Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 1 Control and Data Systems (WBS 1.6) Gunther Haller Scope Control.

Slides:



Advertisements
Similar presentations
LCLS Data Systems Amedeo Perazzo SLAC HSF Workshop, January 20 th 2015.
Advertisements

Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
Gunther Haller Parallel: X-Ray Controls & DAQ LCLS FAC Meeting 30 October Experimental Area Controls and Data-Acquisition.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
1 G. Haller 1 LUSI XCS FIDR June 17, 2009 XCS Photon Controls and Data Systems Gunther Haller XCS Instrument Final Instrument.
Robert C. Sass Facility Advisory Committee April XES Controls/DAQ 1 AMOS/LUSI Controls and Data Acquisition LCLS eXperimental End Stations (XES)
Gunther Haller Plenary: X-Ray Controls & Data LCLS FAC Meeting 29 October Experimental Area Controls and Data-Acquisition.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 G. Haller 1 LUSI CXI FIDR June 3, 2009 CXI Photon Controls and Data Systems Gunther Haller Coherent X-ray Imaging Instrument.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
Dr. Gunther Haller XES Controls & 11 July Experimental Area Controls and Data-Acquisition Gunther Haller Research Engineering.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
Readout & Controls Update DAQ: Baseline Architecture DCS: Architecture (first round) August 23, 2001 Klaus Honscheid, OSU.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Gunther Haller LUSI DOE Review Aug. 20, 2008 Controls (WBS 1.6) p. 1 Breakout Session G. Haller – Sub-System Manager August 20,
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
Particle Physics & Astrophysics Representing: Mark Freytag Gunther Haller Ryan Herbst Michael Huffer Chris O’Grady Amedeo Perazzo Leonid Sapozhnikov Eric.
D0 SAM – status and needs Plagarized from: D0 Experiment SAM Project Fermilab Computing Division.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
The ALICE DAQ: Current Status and Future Challenges P. VANDE VYVRE CERN-EP/AID.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Content: Introduction Architecture Future.
VLVnT09A. Belias1 The on-shore DAQ system for a deep-sea neutrino telescope A.Belias NOA-NESTOR.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
Gunther Haller SiD Meeting 26 October Electronics Systems Issues for SiD Dataflow & Power Gunther Haller Research Engineering.
Gunther Haller SiD Meeting January 30, 08 1 Electronics Systems Discussion presented by Gunther Haller Research Engineering.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
Yiping Feng LUSI DOE Review July 23, 2007 Breakout Presentations1 LUSI Experiment Needs Yiping Feng Fluctuations Diagnostic suite.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Bernd Panzer-Steindel CERN/IT/ADC1 Medium Term Issues for the Data Challenges.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
MicroTCA Development and Status
BaBar Transition: Computing/Monitoring
MPD Data Acquisition System: Architecture and Solutions
PC Farms & Central Data Recording
ATF/ATF2 Control System
X-ray Correlation Spectroscopy (WBS 1.4) Aymeric Robert
ALICE – First paper.
Trigger, DAQ, & Online: Perspectives on Electronics
LUSI Coordination with LCLS
Emanuele Leonardi PADME General Meeting - LNF January 2017
Experimental Facilities Planning
Photon beamline crates
Low Level RF Status Outline LLRF controls system overview
Stefan Moeller – XES Manager May 14, 2009
Low Level RF Status Outline LLRF controls system overview
LUSI Controls and Data Systems W.B.S. 1.6
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstations Update
LUSI Controls and Data Systems W.B.S. 1.6
NEH - Status Stefan Moeller.
Control Systems for the APTM and GRID
Coherent X-ray Imaging Instrument WBS 1.3
LTU/Undulator Installation Status
X-ray Correlation Spectroscopy Instrument
X-Ray Endstation Systems (XES) 2006 Schedule
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 1 Control and Data Systems (WBS 1.6) Gunther Haller Scope Control and Data Systems Architecture Control System Data System Team/Organization WBS Cost and Schedule Summary Scope Control and Data Systems Architecture Control System Data System Team/Organization WBS Cost and Schedule Summary

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 2 Scope – WBS 1.6 Control & Data Systems NEH Hutch 3: X-ray Pump-probe Instrument (WBS 1.2) FEH: Hutch 1: X-Ray Photon Correlation Spectroscopy Instrument (WBS 1.4) FEH Hutch 2: Coherent X-Ray Imaging Instrument (WBS 1.3) X-Ray Beam Direction Near Experimental Hall (NEH) Far Experimental Hall (FEH) Tunnel Separate WBS 1.6 to combine all LUSI control & data needs due to commonality in requirements, design, implementation, and integration

