HCB 3-Chap 14B: Heat Pumps and Part Load 1 Chapter 14B: HEAT PUMPS AND PART LOAD ANALYSIS Agami Reddy (July 2016) Air-source heat pump systems Operating.

Slides:



Advertisements
Similar presentations
Chapter 11 Refrigeration Cycles Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 5th edition by Yunus A. Çengel.
Advertisements

Heating, Ventilating, and Air-Conditioning
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Components of HVAC System
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
Heating and Air Conditioning I
Geothermal Heat Pumps in residential and commercial HVAC systems Dan Winters 4/18/11.
Refrigeration Cycles Chapter 11.
Cooling Systems HVAC 11a CNST 305 Environmental Systems 1 Dr. Berryman 12aCooling Systems; Refrigerants; Condenser/Evaporator Compressive; Absorption;
AIR CONDITIONING (COOLING) UNIT 40 TYPICAL OPERATING CONDITIONS
Dual Fuel + Hybrid System Selling.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Refrigeration Cycles Chapter 11: ERT 206/4 THERMODYNAMICS
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
General Troubleshooting Tips.
Important variables Water: Air: Conversion:
Air conditioning – Refreshes your life EWTP MBY Applied Systems Sales1 EWTP-MBYNN Air-cooled Heat Recovery.
Update on the SEEM Simulation Program Larry Palmiter and Ben Larson August 4, 2008 Ecotope Inc. Presented at Regional Technical Forum Portland, Oregon,
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Chapter 11 Refrigeration Cycles Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 8th edition by Yunus A. Çengel.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Geothermal. Defining “Geothermal” Energy Dictionary definition – Relating to the internal heat of the earth The Earth acts as a giant solar collector,
Water is the Natural Choice Water: The Natural Choice For Efficiency – Unit efficiency versus Building System efficiency – Equipment Ratings EER and COP.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Final Project Format and Deliverables Examples
Final Project I need your proposal about the final project! It should include –Title –Group members –Objective –Short description –Methodology –Expected.
Technical Seminar on Application and Technical Specification June 2016
HCB 3-Chap 19B: All-Air_Multizone_Reddy1 Chapter 19B: ALL-AIR SYSTEMS FOR MULTIPLE SPACES Agami Reddy (July 2016) 1)CAV terminal reheat 2)CAV multizone.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
Chapter 11 Refrigeration Cycles Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 7th edition by Yunus A. Çengel.
Air source heat pump Understand the fundamental principles and
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Maria’s Restaurant Chapter 2 Section 7
Lecture Objectives: Discuss Final Project
Chapter 14A: VC AND AC REFRIGERATION CYCLES AND SYSTEMS
HYDRONIC HVAC: The Most Comfortable and Efficient System
HVAC EQUIPMENT: COOLING SOURCES (see Chapter 16)
HYDRONIC HVAC: The Most Comfortable and Efficient System
CONFIDENTIAL Technical Seminar on Application and Technical Specification 21 June 2016 Rezza Arif Bin Mustapa Kamal Senior Engineer Project And Application.
Chapter 11 Refrigeration Cycles Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 5th edition by Yunus A. Çengel.
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Chapter 14B: HEAT PUMPS AND PART LOAD ANALYSIS
Energy Environment ENVE 411 Energy conversions.
Lecture Objectives: Answer questions related to HW 4
Chapter 11: DESCRIPTION OF HVAC SYSTEMS
HCB 3-Chap 19A: All-Air Systems_Single Zone
Chapter 19B: ALL-AIR SYSTEMS FOR MULTIPLE SPACES
Objectives Discuss Project 1 (eQUEST) Learn about HVAC Systems
October 31st In class test!
Chapter 11 Refrigeration Cycles Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 5th edition by Yunus A. Çengel.
Lecture Objectives: Discuss HW4 parts
FBE03: Building Construction & Science
Energy Environment ENVE 411 Energy conversions.
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
Refrigeration & Air conditioning
NRL NRL - Welcome to the NRK Sales Training Program
Maria’s Restaurant Chapter 2 Section 7
Chapter 11: DESCRIPTION OF HVAC SYSTEMS
NRL NRL - Welcome to the NRL Sales Training Program
Presentation transcript:

