Review of the Market Reform report Presentation to PEA Wellington 2 November 2012 James Mellsop Director.

Slides:



Advertisements
Similar presentations
Water Markets & Tradable Permits Sopheak & Huy. Our Focus Water Markets & Transferable Permits Water Auctions Tradable Pollution Permits Lessons Learnt.
Advertisements

Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Writing a Proposal. What is a Proposal?  It is the explanation of what you intend to do in your paper.  It is your argument in favor of doing the proposed.
European Commission Slot allocation at Community airports Infrastructures and Airports Unit Klaas Pel.
Yale School of Management What causes the underpricing of auctioned IPOs? Experimental Evidence Panos Patatoukas, October 2007.
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
AUSTRALIAN OFFICE OF FINANCIAL MANAGEMENT The Australian Government Bond Market Peter McCray Deputy Chief Executive Officer.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
© Copyright Incyte Consulting 2008 Establishing cost-based interconnection: regulatory challenges and solutions Presentation to Infofest conference Budva,
1 Recent and Emerging Water Policy Reforms in Australia Paper presented at National Taiwan University – Taipei 14 September 2006 Dr. Henning Bjornlund.
Cost-Benefit Analysis Delia Prieto University of Miami December 10, 2011.
An introduction to infrastructure services. Presentation outline  key characteristic of infrastructure industries economies of scale and/or scope  GATS.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Transfer & Trades Special Transmission Workstream
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Principles of Good Airport Regulation Stuart Holder Associate Director, London Lisbon 22 November 2005.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GRI - SSE Workshop on system access Vienna, EFET SSE © Copyright 2006 EFET European Federation of Energy Traders 1.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Making the Case for Interregional Transmission Projects: Evaluation of Benefits and Allocation of Costs Jose Fernando Prada Engineering & Public Policy,
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
Overview of the Contract Carriage Gas Markets in Eastern Australia James Mellsop Director 4 December 2012 Presentation to PEA.
Gas Transmission and Capacity Pricing Workshop 11 April 2013.
Work Plan and Key Deliverables 2 November WORK PLAN.
Gas Transmission and Capacity Pricing Workshop – Topics for Discussion 11 April 2013.
Proposals for physical constraint management Presentation to PEA James Mellsop Director Wellington 29 January 2013.
Transmission Access Workshop 8 March Workshop agenda 1.Introduction 2.Allocative Efficiency - initial allocation ● Is the length of property right.
Nominations James Mellsop Director 4 December 2012 Presentation to PEA.
PEA meeting material 15 March PEA’S FURTHER ADVICE TO GIC ON TRANSMISSION ACCESS AND CAPACITY PRICING Gas Industry Co2.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Copyright © 2017, 2014, 2011 Pearson Education, Inc. All Rights Reserved Personal Finance SIXTH EDITION Chapter 18 Asset Allocation.
Gas Transmission and Capacity Pricing Workshop - Introduction 11 April 2013.
Aligning the Gas and Electric Markets: EDF Solutions
Details of demand management options
IAAE International Conference Singapore June 18-21, 2017
Gas Transmission Access: Priority Rights
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
ERS Procurement Methodology
Draft for factual comments, suggestions on overlaps welcome.
Chapter 18 Asset Allocation
Electricity Wholesale Markets: Designs for a low-carbon future
Regulators’ update on Congestion Management and Balancing
Chapter 19 Asset Allocation.
Transmission: the Critical Link
Questions on “The Problem of Social Cost”
Chapter 8: Selecting an appropriate price level
Tourism Marketing for small businesses
GTAC Workshop Block 5 19 September 2018.
Cost allocation of enabler projects Commissioning dates
Transmission Pricing & Regional Electric Markets
THE FIRM AND ITS CUSTOMERS: PART 2
Gas Transmission Access Code: Submission on GIC Preliminary Assessment
Economics: Foundations and Models
Diminishing Musharakah
Demand management options on the Vector pipeline system
Questions for Consultation
An action-based way forward
Frameworks for considering longer-term options
Presentation transcript:

Review of the Market Reform report Presentation to PEA Wellington 2 November 2012 James Mellsop Director

1  Submission on PEA paper by Larry Ruff of Market Reform (“MR”) (dated 31 August 2012)  These slides summarise my written review (dated 26 October 2012) of that paper Introduction

The MR problem definition

3  MR report argues that a point-to-point contract carriage regime will be inefficient when –There are multiple injection and withdrawal points on a pipeline –The value of injecting/withdrawing at those points changes over time  Point-to-point contracts will be too rigid to allocate physical capacity properly –Lack of reconfiguration Conceptual problem definition (1)

4  At least at a conceptual level, MR critique of a point-to-point contract regime on a pipeline with dynamic loads seems to be a fair one –Indeed, grandfathering rights would make the problem even worse  Note that other submissions were also concerned that current point-to-point contract carriage regime does not allocate physical capacity efficiently –Albeit they did not (explicitly) use the same argument as MR report Conceptual problem definition (2)

5  But is the conceptual problem a practical/real problem on the Vector system? –The MR report does not demonstrate a practical problem –How variable are the loads at the various locations? –Interesting to compare the Vector system to the Victorian one Practical problem definition?