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 3 Scope LUSI Scope is Control and Data Systems for XPP instrument CXI instrument XCS instrument Common Controls and Data Systems for LCLS and LUSI G. Haller is manager for LUSI as well as for LCLS Benefit from common hardware and software solution LUSI Scope is Control and Data Systems for XPP instrument CXI instrument XCS instrument Common Controls and Data Systems for LCLS and LUSI G. Haller is manager for LUSI as well as for LCLS Benefit from common hardware and software solution

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 4 System Block-Diagram LUSI Control & Data Systems Control Subsystem for Operation & Controls Data Subsystem for Acquisition & Management, Online Processing LCLS Control System SLAC Sci. Computing & Computing Srvs. Data Farm (PB Tape Drive) Computer Cluster (2000 processor node) Data Archiving/Retrieval Offline Analysis/Rendering Timing & Triggering High peak rate/ large volume Pulse-by-pulse info exchange

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 5 Control & Data Systems Intensity Monitor Stages, Motors Software EPICS Firmware programming Hardware Cabling, racks, trays Controllers for Pumps Gauges, sensors Motors Signal processing Electrical Image Data acquisition and storage Workstations Data servers, storage arrays Network hardware Software EPICS Firmware programming Hardware Cabling, racks, trays Controllers for Pumps Gauges, sensors Motors Signal processing Electrical Image Data acquisition and storage Workstations Data servers, storage arrays Network hardware 2-D Detector EndstationControls & Data Systems Pumps Controllers Computers Local Storage

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 6 Control Sub-System VME-based IO Controllers VME PPC CPU’s Network Diffractometer Spectrometer Pump/GaugeMotors Sensors 1-Gb/s Network (LUSI Subnet) Remote Access Configuration Database Remote Access Server Application Framework Display Manager Device Program Layer App GUIEng GUI Based on EPICS, LCLS design Terminal Servers

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 7 Main Controls Devices Valves Ion pumps Turbo pumps Vacuum gauges Motors Encoders Limit switches Pneumatic actuators RF phase shifters Spectrum analyzers Cameras Waveform sampling devices Pulse-height sampling devices Power supplies Laser diagnostics devices Temperature control

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 8 Data Acquisition and Processing Acquire 120-Hz Images Without beam (dedicated calibration runs or in-between ~8-ms spaced beams) Images to be used to calculate calibration constants With beam Images which need to be corrected Event-building with 120-Hz accelerator timing & beam-quality data information Filtering of images (e.g. vetoing) Realtime pixel correction using calibration constants Processing of corrected images Example: Coherent imaging of single molecules Combine 10 5 to 10 7 images into 3-D data-set Learn/pattern recognition/classify/sort images, e.g. 1,000 bins Average bins Alignment Reconstruction ~ 5-Hz real-time display of images

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 9 Data Management and Scientific Computing Data Management Make LUSI data accessible for science Appropriate format(s) Appropriate storage/retrieval hardware and software Scientific Computing for LUSI Science Opportunities and needs being evaluated Very dependent on the detailed nature of the science Unprecedented size (for photon science) of data sets to be analyzed Unprecedented computational needs (for photon science) Comparable in scale to a major high-energy physics experiment Greater need for flexibility than for a major high-energy physics experiment

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 10 Data Sub-System Data Rate/Volume of CXI Experiment (comparable to other LUSI experiments) LCLS Pulse Rep Rate (Hz)120 Detector Size (Megapixel)1.2 Intensity Depth (bit)14 Success Rate (%)30% Ave. Data Rate (Gigabit/s)0.6 Peak Data Rate (Gigabit/s)1.9 Daily Duty Cycle (%)50% Accu. for 1 station (TB/day)3.1 Challenge is to perform data-correction and image processing while keeping up with continuous incoming data-stream Tradeoff between tasks implemented online versus offline Important to produce science output without piling up more and more raw images Difference to conventional experiments: High peak rate & large volume comparable to high-energy physics experiments such as SLAC

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 11 Data Acquisition/Mgmt Architecture Detector Control Node Quick View Rendering Node Disk Arrays/ Controller Tape Drives/ Robots Volume Rendering Node Volume Rendering Cluster ADC FPGA Online Data Server SCCS LUSI 4 x 2.5 Gbit/s fiber Offline Data Servers 2D Detector SLAC LCLS DAQ Box 10–G Ethernet Accelerator 120-Hz Data Exchange & Timing Interface Data system must be able to handle peak rate as well as sustain 120-Hz throughput (corrections, filtering) SLAC LCLS DAQ Box being developed by Particle Physics and Astrophysics Electronics Group (G. Haller) Highly scalable Very high CPU-memory bandwidth (8 Gbytes/sec) Data system must be able to handle peak rate as well as sustain 120-Hz throughput (corrections, filtering) SLAC LCLS DAQ Box being developed by Particle Physics and Astrophysics Electronics Group (G. Haller) Highly scalable Very high CPU-memory bandwidth (8 Gbytes/sec) Online Processors Detector-Specific Front-End Electronics