HCB 3-Chap 14B: Heat Pumps and Part Load 1 Chapter 14B: HEAT PUMPS AND PART LOAD ANALYSIS Agami Reddy (July 2016) Air-source heat pump systems Operating characteristics of heat pumps: interaction with building heating loads Concepts of supplemental heating, balance point of the heat pump, and excess capacity Factors reducing the efficiency of air source heat pumps Other types of heat pumps: water-source, ground/geothermal AHRI rating standards (steady-state performance) EER and SEER, IPLV rating Part-load performance Part load performance for Unitary equipment: Degradation factor Part load analysis using bin methods- Heat pump example Medium to large chillers: simple polynomial and DOE models

HCB 3-Chap 14B: Heat Pumps and Part Load 2 Air-Source Heat Pumps Typically rooftop units (packaged complete or split) Range of unitary HPs: 1.5 – 20 Tons Best suited for mild weathers (South East United States) and where electric price is low compared to gas HP sized to satisfy peak cooling loads Supplemental heating needs backup heating source System can be used either as an A/C or a HP simply by reversing refrigerant flow Fig

HCB 3-Chap 14B: Heat Pumps and Part Load 3 Air-Source Heat Pumps System can be used either as an A/C or a HP simply by reversing refrigerant flow This is done by a Reversing valve Fig

HCB 3-Chap 14B: Heat Pumps and Part Load 4 Fig COP of ideal Carnot, Carnot (with heat exchanger penalty), and real heat pumps Fig Heating performance curves as a function of ambient temperature for four different nominal heat pump units

HCB 3-Chap 14B: Heat Pumps and Part Load 5 Sample manufacturer performance data for a unitary residential split heat pump unit. The tests have been conducted with indoor conditions: 80 o F dry-bulb and 67 o F wet-bulb for cooling, and 70 o F dry-bulb for heating. Table 14.6

HCB 3-Chap 14B: Heat Pumps and Part Load 6 Given: K tot = 1110 Btu/(h · °F), T b,summer = 70°F and T b,winter = 60°F, T o,design summer = 105°F, T o,design winter = 20°F Figure: See Figure

HCB 3-Chap 14B: Heat Pumps and Part Load 7 39,000 Fig

HCB 3-Chap 14B: Heat Pumps and Part Load 8

9 Frosting: ice build up outside coils: at low T db (20 o F to 40 o F) and high RH (>60%) -Reduces evaporator airflow -Decreases heat transfer -Decreases capacity and COP Factors Reducing Efficiency of Air Source Heat Pumps

HCB 3-Chap 14B: Heat Pumps and Part Load 10 Defrosting: - Required to remove frost buildup -Two initiation schemes used: * time/temperature * demand (pressure drop across outdoor coil or temp. diff T out – T ref -Unit operates as A/C for 6-10 min, resistance heat serves as backup to heat air to building - Typically h cycles - Large energy penalty (8-15%) Cycling Losses: -Occurs because unit has too much capacity under part load -Some heat pumps require 15 min to reach steady state - COP (cycling) < COP (steady-state) Undercharge Large fraction of units suffer from refrigerant undercharge which reduces performance

HCB 3-Chap 14B: Heat Pumps and Part Load 11 Improving Heat Pump Efficiency Multi-Speed / Variable Speed - Reduces backup resistance - Reduces cycling Gas Furnace for Supplemental Heat -Reduces cost (electricity expensive) Better Defrost Cycle - Improves efficiency Different Heat Sources -Water -Ground

HCB 3-Chap 14B: Heat Pumps and Part Load 12 Fig Water- source heat pump -Use water instead of air to transfer energy between building and outdoors -Hot weather- cooling tower removes heat from water loop -Cold weather- boiler heats water -Loop allows for simultaneous heating and cooling by individual units (resulting in higher system efficiency and comfort)

