The Planar GEM-Tracker …mechanics clashes Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)

Slides:



Advertisements
Similar presentations
Planar-GEM Trackers Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)
Advertisements

GSI Helmholtzzentrum für Schwerionenforschung GmbH Platforms and Infrastructure Collaboration meeting GSI-CERN
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
GSI Helmholtzzentrum für Schwerionenforschung GmbH Instrumentation Collaboration meeting GSI-CERN
Fox Thinking Tool.
B. KetzerGEM-TPC GEM-TPC Meeting Bernhard Ketzer Technische Universität München 14 February 2008 Telephone Conference.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
A.Levin, IHEP, Protvino, RussiaApril 27, nd PANDA Russia Workshop Status-report on the barrel mechanical design work. A.Levin Institute for High.
AIDA Infrastructure for very forward calorimeters Design proposal Mechanical support structure Designers:In collaboration with: Eric DavidFrancois-Xavier.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Mounting guide of G40 Camera VIDO Electronic Vertriebs GmbH.
AIDA Infrastructure for very forward calorimeters Mechanical design adapted to the existing electronics 6/09/2011 Designers:In collaboration with: Eric.
FCAL mechanics – by (at) CERN Konrad Elsener FCAL HW WG meeting, 9 February
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
GSI Helmholtzzentrum für Schwerionenforschung GmbH CRYRING Commissioning Issue tracking.
Requirements on a DCS system for GEM-based detectors Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Survey techniques for experiments and advanced 3 D Digital Reconstruction Aurelie Maurisset, Christophe Bault, Andrea Catinaccio October 1 st 2010 Ref.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
Matter and Technologies Detector Technologies and Systems Gaseous Detectors Bernd Voss (GSI)
News on … PANDA Central Tracker (GEM-TPC) Forward Tracker (GEM-DISCs)
DCal-ALICE integration and installation plan and status A. Tauro.
S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN Doro Lehmann has started to update barrel DIRC in CATIA based.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS multiplet field.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Status of the FAIR Antiproton Target K. Knie.
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
Kitakami Side AHCAL Assembly or anywhere in any detector.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
BM&N STS ladders assembly in VLHEP
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Teleconf ACS – FREIA 13th March 2017
n-XYTER Hybrid Developments
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
MECHANICAL FRAME OF THE MVD
Hcal Geometry and Assembly
- CT INSTALLATION PROCEDURE OVERVIEW -
PANDA Fw Endcap EMC, status prototype
GEM-TPC Status Report GEM-Trackers see MEC session (14:00 hrs)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Status of the Mechanics at Ciemat.
PANDA Yoke of the Magnet
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
PANDA Mechanical Design
cooling and supports of the forward endcap EMC
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
BoNuS: Radial-Drift TPC using Curved GEMs
IHEP group Shashlyk activity towards TDR
SDHCAL Integration Moi j’aime bien SAFARI
FRESCA2 Update on the dipole design and new calculations
Actual Dimensions in the Forward Spectrometer
Integration issues at IHEP
the MDP High Field Dipole Demonstrator
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
MicroMegas Mechanical Meeting --- Cern April 2014
HPGe Planar Detector Stack
Status of the PANDA Solenoid Magnet Production in BINP
Presentation transcript:

The Planar GEM-Tracker …mechanics clashes Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)

B. Voss et. al. 2 GEM-Tracker Mechanics Clashes PANDA collaboration meeting March 6th 2012 How does one expect ‘disturbance free’ recording ?

B. Voss et. al. 3 GEM-Tracker Mechanics Clashes PANDA collaboration meeting March 6th 2012 Shift: All by 20mm & Mounting: to plate but how (40 mm)? GEM1: D-14mm

B. Voss et. al. 4 GEM-Tracker Mechanics Clashes PANDA collaboration meeting March 6th 2012 Distances as negotiated

B. Voss et. al. 5 GEM-Tracker Mechanics Clashes PANDA collaboration meeting March 6th 2012 Former ‘white space’ taken

B. Voss et. al. 6 GEM-Tracker Mechanics Clashes PANDA collaboration meeting March 6th 2012 Merely any space left for cable routes

B. Voss et. al. 7 GEM-Tracker Mechanics Clashes PANDA collaboration meeting March 6th 2012 Only 23 mm space available to reach into acceptable area

B. Voss et. al. 8 GEM-Tracker Mechanics Clashes PANDA collaboration meeting March 6th 2012 Magnet cutout not as expected & detectors ‘sticking out’

B. Voss et. al. 9 GEM-Tracker Mechanics Clashes PANDA collaboration meeting March 6th 2012 No cable routes / traces from other sub-systems

Dirk AuerMoulds, FEM simulations André RemersMould supports, craftsman André EhretSupplies Conduit, FEM simulations Andrea NeebRelief person, gofer Eldrige Tchoua YamedjiGEM-Disc Moulds, Fasteners Jochen KunkelGeneral support, drawings, assembly, gofer Jörg ReussRiddle-mould, Handyman Sarah SchützSupport & Insertion tool Eduard TrautMoulds, Support & Insertion tool Elena TrautCabling & Infrastructure Bernd VossFlea circus tamer, Concepts … the GSI-DL & central infrastructure (mainly mechanical workshop) GEM-Tracker Mechanics Core-Crew members & tasks