S A Griffiths CM42 June 2015 Electrical & Control.

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Electrical & Control Power Supplies Trevor Hartnett.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
FC Status MPB 1/20 April 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
MICE Spectrometer Solenoids Step IV running
Electrical Configuration and System Protection
MICE Absorber and Focus Coil Magnet – Test Results
Teleconf ACS – FREIA 28th March 2017
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
Considerations from machine protection and the ELQA teams
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
MICE RF System Power Supplies, Control and Monitoring Status report
1.3-GHz Cavity Vacuum Furnace at IB4
Electrical & Control.
Project Manager’s Report + DC/MoM Report
SPS cryogenic proximity equipment and SM18 validation
ATF2 Magnet Power Supplies
Teleconference ACS – FREIA 17th October 2017
Focus Coil Quench Detector
Cryostat design Mechanical design: Thermal screens: Specifications:
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
J. Fleiter, S. C. Hopkins, A. Ballarino
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

S A Griffiths CM42 June 2015 Electrical & Control

S A Griffiths CM42 June 2015 Rack Room 2 – UPS Inverter and Batteries 2 UPS for Critical Load Two 30kVA UPS (inverter) have been installed and support Control, Power Supplies, Vacuum and Instrumentation in RR2. Batteries The 2 x 30kVA UPS operate in parallel and share a common battery pack.

S A Griffiths CM42 June 2015 Rack Room 2 – UPS Configuration 3 US Voltages – 208/110V UK Voltages – 400/230V

S A Griffiths CM42 June 2015 RR2 Layout – Rack allocation 4 SS Power Supply racks FC & SS Control & Instrumentation racks FC QD System rack Auxiliary rack (Tracker & Diffuser) SS ground fault protection rack SS QD System rack FC Power Supply rack Oxygen Depletion System rack

S A Griffiths CM42 June 2015 FC & SS Instrumentation & Control Racks 5 All known Instrumentation cables have been installed and terminated Commissioning of instrumentation is well advanced. All magnet temperature sensors checked, some sensor issues have been identified on the SS magnets. Temperature curves programmed for FC. Temperature curves for SS still to be finalised – re-location of cold heads has caused delays (hopefully done this week). Helium level sensors measured and checked for SS and FC. Anti-icing heater commissioned for FC. Fans for anti-icing on SS need to be fitted on magnet and terminated. Pressure heaters commissioned for FC. Pre-cool heaters for SS need to be commissioned? Main pressure vessel regulation heaters needs commissioning. Racks installed in RR2

S A Griffiths CM42 June 2015 QD System & Ground Fault Protection Racks 6 Ground fault protection (GFP) rack is being assembled and will be installed this week. FermiLab are providing the Ground fault protection crates – delivery to be confirmed. GFP will only be used on the SS magnets as it is not compatible with the FC configuration. Interlock cables for GFP will be installed this week. SS QD system rack has been installed in RR2. FC QD system rack will be installed this week. Interlock cables between SS QD system and controls rack will be installed this week. SS QD system voltage tap cables need to be installed between magnet and RR2, only one set of cables currently available. FC QD system voltage tap cable is installed but needs terminating. A full systems check is required on both QD systems before powering magnets. FC - QD system rack Space allocated for second FC QD System

S A Griffiths CM42 June 2015 FC & SS Power Converter Racks 7 All DC magnet cables installed and terminated in racks / DC link boxes (FC connection details to be confirmed). All controls cables are installed and terminated. Water cooling pipes have been installed for absorbers. A fault with the Chiller / air blast unit on roof will open solenoid valves to switch feed to towns water. (valves need to be fitted) An interlock cable from the roof chiller to control system needs to be installed and terminated. Racks installed in RR2 SS power supplies have been commissioned with control system into short circuits in link boxes. SS racks checked for thermal stability with full heat run over 24 hours. It is planned to commission the FC power supply this week. There is a faulty diode(s) in an SS absorber tray – currently sourcing replacement diodes.

S A Griffiths CM42 June 2015 DC and Instrumentation cables 8 All DC magnet cables and instrumentation cables have been installed. Cable management and strain relief has been carefully implemented. Additional strain relief required for cold head terminations.

S A Griffiths CM42 June 2015 DC magnet and Control Cables for SS & FC 5 DC link boxes have been installed in MICE Hall. 240mm 2 and 70mm 2 cables have been installed from RR2 to link boxes. 95mm 2 and 70mm 2 cables have been installed between DC link boxes and magnet local termination point. DC link boxes will enable the FC and SS to be changed from Solenoid to Flip mode and vice versa. All control interfaces for FC have been relocated to the top of the North side for convenient access. Cables have been installed and terminated for the FC Load cells and will be commissioned this week. 70mm 2 earth cables have been installed between each magnet and the main earth busbar located on South wall. Only the FC has a local earth connection – an earth is terminated in the dump resistors. 9 FC – DC magnet and instrumentation cables

S A Griffiths CM42 June 2015 Auxiliary (Diffuser and Tracker) Control Rack 10 The tracker control rack has been installed in RR2 to allow ease of access and a short link to the main control rack. (Canbus) 2 Control crates have been manufactured for housing in RR2 rack and containing the Canbus modules. 1 crate is finished, tested and in position in RR2. The other needs a few small modifications, but can only be completed once tracker rack in Hall is switch off. There are some cable terminations still required in Hall. Rack modification required to control AC power to the WIENER cryostat – fit contactors. Commission full system and verify tracker can be controlled from RR2.

S A Griffiths CM42 June 2015 Compressor and Vacuum Rack 11 Extra shut off valves have been requested for the SS turbo pumps and will need to be controlled. Control philosophy for backing line scroll pumps to by updated. Hard wired vacuum status taken to RR2, installed, but needs final terminations and commissioning. RS232 controls interface currently being commissioned. Vacuum / compressor rack has been installed and commissioned in North / West corner

S A Griffiths CM42 June 2015 Oxygen Depletion System Additional O 2 sensors are to be installed at agreed locations. A second controller is being installed to interface with additional sensors. All equipment has been purchased and delivered. System upgrade has been delayed due to low priority. Cable management in MICE hall is being installed, cables installation will hopefully be completed before August ODS rack under construction, will be available for installation in 2 weeks. System will then need commissioning and sign off. 12 Position of new and existing O 2 sensors

S A Griffiths CM42 June 2015 Questions? 13