Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.

Slides:



Advertisements
Similar presentations
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Advertisements

31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
18-22 Oct 2010, IWLC2010 in Geneva K. Kawagoe / Kobe University Disclaimer: 27 presentations in 5 sessions on Wednesday/Thursday & Workshop dinner on Wednesday.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
1 Status of GEM DHCAL Andy White For GEM-TGEM/DHCAL Group March 21, 2011 ALCPG11 Workshop Univ. of Oregon Introduction 30cmx30cm 2D readout with KPiX chip.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Summary of LCTW09 Roman Pöschl LAL Orsay LCWS 2010 Beijing/China March 2010.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Lei Xia ANL – HEP. Physics prototype: proof of principle Linearity CALICE SiW ECAL.
Report from the Steering Board Board met twice 1 representative/country + management 17 people attended (2 of which remotely) Funding remains critical.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.
Andy White University of Texas at Arlington For GEM DHCAL Group CALOR 2012 Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test Analysis.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE Collaboration Meeting May 2011 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting CERN May 2011.
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Heidelberg September 2011.
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Casablanca/Maroc Sept
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay - Data Collected with the Ecal - Ecal in July running - Collected Data and Glimpse on Quality.
SOCLE Meeting Dec Roman Pöschl LAL Orsay - Publications - Data taking at FNAL - Collected Data and Glimpse on Quality - EUDET Prototype - Summary.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
CALICE Collaboration Meeting March 2012 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Shinshu March 2012.
14.4. Readout systems for innovative calorimeters
From FNAL to UTA Report from the Technical Board Roman Pöschl
Final CALICE OsC meeting: Status and summary of project
Test beams future plans - Discussion session-
Introductory remarks Felix Sefkow Collaboration Meeting
CALICE Silicon ECal Sensors Status and prospects
Test Beam Request for the Semi-Digital Hadronic Calorimeter
SiD Calorimeter R&D Collaboration
LC Test Beam Activities
CALICE News The 2007 beam tests have started!
Status of Ecal(s) for ILD
(My personal) CALICE Report
The DHCAL: an overview José Repond Argonne National Laboratory
Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN
ECAL project in the future 2-3 years
Report from the Technical Board
C. de La Taille IN2P3/LAL Orsay
BT2017 Analysis meeting LAL, 30/11/2017
ScECAL+AHCAL+TCMT Combined Beam FNAL
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Technical Board – DCAL Software
GEM-based Digital Hadron Calorimetry for SiD
GEM DHCAL Status and Plans
CALICE: Major Items Since September
Presentation transcript:

Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011

CALICE Collaboration Meeting Sept Some boundary conditions To be taken into account : - FNAL shutdown 3/12 – 2/13 - CERN shutdown (?) - DESY available all the time and flexible (Ideal for tests with small setups) Detailed planning i.e. of CERN and FNAL is naturally not in our hands

CALICE Collaboration Meeting Sept Prototypes. Prototypes...

CALICE Collaboration Meeting Sept SiW Ecal - Progresses in ASU development/construction will be accompanied by beam test efforts Priority to achieve viable and lasting technical solution over rush to have a full size calorimeter. Keywords : Wafer technology, challenging SKIROC circuits, flat ASUs Long slabs Short terms plans are driven also by French ANR funding - Will make as much as possible use of (flexible) DESY beam test Tests in magnetic field (General response, power pulsing) may require beam time at CERN (!?), magnets elsewhere ? Irradiation tests are may be an option - Expect to have up to 10 equipped ASUs at the end of 2012 most likely conservative technology - Switch to aggressive technology in 2012/13 DESY test beam should be fine also in 2013

CALICE Collaboration Meeting Sept Timeline: 2011 Design phase 2011 – 2012 production phase Beginning 2012: Test in Japan 2012 Installation in 'EUDET Module' Structure (SiW Ecal) 2012 Beam test in multi layer Structure with SiW Modules Scint Ecal

CALICE Collaboration Meeting Sept Phase II (late 2011 – early 2013): 33cm x 100cm unit chamber development and characterization Begin construction of 2 unit 100cmx33cm chambers, one with kPiX and one with DCAL Bench test with sources and cosmic rays and beam tests Construction of 100cmx100cm plane → Unlikely to have beam test before FNAL 2012 shutdown CERN is an option? Phase III (Early 2013 – mid 2014): 100cmx100cm plane construction Construct 6 unit chambers with DCAL for two 100cmx100cm planes Characterize 100cmx100cm planes with cosmic rays and beams → In time for reopening of FNAL beam lines GEM plans

CALICE Collaboration Meeting Sept Technological prototype of AHCAL First tests of second generation AHCAL layers We expect about 2 layers Would try to reproduce T3B data as proof of principle: run with tungsten Few days towards the end of 2012 run can be done at PS or SPS DESY Testbeam as default facility Integration into tungsten stack (see later)

CALICE Collaboration Meeting Sept SDHCAL Micromegas - Continuing program with a small number of layers → New layers will be examined Tests of power pulsing, spark protection 1 week standalone in Integration into SDHCAL stack Two or more layers into SDHCAL stack

CALICE Collaboration Meeting Sept GRPC SDHCAL - Continuation of 1m3 program which have started in 2011 SDHCAL is essential part of e.g. ILD DBD !!! - Request to apply for 2x4 weeks at SPS in 2012 It is however essential that one period is scheduled at the very beginning of 2012

CALICE Collaboration Meeting Sept W-Hcal program Importance to have data with scintillator and gas → Scintillator sample fairly complete, convince whether more data needed - CALICE has one stack and two sets of RPCs TB identified that in 2012 we should concentrate on running with the DHCAL RPC A run plan could look like - Spring setup at PS T7 - One week in PS T9 - Take 2x two weeks at SPS - Runs in combination with a SiW Ecal would be desirable but is 2 nd priority Looks unlikely/impossible that this can be realised Manpower limited and persons are working on technological prototype

CALICE Collaboration Meeting Sept Summary of plans/requests for 2012 CERN SPS: 2x4 weeks for SDHCAL running at SPS (one in very early 2012) 2x2 weeks of tungstene program with DHCAL RPC Optional 1 week to complete the scintillator program with tungsten 1 week for Micromegas running Comment : Should strive for parallel running in H6 and H8 line Keyword wobbling => Could optimise beam energies by ourselves 1 week SiW Ecal tech. prototype in magnetic field (Should happen in first half of 2012) => Total (up to) 14 weeks at SPS in 2012 CERN PS : 2 week at PS T9 for commissioning of W-stack with RPCs + setup time ain T7 beam line DESY : Alltogether about 4-6 weeks with Ecals and AHCAL techno. prototypes CERN requests 2012 : Organisation of beam test workshop Proposal by Ilias of CERN No news since but TB is favorable of such workshop → Relaunched Ilias and will try to push for it May avoid bad surprises as in 2011

CALICE Collaboration Meeting Sept Movable stage and TCMT Stage at FNAL since spring Will be brought back to Europe During winter 2011/12 - Needs repair work and maintenance Requests from W-Program and SDHCAL TCMT : CALICE disposes two TCMTs, one at FNAL and one at CERN Need both TCMTs at CERN in 2012 → Organisation of transport needed

CALICE Collaboration Meeting Sept Summary very rich program at all fronts Need to find good balance between interests, duties and timescales Major objectif 2012 : ILC Detector DBD Needs emphasis on technological development and understanding of technologies - CERN 2012 Organisation of beam test workshop to get overview on request from other looks still a bit unclear Plans for Ecals, AHCAL tech. prototype and GEMs No realistic scenario for major, i.e. combined, beam test Could anyway only take place at FNAL