TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.

Slides:



Advertisements
Similar presentations
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
Advertisements

Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
 Installation: equipment, waveguides, water cooling, local cabling  Upgrade of LEP equipment  Contract follow up: new klystrons, spare circulators.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
University of Oslo and CLIC Short overview for first “NorduCLIC” meeting Erik Adli and Steinar Stapnes, University of Oslo May 19, 2008.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
TBTS Test Program & Schedule G. Riddone
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Oleksiy Kononenko CERN and JINR
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
I. Syratchev, HGW 2012, KEK, Japan The high power demonstration of the PETS ON/OFF operation with beam. I. Syratchev for CLIC team.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Status of CIEMAT work on PETS
CALIFES A proposed electron beam test facility at CERN
Work packages : Overview of experimental verification, CTF3 and CLIC Zero R. Corsini for the CLIC/CTF3 Collaboration Basically all WP scientific and.
CLIC work program and milestones
Steering algorithm experience at CTF3
CLEX* Status and Plans CTF3 complex CLEX
Status of the CLIC main beam injectors
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
CTF3 Collaboration Technical Meeting January 2008
Testing Infrastructure, Program and Milestones
LCWS 2017 – 26th October C. Rossi
High Efficiency X-band Klystron Design Study
Recent high-gradient testing results from the CLIC XBoxes
Measurements, ideas, curiosities
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program and first results  Plan for completion  TBL as a power source for structures

TBL status  Beam line including PETS prototype installed all Quads on movers, BPM’s with new read out electronics, diagnostic section with emittance meter and time resolved spectrometer  First commissioning and measurements performed PETS qualified and found consistent up to 50 MW beam matching and transport performed end of line spectrometer tested BPM resolution measured Magnet movers tested  First commissioning and measurements performed PETS qualified and found consistent up to 50 MW beam matching and transport performed end of line spectrometer tested BPM resolution measured Magnet movers tested

TBL in CLEX

Experimental program TBL: a high-power test facility power production, energy balance, power stability, rf pulse shaping rf pulse shaping TBL: demonstration of stable beam transport for heavily decelerated beam – CLIC feasibility no losses, alignment studies, emittance growth TBL: first prototype for the CLIC decelerator - test- bench and benchmarking detailed energy spectrum and beam parameters detailed energy spectrum and beam parameters engineering test bed engineering test bed

TBL commissioning Panel to measure beam parameters and perform the matching

KlystronDrive beam RF power out RF power in Drive beam RF power out ASTA (SLAC) CTF3 (CERN + Collaborations) Two beam test stand (CERN + Collaborations) Objective: to understand the limiting factors for the PETS ultimate performce Objective: to demonstrate design rf parameters at the output of the PETS Test beam line (CERN + Collaborations) Objective: to demonstrate the beam transportation without looses and ~ 50% deceleration. PETS testing I. Syratchev What matters is the output section !

Test Beam Line commissioning results Steffen Döbert, BE-RF TBL installation in CTF3 and example of 12 GHz power production Successful commissioning of the TBL beam line, > 50 MW of 12 GHz power generated with a 17 A drive beam in agreement with theoretical predictions Turned out to be a nice diagnostics to optimize the drive beam

Energy and Energy spread Time resolved energy spread with 50 MW in one PETS Simulation for 16 PETS

PETS, power production stability Current stability ~ 1.3%; P ~ I 2 Measured current stability in the CTF3 linac 9x10 -4

PETS, power production position correlation Correlation of beam position and output power

Status of series production  In the process to produce next 8 tanks 3 by CIEMAT, 5 by CERN  Pacing item is the PETS itself  At CERN we prepared for clean room assembly  Aim to have 4 tanks installed in February, 8 tanks in summer 2011, 12 in 2012  Recently decided to order 4 more tanks now  India and BINP both made PETS prototypes as well (option for second series)

Status of series production First conform PETS bar for series production, We will have made 96 of this high precisions objects at the end of this year

Status of series production PETS bar with damping ceramic Finished tank out of the clean room

TBL decelerator production TBL PETS assembly in the SM18 clean room (first out of 5 tanks)

Plans for completion and feasibility demonstration  Demonstration with 8 in summer 2011, >30% deceleration  TBL with 12 PETS in 2012  Perform full experimental program afterwards  Develop modified tanks optimized for structure conditioning

Plans for TBL beyond 2012  Upgrade TBL to a test facility relevant for CLIC TDR work  12 GHz power production for structure conditioning  Working experience with a real decelerator  Beam dynamics studies, pulse shaping, feedbacks, etc CTF3 dilemma: Can produce high current > 14 A with 140 ns pulse length Need > 20 A to power one structure with a TBL PETS Or combination factor 4 only, < 14 A but 280 ns Need to chain two TBL-PETS to power a structure Many constraints due to building, space and radiation (rep. rate limit 10Hz ?)

Plans for TBL beyond 2012 How could it look like

Plans for TBL beyond 2012 What can be done with TBL+  Develop conditioning scenario for CLIC conditioning with beam / use of ON/OFF mechanism of PETS precondition with klystron and then with beam conditioning of PETS  Test bed for PETS development, ON/OFF, new designs, etc  Power production as a function of beam parameters alignment, stability, pulse shape, phase stability, beam loses, failure modes  Continue decelerator beam dynamics studies

Conclusion  TBL commissioning ongoing, feasibility demonstration can be started in 2011 with 8 PETS and finished with in 2012  TBL+ upgrade useful as a facility dedicated to conditioning experiments, essential for CLIC TDR phase Plan to create a limited number (4 ?) of testing slots  Working horse conditioning facility based on klystrons is needed in addition to support the structure development

TBL vs CLIC PETS are designed to produce nominal CLIC power of 135 MW for nominal 28 A CTF3 current

Plans for TBL beyond 2012 TBL versus klystrons, additional value of TBL Klystron TBL+ Rep rate (Hz) slots2211 Number of units22168 hours/day24 12 days/year Rf-pulses/year5E+091E+104E+093E+08 TBL: Test of PETS and structure possible Closer to CLIC situation Less flexible for frequent changes in the set up 28 A needed for 135 MW/PETS 20 A for 70 MW/PETS 15 A for 70 MW/ for two PETS

 50 MW produced in agreement with theoretical prediction  nice diagnostics to optimize the drive beam PETS, power production