Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.

Slides:



Advertisements
Similar presentations
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Advertisements

Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
MAXIM Power Subsystem Diane Yun Vickie Moran NASA/GSFC Code (IMDC) 8/19/99.
1 Electrical Power System By Aziatun Burhan. 2 Overview Design goal requirements throughout mission operation: Energy source generates enough electrical.
Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)
Level 1 - LRO Requirements ESMD-RLEP-0010
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
1 wp4 – Technical Issues for payload integration within the Nacelle for High Altitude flight Budapest 24/11/04 Marco Bobbio Pallavicini Carlo Gavazzi Space.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Electrical Power Subsystem—Intro Lesson 19 Spring 2005.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Morehead State University Morehead, KY Prof. Bob Twiggs Power Systems Design
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
EPS/Fault Management Software Jimmy Nguyen Electrical Power Subsystem Member 1.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
1 Electrical Systems RLEP Avionics Systems Eng. Philip Luers (301) LRO C&DH Lead Quang H. Nguyen
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Matt Uhlman Ian Chen 1.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
LAT-MD August 2006 LAT Requirement Sell-off Package GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
Amy Blas Hawaii Space Flight Laboratory University of Hawaii.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
Mark Beckman NASA/GSFC Code 595 August 16-17, 2005
Planetary Lander PDR Team Name
Electrical Circuits.
Spacecraft Power Systems
CINEMA System Engineering
Technical Resource Allocations
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Mini-RF Requirements Overview
A.M.Villavan Sai Lalith Rohit K.Anudeep
Low Voltage Power Supply & Power Controller Board
University of California, Berkeley
Peer Review Agenda (Suggested).
Spacecraft Thermal System
Lunar Reconnaissance Orbiter (LRO) Mission
LRO Mission Operations Concept
Orbital Transfer Vehicle (OTV) Power Systems
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Launch and On-orbit Checkout
CRaTER Science Requirements
EagleSat 2 – Electrical Power Subsystem Development
Photovoltaic Systems Engineering Session 10
CRaTER Performance Verification
Instrument PDR Summary of Objectives
SDO Electrical Power Subsystem (EPS) Mission PDR
NASA Satellite Laser Ranging Moblas 4 Monument Peak, CA LRO and HPWREN Scott Wetzel NASA Satellite Laser Ranging Program Near Earth Networks Programs.
LRO CRaTER Preliminary Temperature Predictions Design A Concept  Old Concept April 12, 2005 Cynthia Simmons/ESS.
CONTOUR NGIMS Electronics Test History
HMI Top Level Requirements
Integration and Test Organization Chart
Presentation transcript:

Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005

Lunar Reconnaissance Orbiter (LRO) EPS Level System Requirements Traceability Level 1- LRO Requirements ESMD-RLEP-0010 Level 2- LRO Mission Requirements Document 431-RQMT-000004 LRO Technical Resource Allocations 431-RQMT-000112 LRO Electrical Systems Specification 431-SPEC-000008 LRO Mechanical Systems Specification 431-SPEC-000012 LRO Thermal Systems Specification 431-SPEC-000091 Level 3- LRO Electrical Power Subsystem Spec. 431-SPEC-000013 Level 4- LRO Power Subsystem Electronics (PSE) Spec. 431-SPEC-000016 LRO Solar Array Spec. 431-SPEC-000037 LRO Battery Specification 431-SPEC-000032

Lunar Reconnaissance Orbiter (LRO) EPS System Level 2 Flow Down Key Requirements Level 2 Req. Level 3: Requirements Concept/Compliance Paragraph Requirement MRD-12 3.3.1.1 The SA shall support a primary circular polar mapping orbit with a nominal mean altitude of 50 +/- 20 km. Altitude is measured to mean lunar surface. SA analysis done for this orbit/Complies MRD-13 3.3.1.2 The polar orbit shall be 90 degrees +/- 1 degrees longitude. SA tracks to meet this requirement/Complies MRD-19 MRD-099 MRD-102 3.3.3.1.5 The nominal DOD during a typical lunar orbit shall be limited to 30% with 1 cell failure. In addition the battery shall be capable of supporting a DOD of 60% for launch phase and 80% for lunar eclipse periods and other mission modes for a total of not to exceed 10 cycles. Analysis done for worst case eclipse/Complies MRD-029 3.2.2.1 The EPS mass shall not exceed the allocation as specified LRO Technical Resource Allocations Specification (431-SPEC-000112). Complies

