ASTA Latest Update E. Harms April 2014. Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Savings and Investment Unit Project Student Name.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
ASTA G UN C OMMISIONING R ESULT AND P OTENTIAL APPLICATION FOR I NVERSE COMPTON SCATTERING G AMMA - RAY SOURCE Jinhao Ruan.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
Deadline for Requisitions Payment Processing Date
Degradation and Recovery of Cavity Performance
Gantt Chart October November December Step One Step Two
Deadline for Requisitions Payment Processing Date
Cesium Telluride Photocathode Preparation at Argonne
DC Injector and Space Charge Simulation Status
FY16 Budget Build (Banner)
SRF Gun at ELBE Work package 10, Task 7 Jochen Teichert
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Upgraded Injector Test Facility
Year 2 Autumn Term Week 12 Lesson 1
KEK injector cryomodule

Performance Degradation cERL Injector Cryomodule
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
FRIB summary of performance degradation - VTA to cryomodule
2300 (11PM) September 21 Blue line is meridian..
Advanced Research Electron Accelerator Laboratory
SEASONS Khalatyan Nane Artschool The 4th grade.
McDonald’s calendar 2007.
Strategic Planning Timeline Overview

Year 2 Autumn Term Week 12 Lesson 1
Proud As A Peacock! We are very proud of__________________
Teacher name August phone: Enter text here.
Circle Chart Template Process Name.
2010 Nov 2011 January February March April May June July
Who Wants to be a Millionaire?
MONTHS OF THE YEAR January February April March June May July August
McDonald’s calendar 2007.
Injector/Linac Design Status C. E
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
UNITS OF TIME QUESTIONS.
Presentation transcript:

ASTA Latest Update E. Harms April 2014

Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation Cs 2 Te cathode installed – February 2014 First electrons with Cs2Te cathode produced on 18 March E. HarmsAPT Seminar 14 January 2014 Electrons Faraday Cup YaG Screen

3 CM2 installed at ASTA ILC Milestone E. HarmsAPT Seminar 14 January 2014 Cryomodules – CM2

Cryomodule installed in NML/ASTA – April 2013, Warm coupler conditioning (one cavity at a time) – 9 May to 18 June 2013 Cooldown – 23 October to 11 November 2013 Begin cold operation, Cavity 1 only – 13 November 2013 Cavity 1 complete (13 November - 30 January, days) Cavity 2 complete ( 31 January - 15 February, 16 days) Cavity 3 complete ( 24 February – 4 March, 9 days) Cavity 4 complete ( 4 – 10 March, 6 days) Cavity 5 complete ( March, 9 days) Cavity 6 complete ( 28 March - 3 April, 7 days ) Cavity 7 in progress since 4 April, to be complete week of 13 April Cavity 8 4 E. HarmsAPT Seminar 14 January 2014 Timeline

5 E. HarmsAPT Seminar 14 January 2014 Current emphasis on installing 50 MeV line (gun to Cryomodule) Components installed on girders as much as practical Girder alignment, interfaces, vacuum work in situ 50 MeV Beam-line

6 E. HarmsAPT Seminar 14 January 2014 Girder #1 and low energy beam dump installed & aligned Girder #2 to be installed week of 13 April Girder #3 assembly in progress –installation in ~1 month 50 MeV Beam-line

7 Complete RF Gun conditioning – 45 MV/m Install ‘coated’ cathode – generate a real beam Bring CM2 into operation – in progress Complete upgrade and install CC1 – in progress Complete installation & begin commissioning 50 MeV Injector to low energy dump (Stage I.0) – in progress –initially ~20 MeV operation Begin installation of high energy beam line to dump (Stage I.2) including tunnel extension E. HarmsAPT Seminar 14 January 2014 Planned Activities for FY14