6 VectorVictoria Annual withdrawals120PJ230 PJ Injection points89 Withdrawal points>130>120 Length2,287km~2,000km Major Pipelines65 Vector versus Victoria

7 Victorian system

8 Vector system

9 Vector injection points Rotowaro comp Kanpuni comp MokoiaKGTPPokuru 1 Pokuru 2 Frankley Rd Kupe Rd North√ South√√ Central (North) √ Central (South) √ BOP√√ Frankley Rd √√

10  If area of interest is just northern pipeline, there is only a single injection point, and issues appear less complicated than in Victoria –i.e., single injection point with multiple withdrawal points vs. multiple injection and withdrawal points  This is just a preliminary analysis –Not seeking to draw any strong conclusions –Main point is that it is not clear at this stage that conceptual problem identified by MR report is in fact a real problem for Vector pipeline system Vector less complicated?

11  Even if problem identified by MR report turns out to be a practical one, still issue of whether solution proposed by MR report is most cost effective one Most cost effective solution?

The MR solution

13  Effectively the Victorian system  Price and allocate physical capacity on a daily market operated by TSO –Bids for selling/injecting at each location, and buying/withdrawing –If no congestion, only pay for daily imbalances –If (physical) congestion, there will be a congestion price  Would still require throughput and fixed fees to recover pipeline costs Victorian-style system

14 Efficacy (1)  MR claim – Victorian market “most competitive, liquid and transparent … in Australia”  But efficacy of Victorian market is actually quite controversial –Complex –Investment difficulties –No firm capacity at fixed price FTRs have not developed

15 Efficacy (2)  Too early to provide a definitive view on efficacy of Victorian market –But not a solution without difficulties  Even if there is a practical problem, is the MR solution the most cost effective one? –Common carriage? –MR report supports common carriage when supply/demand weak and growing slowly

16 Cost benefit analysis  Need to carry out CBA for the Vector system of –Victorian-style regime –Common carriage  But Victorian-style regime would entail more radical change –Integrated gas/transmission market –New set of market arrangements –Market-clearing model

The MR critiques of PEA report

18 Grandfathering (1)  PEA’s proposal to water down grandfathering rights “would require even more trading without doing anything to improve it, is unnecessary given the companion recommendation for an annual RC XY auction, and would be counterproductive in its effect on long-term contracting”

19 Grandfathering (2)  But –Objective of watering down grandfathering rights is to assign more of the allocation role to the primary market, reducing reliance on secondary market –Reduction in certainty in exchange for improved allocative efficiency

20 Bespoke contracts  MR report critical of PEA’s idea that capacity tied up under long-term contracts with generators should be transferred to the general pool as those contracts expire  Critique relies on speculation about profile of that capacity, i.e., that it is “profiled for a load with a strong summer peak”  But –Profiles are confidential –Surely there would be a winter peak, if any?

21 Lack of investment certainty  MR report asserts that PEA paper –Regards scarcity rents “as a regulatory issue and problem” –Misses point that “scarcity rents … have important roles to play”  But misunderstands PEA paper –Scarcity rents have an important economic role –PEA’s concern has been how to deal with those rents, given the price control of Vector

22 Transmission charges (1)  MR report argues CRF should be higher on northern pipeline than on other pipelines, because of the relative scarcity on the northern pipeline  This argument has merit

23 Transmission charges (2)  But tension between “second-best” regulatory pricing and forward-looking, “economic” pricing –Under PEA model, purpose of CRF is to recover sunk costs While scarcity pricing operates either through the primary market auction or secondary trading  If CRF on underutilized pipeline is lowered to below level required to recover sunk costs, to break even Vector would need to increase CRF on northern pipeline to above sunk cost levels, regardless of whether there is actually scarcity on that pipeline

24 Auction  MR report’s critique of PEA’s auction proposal is effectively that the proposed auction would not reconfigure property rights –In other words, MR report’s critique is effectively that PEA is proposing to stick with a point-to-point contract carriage regime

25 Interruptible capacity  MR report appears to have impression that the PEA does not see a role for the TSO to issue interruptible capacity –But not correct – PEA sees important role for formalisation of interruptible capacity

Contact Us James Mellsop Director NERA—Auckland © Copyright 2012 NERA Economic Consulting Limited All rights reserved.