Introduction to W7-X Coil Testing at CEA – Saclay, France G.Croari – March 2008.

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

HEAT PUMPS.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
NCSX NCSX CDR May 21-23, 2002 Larry Dudek Slide 1 Facility Systems (WBS 62-65) L. Dudek, G. Gettelfinger, M. Kalish.
CRYOGENICS AND POWERING
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Installation of the T600 at Fermilab Fermilab, February 15,
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
S A Griffiths CM42 June 2015 Electrical & Control.
Overview of Instrumentation and data acquisition system of cryogenic sub-systems of SST-1 D. Sonara, R. Panchal, R. Patel, G. Mehsuria,
SIS 100 Vacuum chamber Recooler String system Components
Teleconf ACS – FREIA 28th March 2017
Instrumentation for status monitoring of SST-1 superconducting magnets
Installation of the T600 at Fermilab
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Cooling down of W7-X coils with/without casing circulation
Cryogenic behavior of the cryogenic system
Figure 17.1 (a) As an engine is accelerated under a load, the engine vacuum drops. (b) The relationship between absolute pressure, vacuum, and gauge pressure.
Neutral current is zero
HFM Test Station Main Cryostat
R&D of neutrino beam production for future (Multi-)MW proton facility:
Test plan of ESS HB elliptical cavity
Introduction to W7-X Coil Testing at CEA – Saclay, France
CRYOGENICS OPERATIONS 2008 Organized by CERN
Horizontal Tests in a Vertical Cryostat
Cryostat design Mechanical design: Thermal screens: Specifications:
TEST PLANS for HL LHC IT STRING
ILC Experimental Hall Cryogenics An Overview
Overarching Commissioning Plan
Schematic diagram of the cryogenic system
ISRC and LEBT Vacuum System Design
Cryogenic behavior of the magnet
Door Heat Exchanger: Specification
Thermohydraulic behaviour of the cryogenic system
Burst Disc Experiences at CEA Test Stand
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Introduction to W7-X Coil Testing at CEA – Saclay, France G.Croari – March 2008

2 1.Test facility description 2.Coil test procedure 3.Main difficulties 4.Conclusion Outline

3 G.Croari – March Test facility description 2.Coil test procedure 3.Main difficulties 4.Conclusion Outline a.Cryostats, valve boxes, satellite b.Power supply c.Pumping system d.Cryogenic part (Refrigerator/liquifier) e.Data acquisition system

4 G.Croari – March Test facility description 2.Coil test procedure 3.Main difficulties 4.Conclusion Outline a.Cryostats, valve boxes, satellite b.Power supply c.Pumping system d.Cryogenic part (Refrigerator/liquifier) e.Data acquisition system a.Documentation b.Incoming Inspection tests c.Coils into cryostat d.Outgoing check

5 G.Croari – March Test facility description 2.Coil test procedure 3.Main difficulties 4.Conclusion Outline a.Cryostats, valve boxes, satellite b.Power supply c.Pumping system d.Cryogenic part (Refrigerator/liquifier) e.Data acquisition system a.Documentation b.Incoming Inspection tests c.Coils into cryostat d.Outgoing check a.DC test b.Leaks c.Detail of some coils

6 G.Croari – March Test facility description 2.Coil test procedure 3.Main difficulties 4.Conclusion Outline a.Cryostats, valve boxes, satellite b.Power supply c.Pumping system d.Cryogenic part (Refrigerator/liquifier) e.Data acquisition system a.Documentation b.Incoming Inspection tests c.Coils into cryostat d.Outgoing check a.DC test b.Leaks c.Detail of some coils a.My contribution

7 G.Croari – March 2008 a)Cryostats, valve boxes, satellite b)Power supply c)Pumping system d)Cryogenic part (Refrigerator/liquifier) e)Data acquisition system Test Facility Description 1. Test Facility Description

8 G.Croari – March 2008 Test Facility Description Cryostat, Valve boxes, Satellite Test Facility Description Cryostat, Valve boxes, Satellite Cryostat 1 Test Frames Satellite Valve box C 2 Valve box C 1 Cryostat 2

