Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.

Slides:



Advertisements
Similar presentations
1 Project X Proton Driver David Neuffer September 2011.
Advertisements

Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Project X: News & Strategy Steve Holmes Project X Working Group Meeting November 19, 2009.
Project X – MAP Task Force Keith Gollwitzer Accelerator Division Fermilab Project X Collaboration Meeting Oct 25, 2011.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Project X Update Steve Holmes SPAFOA Meeting November 13, 2012
Project X: Staging and Development Strategy Steve Holmes Fermilab PAC June 20, 2012.
Project X: Project Status Steve Holmes Project X Working Group Meeting December 15, 2011.
Greetings to Veljko from Fermilab December 9, 2010.
Project X: A Multi-MW Proton Source at Fermilab Jim Kerby for the Project X team HZB 22 February 2011.
Project X: Status, Strategy, Meeting Goals Steve Holmes SLAC Seminar May 19, 2011.
Project X: A multi-MW Proton Source at Fermilab Steve Holmes Extreme Beam Lecture Series June 11, 2009.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
F Project X Overview Dave McGinnis October 12, 2007.
Project X: A Multi-MW Proton Source at Fermilab Manfred Wendt & Steve Holmes SPL/ESS Collaboration Meeting Lund June 30, 2010.
Steve Holmes and Brendan Casey DPF Project X Forum August 10, 2011 Project X: A 5 MW Proton Accelerator Accelerator and Particle Physics.
Project X Overview L. Prost (for the Project X team) FNAL Accelerator Physics forum CERN June 17, 2013 Many slides taken from V. Lebedev, S. Nagaitsev,
Staging Opportunities for Project X Steve Holmes on behalf of the PX Team Accelerator Physics and Technology Seminar May 8, 2012.
High Power Proton Facilities Sergei Nagaitsev APS April 2015 meeting 11 April 2015.
An Integrated Intensity Frontier Strategy Steve Holmes & Bob Tschirhart LBNE Reconfiguration Workshop April 25, 2012.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
MegaWatt Proton Beams for Particle Physics at Fermilab Steve Holmes P5 Meeting/BNL December 16, 2013 projectx-docdb.fnal.gov/cgi-bin/ShowDocument?docid=1232.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Fermilab Perspective: Where are We Going with Project-X, and How Can it Benefit Nuclear Energy? Stuart Henderson PASI Meeting April 5, 2013.
Fermilab: Prospects and Plans Giorgio Apollinari Fermilab New Opportunities in Physics May 10-13, 2009.
Project X and the Future of the Fermilab Accelerator Complex Steve Holmes Accelerator Physics & Technology Seminar April 22, 2008.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Project X Update Steve Holmes Accelerator Advisory Committee Meeting November 7, 2011.
PIP-II: Goals, Strategy, and Status Paul Derwent 26 February, 2015.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Project X: Technology, Perspectives, and Applications Steve Holmes on behalf of the Project X Team IEEE-Nuclear Science Symposium Anaheim, CA November.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Project X goals and organization Sergei Nagaitsev October 4, 2011.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
Proton Source Reference Notes for mu2e at Fermilab 1 Section 1: Compilation of parameters describing the existing Fermilab accelerator complex and the.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Intensity Frontier Physics with a Mega-Watt Proton Source R. Tschirhart Fermilab Science & Technology Review November
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
PIP-II Overview: Goals, Status, Strategy Steve Holmes PIP-II Machine Advisory Committee 9-11 March 2015.
The High Intensity Horizon at Fermilab R. Tschirhart Fermi National Accelerator Laboratory IPAC 2012, New Orleans, USA. May 23 rd, 2012.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
Project X: Introduction, Strategy, and Collaboration Meeting Goals Steve Holmes Project X Collaboration Meeting September 11, 2009.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Project X Sergei Nagaitsev FNAL March 7, Project X collaboration Multi-institutional collaboration to execute the RD&D Program. –Organized as a.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
The High Intensity Horizon at Fermilab R. Tschirhart Fermi National Accelerator Laboratory IPAC 2012, New Orleans, USA. May 23 rd, 2012.
R. Tschirhart Fermilab NuFact Meeting William & Mary July 25 th 2012 The Project X Research Program: Muons.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
UK Neutrino Factory Conceptual Design
Fermilab Project-X Overview
Future Flavor Physics At Fermilab?
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Presentation transcript:

Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab

Strategic Context: Fermilab and the World Program The Tevatron has now ceded the energy frontier to LHC, following 25 years as the highest energy particle collider in the world. Fermilab operates the highest power long baseline neutrino beam in the world. but will face stiff competition from J-PARC To Soudan DNP Meeting, Nov. 2010, S. HolmesPage 2

Fermilab Strategic Plan The U.S. strategy for elementary particle physics over the coming decades has been developed by the DOE’s High Energy Physics Advisory Panel (HEPAP). Fermilab is fully aligned with this strategy.  The Fermilab strategy is to mount a world-leading program at the intensity frontier, while using this program as a bridge to an energy frontier facility beyond LHC in the longer term. DNP Meeting, Nov. 2010, S. Holmes3

Mission Project X, a multi-MW Proton Source, Project X, is the key element of Fermilab’s strategy for future development of the accelerator complex. A neutrino beam for long baseline neutrino oscillation experiments –2 MW proton source at GeV High intensity, low energy protons for kaon and muon based precision experiments –Operations simultaneous with the neutrino program A path toward a muon source for possible future Neutrino Factory and/or a Muon Collider –Requires ~4 MW at ~5-15 GeV. Possible non-HEP missions under consideration –Nuclear physics and nuclear energy applications DNP Meeting, Nov. 2010, S. Holmes4

