1. 1. What is a low pressure sewer system? These Systems convey wastewater from your home or business to the regional wastewater treatment facility. Unlike.

Slides:



Advertisements
Similar presentations
Wastewater Collection (Sewer Alternatives). Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs.
Advertisements

Land Use Program Septic System Overview Scott Weldon
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Follow the ABCGA April is Safe Digging Month. Follow the ABCGA.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Grinder pumps are selected, instead of gravity sewers, when you need more freedom to run sewer up hills, through isolated flat lands, or in areas with.
City of Los Angeles Venice Dual Force Main Project
BROWARD COUNTY GO SOLARFEST ACCESSING AFFORDABLE SOLAR FINANCING THROUGH PACE.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
The City of North Bend Sanitary Sewer System
Diesel Generator Reliability: Lessons Learned from Storms
SPECIAL ORDER BY CONSENT EMC SOC WQ S SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.
Fairview Township, York County May 28, 2015
Lease Automatic Custody Transfer
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Lift Station Safety and Maintenance Tony Conn, Supervisor Wastewater Collection and Pumping
Project History Town of Newport Population: 550 Vermillion County Seat.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
York Sewer District Internships and Succession Planning.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
1 Public Hearing User Rate Adjustments April 8, 2008.
Solving Significant Surge and Water Hammer in a Large Wastewater Lift Station at Fort Bragg, North Carolina November 16, 2015 Randall L. Foulke, PE, BCEE,
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main Rachel Rausch, EIT.
Fats, Oils & Grease (FOG) Control (aka: What is the City doing to us now?) Restaurant Managers’ Forum.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
25 – Wastewater Conveyance System Design April, 23, 2013 Professor Doran CEE 410.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Components of Construction part 2
Heritage Park Area Construction Update July 28, 2015
Lecture (11): Water Distribution Systems
Feasibility of Bass Lake Wastewater Treatment
Board of Commissioners Meeting
Effluent from a septic tank effluent gravity (STEG) or septic tank effluent pump (STEP) system is discharged into a collection system. A typical STEP/STEG.
Mangawhai Wastewater Strategy and Options 7 August 2017.
Manchester’s CSO Program: A Look Behind and a Look Ahead
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
FPL SolarNow™ Program Community Based Solar Offering Palm Coast City Council Workshop August 28, 2017.
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
What is an on-lot sewage system?
South Carolina Town of Kiawah Island June 7, 2016.
Rehabilitation Program impact on Sewer Management
Water Heater Repair – What to Do When You Get No Hot Water?
Electrical Gas Plumbing Heating & Cooling
Tips For Solving Plumbing Issues
PLUMBING PLANS CHAPTER 31
Town of Dunn Sanitary District No. 3
Presented by thomas j. Haglund, general manager
Parkland/Brookdale Interceptor Replacement
Colchester Interceptor System Improvements Project
Sewer Infrastructure Watuppa Plantations Development
BROWARD COUNTY GO SOLARFEST
What to Expect When You’re Inspected
[OUR CITY NAME]’S OLD SEWERS
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
1 Q: Who are we? 4/15/2019.
Fixing Our City’s Old Sewers
Biltmore C Proposed Water & Sewer Improvement Project
Get to Know Shoal Creek.
Presentation transcript:

1

1. What is a low pressure sewer system? These Systems convey wastewater from your home or business to the regional wastewater treatment facility. Unlike a gravity connection, Low Pressure Sewers use a small pump station located at each house to move wastewater through the transmission system. Low pressure sewers are installed where gravity sewers are not cost effective or feasible, and have been effectively used by NMB for 25 years! 2. How does it work? Wastewater from your home or business flows by gravity into the collection tank aka grinder pump basin. Floats in the Collection Tank send signal to Control Panel to turn on Grinder Pump. Grinder pump macerates the effluent into a slurry and pumps the wastewater through the low pressure force main (pipe) in the public right-of-way. 2

3

4

5

 Why a Low Pressure Sewer (LPS)system for North Miami Beach?  Developed urban area, properties within district were scattered ( geometry)  Applied a concept used up North for lakeside communities.  1989 established the West Dixie Highway Industrial District 4 main property owners participating: Friendly Ford, Peoples Gas, Santi Brothers, Landmark Chevrolet,. They were large tracts of land or multiple parcels/blocks Project cost was estimated at $260,000 Ground breaking ceremony January 1989  The City designed and constructed the Low Pressure Sewer system 6

System was extended with a second phase in 1991 and a third phase 1996 Today the system is 4 miles long and has 65 grinder pumps connected to it. Each property supplies the power. In 1989 Executed purchase agreement with Environment One Corp (E-One) A 1 hp simplex was $1234.A 1 hp duplex was $2,625 A few Myers submersible grinder pumps were also installed in 1996 In 1998 we migrated to ABS pumps Piranha Grinders- Grinders in general shred to a fine slurry able to pass through a 2” piping. the basins are 48 inches wide, 6 feet tall ( typical) made of fiberglass Able to extend with 12”, 24” or 36” vertical extensions Control panels In 2011 ABS became Hydra Service Pumps 2 hp duplex are the majority of new installs costing around $10,000 each ( off the shelf) 7

1.Lessons learned? It is best to try and standardize the pump type. These are systems and involve more than just a physical pump. 2. Most common problem encountered? The stations for the most part are problem free for the first five years, after that is just proper maintenance of the stations. Starter kits are the most frequently replaced, followed with bad pumps. The main problem with the grinder is no power to the station. This can be due to: ELECTRICAL No power from the building Customer did not pay his FPL bill Breaker tripped or turned off Starter kit needs replacement Blown fuse in the panel MECHANICAL Loss of prime Clogged check valves Pump replacement 3.Life expectancy of GP? year 8

4. Benefits of butt fused pipe. Problems with it? I & I problems are eliminated with this system. Installation at 3 feet of cover, no sloping, flexible, avoid utility conflicts, trees etc. Faster and long run to install. Do not have any breaks other than accidental hit by contractor. It is very challenging to repair without a butt fused machine (hard to repair in case of accidental hit (especially the small diameter pipe). 5. How many calls per week or per month on our LPS system. On average maybe one call every month 6. cost to maintain ? Monthly we try to service the stations one a month with the inspection and cleaning the wetwell with the Vac-truck. 7.How many stations per last count? There are 65. 9

10

11

12

13

14

15

16

17

18

19

 Used for 25 years in South Florida – it works in NMB!  Can be cost effective in the right application  Need to establish a maintenance program  Now being used in the keys and Miami Shores Downtown District 20