9 G.Croari – March 2008 Test Facility Description Cryostat, Valve boxes, Satellite Test Facility Description Cryostat, Valve boxes, Satellite Valve box C 1 Valve box C 2 Satellite Power Supply terminals

10 G.Croari – March 2008 Test Facility Description Cryostat, Valve boxes, Satellite Test Facility Description Cryostat, Valve boxes, Satellite Connections for Coil A Nitrogen Shield Connections for Coil B Cryostat detail

11 G.Croari – March 2008 Test Facility Description Cryostat, Valve boxes, Satellite Test Facility Description Cryostat, Valve boxes, Satellite Current leads Valve box detail

12 G.Croari – March 2008 Test Facility Description Cryostat, Valve boxes, Satellite Test Facility Description Cryostat, Valve boxes, Satellite Valves Valve box detail

13 G.Croari – March 2008 Test Facility Description Cryostat, Valve boxes, Satellite Test Facility Description Cryostat, Valve boxes, Satellite Safety Valves Calibration Leak Cablings Valve box detail

14 G.Croari – March 2008 Test Facility Description Power Supply Test Facility Description Power Supply Simplified schematicInput: 380 Vac 3-phase IoutTransformerThristorsLoad

15 G.Croari – March 2008 Test Facility Description Power Supply Test Facility Description Power Supply Input: Max absorption 980 A Nominal Power 700 KVA Water cooled Output: Max current 25KA Max Voltage 10V Regulation: <+-10 E-4 on inductive Loads <+-10 E-3 on resistive Loads

16 G.Croari – March 2008 Test Facility Description Pumping System Test Facility Description Pumping System

17 G.Croari – March 2008 Test Facility Description Pumping System Test Facility Description Pumping System Primary system

18 G.Croari – March 2008 Test Facility Description Pumping System Test Facility Description Pumping System Secondary system

19 G.Croari – March 2008 Test Facility Description Pumping System Test Facility Description Pumping System Diffusion pump Vane pump Secondary systemPrimary system Root pumps

20 G.Croari – March 2008 Test Facility Description Cryogenic part: Refrigerator / Liquifier Test Facility Description Cryogenic part: Refrigerator / Liquifier Cold Box Nitrogen Exchanger Heat Exchanger Turbine Cold Helium

21 G.Croari – March 2008 Test Facility Description Cryogenic part Refrigerator / Liquifier Test Facility Description Cryogenic part Refrigerator / Liquifier Specifications of cold part: Total mass flow rate gr/sec 300 K Refrigerating power = 4,2 K LHe production = 70 Lt / hour 5000 Litres LHe tank

22 G.Croari – March 2008 Test Facility Description Data Acquisition System Test Facility Description Data Acquisition System Signals: Voltage drops Mass flow meters Current of Power Supply Pressure drops Temperature Strain gauges Extensometer Coils Coils & Test Facility

23 G.Croari – March 2008 Test Facility Description Data Acquisition System Test Facility Description Data Acquisition System Measurement on coils: Temperature sensors Strain Gauges Extensometer

24 G.Croari – March 2008 Test Facility Description Data Acquisition System Test Facility Description Data Acquisition System Sensors VoltageCurrentOthers Condition Cool down / Warm up (phase 1)0.025Hz Cold Test day (phase 2)1Hz Quench / Fast Discharge (quench)5kHz 100Hz

25 G.Croari – March 2008 a)Documentation b)Incoming Inspection tests c)Coils into cryostat d)Outgoing check Coil Test Procedure 2. Coil Test Procedure

26 G.Croari – March 2008 Coil test procedure Documentation Scope and Requirements

27 G.Croari – March 2008 Coil test procedure Documentation Scope and Requirements Documentation

28 G.Croari – March 2008 Coil test procedure Documentation Scope and Requirements Documentation Non Conformrmity Report

29 G.Croari – March 2008 Coil test procedure Incoming Inspection Tests Unloading from the lorry

30 G.Croari – March 2008 Coil test procedure Incoming Inspection Tests Unloading from the lorry Installation under a test frame

31 G.Croari – March 2008 Coil test procedure Incoming Inspection Tests Unloading from the lorry Installation under a test frame Bending and Joint box installation