Reference Design 3 GeV CW linac; 1 mA average beam current –Flexible provision for beam requirements supporting multiple users –Looking at options for <2 GeV to nuclear programs 3-8 GeV acceleration via a (1.3 GHz) superconducting pulsed linac Existing Recycler/Main Injector support the neutrino program DNP Meeting, Nov. 2010, S. Holmes5

Initial Configuration-2 Performance Goals DNP Meeting, Nov. 2010, S. Holmes Linac Particle TypeH - /protons(?) Beam Kinetic Energy3.0GeV Average Beam Current1mA Linac pulse rateCW Beam Power3000kW Beam Power to 3 GeV program2870kW Pulsed Linac Particle TypeH - Beam Kinetic Energy8.0GeV Peak Beam Current1mA Pulse rate10Hz Pulse Width4.3msec Cycles to fill MI6 Particles per cycle2.6  Main Injector/Recycler Beam Kinetic Energy (maximum)120GeV Cycle time (60 GeV/120 GeV)0.75/1.33sec Particles per cycle1.6  Beam Power at 60/120 GeV>2000kW Page 6 simultaneous

Reference Design Provisional Siting DNP Meeting, Nov. 2010, S. Holmes7

Nuclear Physics Facility Working groups established to outline experimental needs in five areas, including nuclear physics. 5th.html Concept under development for a possible Nuclear Physics experimental facility includes: –An ISOL module for production of short lived radioactive isotopes Based on 1-3 GeV/1 MW CW proton beam Low energy beam line for delivery of specific high Z, short and long lived, radioactive isotopes ( 225 Ra and 221 Fr) A research area containing instruments for trapping ions to ions per second –A second target station for materials irradiation and isotope production, General purpose facility for nuclear medicine and engineering studies of materials under intense irradiation conditions Production of longer lived isotopes for EDM experiments. 8DNP Meeting, Nov. 2010, S. Holmes

Collaboration Plan A multi-institutional collaboration has been established to execute the Project X RD&D Program. –Organized as a “national project with international participation”. Fermilab as lead laboratory International participation via in-kind contributions, established through bi-lateral MOUs. Collaborators assume responsibility for components and sub-system design, development, estimating, and potentially construction. –Collaboration MOU signatories: ANLORNL/SNSBARC/Mumbai BNLMSUIUAC/Delhi CornellTJNAFRRCAT/Indore FermilabSLAC VECC/Kolkata LBNLILC/ART DNP Meeting, Nov. 2010, S. Holmes9

Strategy/Timeline Balance of 2010: Complete all preliminary design, configuration, and cost range documentation for CD-0  Department of Energy briefing on November Continue conceptual development on outstanding technical questions –Baseline concept for the chopper –Concept for marrying the 3-8 GeV pulsed linac to CW front end –Injection into the Recycler –srf development at all relevant frequencies The DOE has advised that the earliest possible construction start is FY2015 –We are receiving very significant R&D support for Project X and SRF development (~$40M in FY11, not including ARRA (stimulus)) Planning for a five year construction schedule  Project X could be up and running in ~2020 DNP Meeting, Nov. 2010, S. Holmes10

Summary Project X is central to Fermilab’s strategy for development of the accelerator complex over the coming decade –World leading programs in neutrinos and rare processes; –Potential applications beyond elementary particle physics; Nuclear physics and nuclear energy applications –Aligned with ILC and Muon Accelerators Project X design concept is well developed and well aligned with the requirements of the physics program: –3 GeV CW linac operating at 1 mA: 3 MW beam power –3-8 GeV pulsed linac injecting into the Recycler/Main Injector complex We are expecting CD-0 for Project X in early 2011 Project X could be constructed over the period ~2015 – DNP Meeting, Nov. 2010, S. Holmes11

Backup Slides DNP Meeting, Nov. 2010, S. HolmesPage 12

Mission Physics Requirements DNP Meeting, Nov. 2010, S. HolmesPage 13 Proton Energy (kinetic) Beam PowerBeam Timing Rare Muon decays 2-3 GeV >500 kW 1 kHz – 160 MHz (g-2) measurement 8 GeV kW Hz. Rare Kaon decays 2.6 – 4 GeV >500 kW 20 – 160 MHz. (<50 psec pings) Precision K 0 studies 2.6 – 3 GeV > 100  A (internal target) 20 – 160 MHz. (<50 psec pings) Neutron and exotic nuclei EDMs GeV >500 kW > 100 Hz

1  sec period at 3 GeV mu2e pulse (9e7) MHz, 100 nsec400 kW Kaon pulse (9e7) 27 MHz800 kW Other pulse (9e7) 27 MHz800 kW Initial Configuration-2 Operating Scenario DNP Meeting, Nov. 2010, S. Holmes Page 14 Separation scheme

CW Linac Technologies DNP Meeting, Nov. 2010, S. Holmes15  =0.11  =0.22  =0.4  =0.61  = MHz SSR MeV  = GHz Elliptical 2-3 GeV 650 MHz Elliptical GeV SectionFreqEnergy (MeV)Cav/mag/CMType SSR0 (  G =0.11) /26/1SSR, solenoid SSR1 (  G =0.22) /18/ 2SSR, solenoid SSR2 (  G =0.4) /22/4SSR, solenoid LB 650 (  G =0.61) /42/75-cell elliptical, doublet HB 650 (  G =0.9) /24/125-cell elliptical, doublet ILC 1.3 (  G =1.0) /9 /99-cell elliptical, quad