Lunar Reconnaissance Orbiter (LRO) EPS System Level 2 Flow Down Key Requirements Level 2 Req. Level 3: Requirements Concept/Compliance Paragraph Requirement MRD-098 3.2.3 The LRO power system shall be a Direct Energy Transfer (DET) design distributing main bus power only to all instruments and subsystems. Complies MRD-50 3.1.22.1 The EPS shall support all observatory operational modes and mission phases as defined in the Lunar Reconnaissance Orbiter Mission Assurance Requirements (431-RQMT-000004) and summarized here: Pre-launch/Launch Readiness Launch and Lunar Transfer Orbiter Activation/Commissioning Measurement Operations Extended Mission operations End-of-Mission/Disposal

Lunar Reconnaissance Orbiter (LRO) EPS System Level 2 Flow Down Key Requirements Level 2 Req. Level 3: Requirements Concept/Compliance Paragraph Requirement MRD-32 1.1 The bus voltage is maintained between 21-35 VDC nominal measured at the loads during all mission phases through use of the LRO Power Subsystem Electronics (PSE). Complies MRD-103 3.1.2.2.2 The LRO EPS shall support the total power allocation of the LRO spacecraft bus and instrument suite with margins as specified in LRO Technical Resource Allocations 431-RQMT-000112. Max. capability is 823W orbit average MRD-21 3.1.1.1 The Orbiter shall be designed for a one-year mission life (after reaching lunar orbit and post commissioning activities which are expected to be 2 mos.). The primary mission shall be followed by an extended mission with a total mission life of up to 60 months as resources allow. The extended mission is not to drive design requirements or resources. EPS shall support a reduced load extended mission/Complies

Lunar Reconnaissance Orbiter (LRO) EPS System Level 2 Flow Down Key Requirements Level 2 Req. Level 3: Requirements Concept/Compliance Paragraph Requirement MRD-31 3.1.2.2.6 The EPS power consumption shall not exceed the allocation as specified LRO Technical Resource Allocations Specification (431-SPEC-000112). Complies MRD-20 MRD-106 MRD-107 3.3.2.1.11 Hardware over current protection of the main power bus is done for a maximum of 48 switched services. This is accomplished with the use of Solid State Power Controllers (SSPC) with re-settable circuit breaker capability. MRD-105 3.1.2.2.3 The LRO EPS shall provide an unregulated 22-35Volts (V) bus as measured at the PSE to support a peak load of 1500W for a period of 5 minutes. MRD-104 3.1.2.2.9 To insure compliance with voltage specifications the spacecraft will present a minimum load to the power bus of 180W whenever the system is powered up. System complies

Lunar Reconnaissance Orbiter (LRO) EPS Block Diagram

Lunar Reconnaissance Orbiter (LRO) EPS Verification Summary Analysis System energy balance, Solar array sizing Control loop simulation Failure Modes and Effects (FMEA), Reliability, Worst-case Component Tests PSE ETU Functional Limited environmental PSE Flight Full environmental Battery Life cycle Qual and acceptance testing Solar Array Spacecraft Level Full functional Orbiter-level Environmental Mission cycle

Summary The power group has been working closely with systems to understand and define the EPS requirements. Requirements have been defined sufficiently enough to allow the EPS ETU development to proceed with confidence. Power handling and switching margins have been incorporated to insure accommodation of any increases, the system is robust Presently proceeding with ETU board layouts and fabrication The EPS is ready to continue with detailed design