32 G.Croari – March 2008 Coil test procedure Incoming Inspection Tests Unloading from the lorry Installation under a test frame Bending and Joint box installation Cablings and tests: Temperature sensors, Strain gauges, Extensometers

33 G.Croari – March 2008 Coil test procedure Incoming Inspection Tests Unloading from the lorry Installation under a test frame Bending and Joint box installation Cablings and tests: Temperature sensors, Strain gauges, Extensometers QD Wire check, DC insulation test

34 G.Croari – March 2008 Coil test procedure Coils Into Cryostat Coil at open cryostat: QD wire check, DC test

35 G.Croari – March 2008 Coil test procedure Coils Into Cryostat Coil at open cryostat: QD wire check, DC test Under Vacuum: Leak test Calibration leak Coil leak

36 G.Croari – March 2008 Coil test procedure Coils Into Cryostat At open cryostat: QD wire check, DC test Under Vacuum: Leak test Coils at cryogenic temperature: Current test, AC test, DC test

37 G.Croari – March 2008 Coil test procedure Coils Into Cryostat At open cryostat: QD wire check, DC test Under Vacuum: Leak test Coils at cryogenic temperature: Current test, AC test, DC test AC test is to test the interlayer insulation

38 G.Croari – March 2008 Coil test procedure Coils Into Cryostat At open cryostat: QD wire check, DC test Under Vacuum: Leak test Coils at cryogenic temperature: Current test, AC test, DC test DC test is a general check of insulation

39 G.Croari – March 2008 Coil test procedure Outgoing check Before shipment: QD wire check Outgoing check

40 G.Croari – March 2008 a)DC test b)Leaks c)Detail of some coils Main Difficulties 3. Main Difficulties

41 G.Croari – March 2008 Main Difficulties DC Tests Coil Arrival Coil Departure Room T After warm up Cryo T

42 G.Croari – March 2008 Main Difficulties DC Tests Coil Arrival Coil Departure Room T After warm up 100% OK about 30% OK If it failed at Cryo T It fails at room T too Cryo T about 70% Not OK

43 G.Croari – March 2008 Main Difficulties DC Tests DC test failures: possible explanations In the coil In the test facility Ground Insulation QD wires Cryostat connections Hydraulic connections Holding system

44 G.Croari – March 2008 Critical points on the coil: Ground Insulation Main Difficoulties DC Tests

45 G.Croari – March 2008 Critical points on the coil: Ground Insulation Main Difficulties DC Tests

46 G.Croari – March 2008 Critical points on the coil: Ground Insulation QD Wires Main Difficulties DC Tests

47 G.Croari – March 2008 Critical points on the test facility: Cryostat connections (QD bucket) Main Difficulties DC Tests

48 G.Croari – March 2008 Critical points on the test facility: Cryostat connections (QD bucket) Hydraulic connections Main Difficulties DC Tests Internal view of a valve box

49 G.Croari – March 2008 Critical points on the test facility: Cryostat connections (QD bucket) Hydraulic connections Holding system Main Difficulties DC Tests

50 G.Croari – March 2008 Main Difficoulties Leaks Coils Test facility AAB10 welding during current test (03/08/2007) Valve box potential breaker (28/03/2007)

51 G.Croari – March 2008 Main Difficulties Detail of some coils AAB10: Helium leak during current test 12345

52 G.Croari – March 2008 Main Difficulties Detail of some coils AAB54: Too high joint boxes resistance Electrical Contacts Warm up the coil and redo the test

53 G.Croari – March Conclusion a)My Contribution

54 G.Croari – March 2008 Conclusion Coil testing is about 60 % accomplished The testing rate increased significantly from 2 coils / year in 2003 up to 18 coils / year in 2007 A failure can be considered as a chance to learn more

55 G.Croari – March 2008 Conclusion My contribution Daily communication between CEA and IPP Documentation in case of unexpected behaviour during test Understanding of the test facility

56 G.Croari – March 2008 Conclusion My contribution What I would like to improve: La Langue Française Control Systems Data Acquisition Systems

57 G.Croari – March 2008 Thanks to... CEA: L.Genini B.Renard L.Vieillard All the French technicians IPP: K.Hertel H.Viebke J.Baldzuhn H.Ehmler