ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.

Slides:



Advertisements
Similar presentations
Retail Market Subcommittee Update to TAC Kathy Scott January 28,
Advertisements

Outage Coordination Process and New Equipment 1. Introduction This presentation is intended to increase knowledge of outage coordination and NOMCR submittal.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
Texas Regional Entity Compliance Report TAC July 9, 2009.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
K E M A, I N C. TCA/KEMA ERCOT Cost Benefit Analysis Implementation Impacts Assessment KEMA Assumptions ERCOT CBCG June 2, 2004.
Retail Market Subcommittee Update to TAC Kathy Scott April 24,
814_20 – Substation ID updates Background and Proposed Action Plan TX SET – 10/25/07.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Flight V1.4F2 TTPT Update to RMS May 1. Participants of Flight V1.4F2 5 CRs 3 New CRs Andeler Constellation UBS Warburg 2 Existing CRs Electric America.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
ERCOT Nodal Readiness Plan Trip Doggett TAC Special Meeting September 7, 2005.
Network Model Management System (NMMS)
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Long Term Move-In Move-Out Development Strategy August 19, 2002 DRAFT.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
July 7, 2008 TPTF Texas Nodal Market Implementation: Metrics Revisions Jerry Sullivan.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
RMGRR058 Overview RMS Meeting – August 15, Background / Reference PUCT Substantive Rule 25.43(n)(8) Protocol Customer Billing Contact.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
Special Language Characters in EDI Transactions Options and Considerations July 20, 2016.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Retail Market Subcommittee Update to COPS Kathy Scott January 14,
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
NMT – Network Operations Modeling & Telemetry - Project
Protocol Revision Subcommittee
Texas Nodal Market Go-Live Procedure
PLWG Review 6.9 and the Interconnection process
August 25, 2016 TAC Update to COPS
Profiling Working Group
Change Control Overview for the State Technology Resource Center
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
June 7, 2016 Retail Market Subcommittee Update to COPS
2011 Prioritization Update to Market Subcommittees
MARS Taskforce RMS Update December 9, 2009.
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
March 1, 2016 Retail Market Subcommittee Update to TAC
Stacking Implementation Plan
Modifications to Planning Charter
IBC Review Pathway Approximate Timeline Online status Online“Sub”State
OFFICE OF THE CITY CLERK SEPTEMBER 22, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING.
ETS – Air Data submission Training
Time-Based Management of Large Scale Network Models
Presentation transcript:

ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline for comments was 8/4. – Comments received from Oncor, AEP, Luminant, Tenaska, CPS, TNMP, LCRA, and CNP – Roughly half of the comments were incorporated in ME4.0 – All comments were addressed in written form and returned to NDSWG 8/17 Joint NDSWG/NATF meeting ME4.0 and the ERCOT responses were discussed 7 modifications to ME4.0 were requested as a result to of the 8/17 meeting ME5.0 contains those 7 modifications

1. All – Language to be included that ERCOT will consult before an Interim update is rejected. New – Language p. 9: ERCOT will consult with data submitters to reschedule or modify all interim updates that cannot be implemented as submitted. In some cases in may be necessary for data submitters to modify some part of the interim update. Rejection of the interim update will be considered a last step and be used only if other coordination efforts fail.

2. AEP – clarification on retirements corresponding to model loads – will they be processed New – Language p22: The field-retirement date should precede the model- retirement date. In addition, the model-retirement date should be associated with a Scheduled or Supplemental model load date. If a TSP mistakenly enters a model- retirement date for an existing piece of equipment that does not match a model load date, ERCOT will contact the data submitter with a suggested correction. Without the correction that piece of equipment may not be included in that model (models are back-loaded with data).

3. All – 12PM vs 12AM clarification New – Language p. 14: Scheduled Model Load Time-of-Day Scheduled Model loads will normally occur at 12:00 AM (0000) on Tuesday, Wednesday or Thursday. The day of the week for first-of-the-month loads will vary. All Scheduled Model loads will occur at 12:00 AM (0000) on the scheduled date for the load

4. All – add cross reference for types of updates not subject to interim rules New – Language p. 7: Interim Updates ERCOT expects requests to modify the Network Model to meet the Protocol timelines for Network Model changes. NOMCRs that are submitted outside of the normal timelines will be classified as Interim Updates and included in the Network Model if they are needed to correct unintentional modeling inconsistencies, are required for system restoration after a storm, are a correction to previously submitted impedances or ratings. Interim Updates will be reported to the Public Utility Commission of Texas (PUCT) Staff and the Independent Market Monitor (IMM). Per Nodal Protocols, Interim Updates will be incorporated in the Network Model at the discretion of ERCOT. Many considerations will be made in determining the overall impact of the Interim update to the Network Operations model. ERCOT has outlined a guideline that will be applied to every requested interim update to consistently assess a level of risk and raise transparency to criteria by which interim updates are evaluated. ERCOT will also critically evaluate other risk items such as system conditions, staffing, volume of requested changes, potential Protocol obligations, etc. prior to determining if the interim update will be accepted. Section II.B.2 contains information about data submissions not subject to Interim Updates.

5. All – Any changes to the ME paper will be vetted with ROS New – Language p. 6: Overview ERCOT Protocols broadly delineate modeling requirements for different segments of the ERCOT market. The information in this document is intended to more clearly define the expectations ERCOT has for market participants as they help to maintain the accuracy of the ERCOT Network Operations Model through the submission of model and outage data. Modifications to this document by ERCOT will be documented and discussed with NDSWG prior to being finalized or implemented in ERCOT business processes.

6. Oncor – Modify 48-hour rule for dynamic ratings New – Language p. 9: Dynamic rating changes for new and existing lines TSPs and REs will be able to dynamically rate a statically rated line or adjust previously submitted dynamic ratings in production within 48 hours. ERCOT is given 24-hours to accept or reject the dynamic rating change request and then another 24-hours to implement the change into production. Model changes that dynamically rate lines will not be subject to Interim Update status.

7. Oncor – Interim Update table is not all-inclusive New – Language p 36: This table is not meant to represent all instances of interim updates.