Doc.: IEEE 802.11-08/0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 1 TGw Closing Report January 2008 Notice: This document has been.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Advertisements

Doc.: IEEE /0215r1 Submission January 2006 Jesse Walker, Intel CorporationSlide 1 TGw Closing Report Notice: This document has been prepared to.
Doc.: IEEE /0652r1 Submission May 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D0.12 Insert and Deletion Notice: This document has been.
Doc.: IEEE /0377r2 Submission March 2005 Adrian Stephens, Intel CorporationSlide 1 Ballotting Process Improvements Notice: This document has been.
Coexistence Motions for LB84 Comment Resolution
LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
JTC1 Ad Hoc Closing Report
Motions Date: Authors: January 2006
JTC1 Chair’s Closing Report
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGu-changes-from-d0-02-to-d0-03
TGw Closing Report Date: Authors: March 2007 Month Year
JTC1 Ad Hoc Mid-week Report
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
TGs San Diego Closing Report
IEEE WG Opening Report – July 2008
ADS Study Group Mid-week Report
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGw Closing Report March 2008
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
IEEE White Space Radio Intended timeline
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
Motions for 2007/01 Date: Authors: January 2007 Month Year
TGr Closing Report May 2007 Date: Authors: July 2005
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
May 2005 CAPWAP AHC Closing Report
Beamforming and Link Adaptation Motions
January Opening Report
IEEE P Motions at the July Plenary EC Meeting
Advanced Beaconing Schedule and Timelines
IEEE TGw November Agenda
TGu Timeline Date: Authors: May 2006 May 2006
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
JTC1 Chair’s Closing Report
TGp Closing Report Date: Authors: January 2006 Month Year
TGu-changes-from-d0-03-to-d0-04
Tge Closing Report Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: January 2005 January 2005
TGw Chair’s Report Date: Authors: July 2006 Month Year
TGu Timeline Date: Authors: May 2005 May 2005
TGw Closing Report March 2008
TGu Timeline Date: Authors: July 2005 July 2005
TGw Chair’s Closing Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 1 TGw Closing Report January 2008 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 2 Abstract This presentation contains the IEEE TGw closing report for January 2008.

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 3 January Meeting Status & Objectives TGw Status –83 comments received during LB 117 January Meeting Objectives –Comment Resolution –Update official timeline –Plan teleconferences/ad hocs –Send draft 5.0 to recirculation if complete

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 4 Submissions w-lb117-comment-resolutions.xls w-sa-teardown-protection-text.doc w-key-hash-and-mic-extensions.doc w-january-2008-agenda.ppt w-tgw-taipei-meeting-minutes.doc

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 5 Accomplishment Adopted comment resolutions to all comments received from LB 117 Achieved consensus on final remaining technical issue that has been raised and rejected for several letter ballots –Closing disassociate forgery makes the i associate lock-out the most viable attack –Group achieved consensus (4-1-1) this problem requires solution and adopted a solution Requested ANA values for P802.11w Requested WG to send P802.11w D5.0 to recirculation

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 6 Recognition and Thanks To Editor Nancy Cam-Winget (Cisco Systems) for driving comment resolutions and preparing drafts To Kapil Sood (Intel Corporation), for being secretary for this meeting To Joe Epstein (Meru Networks), for driving consensus for the association lock-out problem To the Task Group, for achieving consensus that the association lock-out problem is an important problem requiring a solution for w and adopting a solution.

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 7 Conference Calls Friday, Feb 29, 12-2 ET Wednesday, Mar ET for the purpose of proposing letter ballot resolutions

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 8 Motion Motion: Believing that all the conditions for a recirculation of P802.11w have been satisfied, to request the Working Group authorize a 15-day Working Group Recirculation Ballot on P802.11w D5.0 Mover: Kapil Sood Seconder: Nancy Cam-Winget Result: 2-0-0

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 9 Official TGw Timeline See Timelines.htm: Timelines.htm Initial Working Group Letter BallotOctober 2006 Re-circulation Working Group Letter BallotApril 2007 Form Sponsor Ballot PoolNovember 2007 Initial Sponsor BallotMarch 2008 Re-circulation Sponsor BallotMay 2008 Final WG/EC ApprovalNovember 2008 RevCom/Standards Board ApprovalMarch 2009

doc.: IEEE /0186r0 Submission January 2008 Jesse Walker, Intel CorporationSlide 10 March Meeting Objectives Resolve comments received on P802.11w D5.0 Request recirculation of P802.11w D5.0 –If no significant new comments received, reballot unchanged Sponsor Ballot request, conditional on ballot of P802.11w D5.0 meeting the conditions for Sponsor Ballot