DATABASE ARCHITECTURE PROPOSAL Fabien Jeanneau – 19 jan 2015.

Slides:



Advertisements
Similar presentations
Click on this image to open the full PDF document.
Advertisements

1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Status of the ATLAS MM project
Status Update on Mechanical Prototype in Rome November 6,
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
 What is joinery? In our case – we will be looking at the fastening or combining of two or more boards together when building our projects.  It is important.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Team Leader : Mr. Khaleel Ahmed Members : Mr. Radhakrishnan V K Mr. Sugmar V Mr. Sourabh Kr. Mishra PROJECT MEMBERS.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP THERMO-MECHANICAL SIMULATIONS FOR THE MM WEDGES (TDR OPTIONS – SCREWED QUADRUPLETS) of June 2013 Patrick.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
Project Methodology May 2, System Development Life Cycle Overview.
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
MM detector construction One or several modules per sector considerations.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
M. Bianco On behalf of the ATLAS Collaboration
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
WELDING TESTS & OTHERS ISSUES SUMMARY
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas, E.Ferrer-Ribas, Ch.Flouzat, J.Galan, W.Gamache, A.Giganon, P-F.Giraud, P.Graffin,
Aristotle University of Thessaloniki QC – QA readiness at AUTh tooling and procedures D. Sampsonidis, P. Charalampous, S. Kompogiannis, and C. Lampoudis.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Sensor Module v1.1. Step 1: Sand edges of PCB & drill bolt holes (3mm) Use small green power drill or pillar drill (as available) Goggles Use a piece.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
BM&N STS ladders assembly in VLHEP
ATLAS Internal ID Service Integration
S.Movchan Straw manufacturing and QC
Update on Pavia MM mechanical prototype
Remaining items (per module) for panel construction (mostly Fabien)
Mechanics: (Tim).
Ongoing and to do work M.Lenti.
Constructional requirements from ITk-Strips
Tracker Outer Barrel COOLING Antti Onnela, CERN.
HB RM prototypes Ianos Schmidt Aug 17, 2017.
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
MicroMegas Mechanical Meeting --- Cern April 2014
STAR TOF MRPC Mass Production & Q.C. (USTC)
Station and Module Support Frames
Step-by-Step Assembly Instructions – Cube Version
After service guide for changing PCB
Our Process CMSC 345, Version 1/04.
Presentation transcript:

DATABASE ARCHITECTURE PROPOSAL Fabien Jeanneau – 19 jan 2015

Common database centralized at Cern Based on the PBS Elements of the database: – Identifier – Position in the tree – Documentation file – Quick access parameters (visible at the upper level) – Flag if accepted while out of specs – …

Architecture # MODULE # D/PCB # RO/PANEL# D/PANEL # RO/PCB #WASHER #RO/PCB #IC #FRAMES #INSERT #PIN #COOLING #THERMAL/INS #TAPE #GLUE #D/PCB #IC #FRAMES #MESH #GAS/T #TAPE #GLUE #RO/PANEL #D/PANEL #DGAP/FRAME #IC/ENDCAP #PIN #ORING #SCREW

PCB #RO/PCB – Manufacturer and QC files: Relative position of strips wrt rasmasks/targets Rectitude and parallelism of strips Pillar height Thermal cycles Resistivity Other defect (bubbles, …) – Parameters: PCB thickness Cuts, shorts Precision holes (position, circularity, …) – Dependencies: #WASHER (for PCB positioning) #D/PCB – Manufacturer and QC files – Parameters: PCB thickness #WASHER -Manufacturer and QC files -Parameters: -Position / strips

Panels #RO/PANEL – Manufacturer and QC files – Parameters: Planarity Parallelism Thickness Strip alignment side/side – Dependencies: #RO/PCB, #IC, #FRAMES, #INSERTS, #PIN, #COOLING, (…) #D/PANEL (with mesh) – Manufacturer and QC files – Parameters: Planarity, Parallelism, Thickness Drift distance Mesh frame thickness – Dependencies: #D/PCB, #IC, #FRAMES, #MESH, #GAS/T, (…)

Quadruplet #MODULE – Manufacturer and QC files – Parameters: R/O strips alignment Gain homogeneity / plan Cosmic rays test Assembly scheme (panels order) Thickness and parallelism (?) – Dependencies: #DGAP, #ORING, #SCREW, #IC/ENDCAP, …

Components (parameters) #IC – Thickness #IC/ENDCAP #FRAMES – File: position in the panel – Parameters: Thickness, Twist #MESH – Tension (on transfer frame) #COOLING/TUBES (like #FRAMES) #TAPE – Lot number #GLUE – lot number – Expiration date #GAS/T – Lot number #WASHER #INSERT (and #PIN) – Position, perpendicularity, diameter, … #THERMAL/INS – Lot number #ZEBRA/POS #COOLING/PLATE #DGAP – Lot number – Thickness – Corners ID #ORING #SCREW

Files Assembly check list and notes Version of drawings List of operations (procedures and controls) Problems, defects and decision process Quick access parameters Specifications Delivery receipt (if available) Logistics information (time dependent)

Include in DB the integration phase: – Elx – Alignment platforms – Mounting on wheel – … Module localization and on-going activities Definition of ID: – Size of the piece – Bar code? – Batch of pieces (screws, glue, oring, …