HCB 3-Chap 14B: Heat Pumps and Part Load 13 Central Closed-Loop Water Source Heat Pump Heat Pump terminal unit System has separate loops for: - conditioning fresh or outdoor air - meeting heating/cooling building loads Note: separate primary ventilation system is not shown

HCB 3-Chap 14B: Heat Pumps and Part Load 14 -Increasingly used - Increasingly competitive Figure Different ground-source heat pump configurations (downloaded from Geothermal website)

HCB 3-Chap 14B: Heat Pumps and Part Load 15 TypeAdvantagesDisadvantages Air source Indoor distribution permits air conditioning and humidity control Defrost required Outdoor air source readily available Low capacity at cold outdoor temperature Simple installation Lower efficiency because of large evaporator ΔT ≈ 30°F Least expensive Indoor air distribution temperature must be high for comfort reasons Established commercial technology Reliability at low temperature is only fair, due to frosting effects Must keep evaporator clear of leaves, dirt, etc. Water source Multiple family and commercial installations as central system Needs water source at useful temperature In commercial installations, good coupling to cooling towers Efficiency penalty due to space heat exchanger ΔT No refrigerant reversal needed; reverse water flow instead TABLE ADVANTAGES AND DISADVANTAGES OF AIR AND WATER SOURCE HEAT PUMPS

HCB 3-Chap 14B: Heat Pumps and Part Load 16 Window AC Systems Design criteria:

HCB 3-Chap 14B: Heat Pumps and Part Load 17 Thru-The-Wall Conditioning Systems -This is a larger air-cooled unit designed to be mounted thru a wall (can provide both heating and cooling) -Complete refrigeration system: DX cooling coil, heating coil (electric, hot water, steam) and an air-handler withpackaged controls PTAC and PTHP (Packaged Terminal Air-Conditioner Heat Pumps) Packaged A/C with side discharge and return

HCB 3-Chap 14B: Heat Pumps and Part Load 18 Unitary Split Systems – For residential and small commercial -Both heating and cooling -DX cooling coil -Same ducting used Air-source heat pumps with electric heat can also be used

EER and SEER -COP is the scientific measure of performance for VC chillers -Performance Factor (PF) used for heat pumps under heating mode -HVAC industry uses a dimensional performance measure based on Tons and kW. Energy efficiency ratio (EER) is the ratio of cooling capacity (Btu per hour) to the electric input rate (Watts)- conversion factor EER = COP x Btu/(W. h). -In 1978, the U.S. Congress mandated the use of SEER (Seasonal EER) index which takes into consideration how certain variables affect the performance of the unit in different climatic zone. -Current minimum federal SEER is 13 though commercial units are available with SEER values as high as 23. -Since the SEER reflects performance in conditions milder than those for peak or rated conditions, SEER generally > EER by 2-3 points. Go to efficiency-standards/ for upto date infohttp:// efficiency-standards/ HCB 3-Chap 14B: Heat Pumps and Part Load 19

HCB 3-Chap 14B: Heat Pumps and Part Load 20 Air-Conditioning and Refrigeration Institute (ARI) Trade organization representing North American air- conditioning and refrigeration equipment manufacturers – Publishes standards for rating equipment performance – Certifies performance of equipment through independent testing ARI standards related to chilled water systems – 550/590: Standard for Water Chilling Packages Using the Vapor Compression Cycle – 560: Absorption Water chilling and Water Heating Packages

HCB 3-Chap 14B: Heat Pumps and Part Load 21 Rating Standards OAT- outdoor air temp.EAT- entering air temp. AHRI- Air-conditioning, Heating and Refrigeration Institute

HCB 3-Chap 14B: Heat Pumps and Part Load 22 Integrated Part Load Value (IPLV) Weightings Fraction at each load based on distributions from simulations of typical buildings in 129 US Cities Gives little weight to rated full load performance, heavy weight to part load IPLV typically > rated performance because of condensing temperature relief

