Calibration and monitoring system for FPD to check the response of the MAPMT and L0PMT as it involves in time ( + to see if we have any dead channels +

Slides:



Advertisements
Similar presentations
Study of Cross-talk on the MAPMT-to-Hybrid cable.
Advertisements

HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Prototype Mechanical / optical considerations 1.Current LED system performance 2.New APD / Fiber /Strong Back integration scheme.
Noadswood Science, Optics  To be able to calculate the refractive index using the critical angle of a substance Thursday, August 06, 2015.
Liquid Management System Johnny Sang Vishnu Reddy Zachary Radtka.
Spencer Fuller Colin Rex and Chase Lefort.  What is a mixer?  A mixer is a piece of equipment used in the production of audio, by connecting all of.
FlyBot is an airplane robot. This robot consists of the DC motor which supplies rotatory power to the propeller. Fly.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Comparing Network Cables Computer Networking. Comparing Network Cables The Internet uses three main types of cable to transfer data between computers.
3/14/2007AD/Instrumentation Department Jim Zagel 1 MFW Update 3/14/07 Latest problems RFT Looses Phase Lock –Real 53 MHz connected to the RFT at MI-10.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
HB LED Pulser Boards By Michael Miller The University of Iowa.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
Background Report 1394b:Optoelectronic Data Communications ECE 4006C Tiffany Lovett Tornya Moore Mareisha Winters January 31, 2002.
5/9/03Andrei Sukhanov. Phobos BWMeeting1 Andrei Sukhanov – measurements, analysis Ioury Sedykh – software, calculations Piotr Kulinich – measurements,
Guitar Tuner ECE 5330 Embedded Systems Design Final Project Results Mike Heiny December 8, 2008.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
1 Test Setups for the FE-I4 Integrated Circuit Stewart Koppell 8/1/2010.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
12/06/2006 MFW. 12/06/2006 P-Bar Injection 12/06/2006 MFW Latest problems stem from RFT Module loosing phase lock. Greg Vogel informs us that the “real.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
CDMS II Shielding To Installation To Construction From Design.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
JRA3 Institute of Physics ASCR Prague
A. F. Yanin, I. M. Dzaparova, E. A. Gorbacheva, A. N. Kurenya, V. B
LED notched fibre system short HBU0 party with QMB6
1: Connect turntable to phono pre-amp using an audio cable Audio Plugs
Baby MIND Collaboration Meeting #2
New LED driver Preliminary tests
• The part of the PC that you actually see is the case
Pulse Detector Ramiro Duarte, Clayton Greenbaum Frank Paynter
Preparation for Station Acceptance Test
HPS Motherboard Electronic Design
Presentation created by Jared D.
Introduction to computer networks
Front-end electronic system for large area photomultipliers readout
4 channels, each as input or output
2 channels, each as input or output
RPC Front End Electronics
POE Anviz Online Training Lesson 2
Testing of the EMCO Prototype Boards
Solar Telematics System
Test of Link and Control Boards with LHC like beam, CERN, May 2003
RPC Front End Electronics
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
ECE Computer Engineering Design Project
BUCKEYE has internal shift register which controls calibration
2019 Investing Now Summer Program
Presentation transcript:

Calibration and monitoring system for FPD to check the response of the MAPMT and L0PMT as it involves in time ( + to see if we have any dead channels + compare the response of the individual channels ?) LMB (light mixing box) – LEDs inside; after the LED receives the electric pulse it emits the light which is transmitted via optical fibers into MAPMT (L0PMT)

LMB – light mixing box FPD has 5 LMBs (dip – 36 fibers; A1,A2,P1,P2 – 64 fibers each) SLP pulse PIN power (+6,-12V,ground) PIN out 3m long round 1mm

SLP pulse The SLP pulse will be generated by the special VME boards. These boards are in the moveable counting house. The pulse will be send via the long green signal cables to our LMBs in the tunnel. The leading edge of this pulse should be sharp (5-15?ns) after the long cable to be able to produce light.

Cartridge MAPMT calibration: - 16 LMB fibers per cartridge - each LMB fiber is connected to the bunch of  m fibers - each of these little fibers goes to one MAPMT channel (there are glued into the cookies) L0PMT calibration: - make another hole and use the spare LMB fibers

1 – PIN out (use the spare AMP board, ribbon cable, AFE board) ? 2 – PIN power (+6V,-12V,ground – from AMP power supply) 3 – SLP 4 – ribbon cables 5 – optical fibers 6 – flat cables (between MAPMT and AMP) Layout