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 12 SLAC LCLS DAQ Box DAQ box contains custom SLAC Cluster-Element (CE) board Virtex-4 FPGA 2 PowerPC processors IP cores 512 Mbyte RLDRAM 8 Gbytes/sec cpu-data memory interface 10-G Ethernet science data interface 1-G Ethernet control interface EVG machine timing fiber interface 120-Hz machine beam-data interface RTEMS operating system EPICS Option: up to 512 Gbyte of FLASH memory Easily scalable If several CE boards are used Packaged in ATCA crate with network card Network card based on 24-port 10-G Ethernet Fulcrum switch ASIC Crate holds up to 14 CE boards Option to have up to 7 Tbyte integrated with high- speed memory access Network card interconnects multiple CE boards Network card interconnects multiple crates CE development board 10-G switch development board

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) WBS to Level Control & Data Systems Phys. Support Engineering Integration Cabling Computer HW Computers & Clusters Data Storage EPICS Prog, DAQ HW & FW Acquisition HW FPGA Prog Timing & Triggering Laser Ctrl & Safety Vacuum Ctrl Optics, Diag., & Sample env MPS/PLC

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 14 Core Control & Data Systems Team 1.6. CAM: G. Haller Main personnel A. Perazzo, Online (PPA) D. Nelson, Control (PPA ) S. Peng, Control Software (Controls Division) R. Rodriquez, Infrastructure (PPA) C. O’Grady, DAQ (PPA) Steffen Luitz, Data Management (SCCS) Richard Mount (Director, Sci. Computing & Computing Services) Niels van Bakel (Detector Physicist, LUSI) 1.6. CAM: G. Haller Main personnel A. Perazzo, Online (PPA) D. Nelson, Control (PPA ) S. Peng, Control Software (Controls Division) R. Rodriquez, Infrastructure (PPA) C. O’Grady, DAQ (PPA) Steffen Luitz, Data Management (SCCS) Richard Mount (Director, Sci. Computing & Computing Services) Niels van Bakel (Detector Physicist, LUSI) CAM: Control Account Manager PPA : Particle Physics and Astro Physics Division CAM: Control Account Manager PPA : Particle Physics and Astro Physics Division

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 15 Control & Data Systems - Cost Estimate

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 16 WBS 1.6 – Control & Data Systems Cost estimate at level 3 by fiscal year –

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 17 Control & Data Systems Schedule in Primavera 3.1

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 18 Control & Data Systems Milestones CD-1Aug 01, 07 Controls & Data PRD Aug 27, 07 Phase 1 Conceptual Design CompleteSep 27, 07 CD-2aDec 03, 07 Controls & Data Final Design Review Apr 25, 08 CD-3aJul 21, 08 Complete Controls & Data Apr 16, 09 Ready for InstallationMay 18, 09 Phase I Installation CompleteAug 07, 09 CD-4aFeb 08, 10 CD-1Aug 01, 07 Controls & Data PRD Aug 27, 07 Phase 1 Conceptual Design CompleteSep 27, 07 CD-2aDec 03, 07 Controls & Data Final Design Review Apr 25, 08 CD-3aJul 21, 08 Complete Controls & Data Apr 16, 09 Ready for InstallationMay 18, 09 Phase I Installation CompleteAug 07, 09 CD-4aFeb 08, 10

Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 19 Summary Control subsystem is based on EPICS Controllers will be common to LCLS systems Motion, vacuum, cameras, power supplies, etc Peak data rate/volume requirements are comparable to HEP experiments, requiring dedicated data acquisition and management systems Data subsystem concept & architecture is being developed Use standard interface to all detectors Use data systems that have high bandwidth and are scalable Is leveraging significant expertise at SLAC in data acquisition and management Ready to proceed with baseline cost and schedule development Control subsystem is based on EPICS Controllers will be common to LCLS systems Motion, vacuum, cameras, power supplies, etc Peak data rate/volume requirements are comparable to HEP experiments, requiring dedicated data acquisition and management systems Data subsystem concept & architecture is being developed Use standard interface to all detectors Use data systems that have high bandwidth and are scalable Is leveraging significant expertise at SLAC in data acquisition and management Ready to proceed with baseline cost and schedule development