HCB 3-Chap 14B: Heat Pumps and Part Load 23 IPLV Calculation COP or EER IPLV = 0.01 x A x B x C x D – A, B, C, D are COP or EER at 100%, 75%, 50%, 25% load, respectively Note: This metric should not be used for multiple chiller installations

HCB 3-Chap 14B: Heat Pumps and Part Load 24 Unitary equipment: - Degradation factor method Medium chillers: - Simplified regression model - DOE model Seasonal and /or annual energy estimation: - Bin method - Modified bin method Part-Load Performance

Degradation Factor Method HCB 3-Chap 14B: Heat Pumps and Part Load 25 Part Load Ratio: Part Load Factor: Compressor power Simplified relationship assumed C d values: 0.15 – 0.25 Fig

Example 14.7 HCB 3-Chap 14B: Heat Pumps and Part Load

HCB 3-Chap 14B: Heat Pumps and Part Load 27 Recap - Bin Methods – Simplified Multiple Measure – Basic Bin Method Gets its name from the way the weather data are put together Weather data are broken into temperature "bins" Each "bin" has the cumulative number of hours it has been at a given temperature range over the whole year Conventional bins are 5 °F – 35 – 39 °F – 40 – 44 °F – 45 – 59 °F…

HCB 3-Chap 14B: Heat Pumps and Part Load 28

Seasonal HP Performance Using The Bin Method HCB 3-Chap 14B: Heat Pumps and Part Load 29 Example 14.8: Seasonal HP Performance

Solution Process HCB 3-Chap 14B: Heat Pumps and Part Load 30

HCB 3-Chap 14B: Heat Pumps and Part Load 31 Example 14.8: Residential Heat Pump Using Bin Method HP balance point Manufac. supplied data

HCB 3-Chap 14B: Heat Pumps and Part Load 32

33 Contd. TOTAL HCB 3-Chap 14B: Heat Pumps and Part Load

34 Figure Heat pump energy use by the bin method, Example The numbers at each bin temperature indicate the number of hours of occurrence in each bin.

HCB 3-Chap 14B: Heat Pumps and Part Load 35 Simple Black-Box Performance Models for Medium to Large Chillers

HCB 3-Chap 14B: Heat Pumps and Part Load 36 DOE 2 Chiller Model For accurate building energy simulation models, the DOE model approach is used We start from the performance map covering the full range of operating conditions. (a) It is mandatory to acquire the cooling capacity and power draw under rated conditions: Then several polynomial correlations are developed from manufacturer data.

HCB 3-Chap 14B: Heat Pumps and Part Load 37 DOE 2 Chiller Model Based on 15 model parameters data points necessary for regression It consists of several sub-models involving: b) Model for capacity at full load under off-design conditions: CAP_FT = f( T ch,out and T cd,in ) c) Model for Energy Input Ratio at full load under off-design conditions: EIR_FT = f( T ch,out and T cd,in ) d) Model for Energy Input Ratio under part load EIR_FPLR = = f( PLR) e) Finally, power drawn by compressor is

HCB 3-Chap 14B: Heat Pumps and Part Load 38

HCB 3-Chap 14B: Heat Pumps and Part Load 39 Example of DOE-2 Model

HCB 3-Chap 14B: Heat Pumps and Part Load 40

HCB 3-Chap 14B: Heat Pumps and Part Load 41 Outcomes Understanding of how heat pumps differ from VC cooling systems Understanding the functioning and components of an air-source HP Be able to solve problems involving selecting air source HPs for residential applications Familiarity with the various factors effecting efficiency of air source HPs Understanding the advantages offered by water source and ground source HPs and some of the system configurations Familiarity with the different types of AC systems for small scale applications Understanding the definitions of EER, SEER, and IPLV Familiarity with the different rating standards Knowledge of the different methods to model part-load performance degradation of small and medium chillers Be able to apply the bin method to analyze the seasonal performance of HP systems Knowledge of the DOE chiller model and be able to apply them to practical problems