators - default 17/2/2016 A. Fabich, EN-EA-LE10  Coll are typically open around center position  Coll are used for selection  Hadron+muon beam: OPEN (a few millimetre or more at center position)  Muons only: CLOSED (e.g. Coll 08=+38/+40, Coll 09=-40/-38) Do not close below a slit gap of 2 mm (might get stuck)

Collimators - logging 17/2/2016 A. Fabich, EN-EA-LE11 All collimators with constant settings  Minor clean-up early in the line for intensity  Left or right closing gap is not relevant

Dipoles 17/2/2016 A. Fabich, EN-EA-LE12 Goliath Main B3 (access veto) Main B4 (access veto) Main B5 (access veto) Main B6 Main B7 horiz B8 horiz B9 horiz B12

Spectrometer magnets in PPE134 17/2/2016 A. Fabich, EN-EA-LE13 Deflect the beam by typically a few mrad  Resulting in an offset of up to 0.5 m at GIF  So far only horizontal deflection CESAR magnet status

Beam focussing 17/2/2016 A. Fabich, EN-EA-LE14 Final focussing

Beam schedule 17/2/2016 A. Fabich, EN-EA-LE15  Beam setup during NA setup  Be prepared for first performance checks  First dedicated GIF period in the first beam weeks.

Air conditioning 17/2/2016 A. Fabich, EN-EA-LE16  Industrial order is with Finance  Planning meeting still this week  Minimizing impact on GIF operation

Conclusions 17/2/2016 A. Fabich, EN-EA-LE17  Default beam settings known  Beam reference file will be provided.  Performance reproducible  All beam elements were re-aligned during YETS15/16.  Straight-forward instructions for checking beam performance available  Especially the spectrometer magnets can deteriorate the beam performance at GIF, e.g. during RD51 runs.  Follow-up from meeting discussion: which beamline elements are published on TIM/DIP?