The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.

Slides:



Advertisements
Similar presentations
Signing LOI for ILD detector concept at ILC Deadline LOI submits march 31st 2009.
Advertisements

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Systems Engineering Management
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Optimizing the SiD Detector - mainly a calorimeter perspective Andy White SiD Advisory May 5, 2008.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
M. Oreglia, ALCPG07, 23 Oct 2007Slide 1 (of 1) Introduction to SiD; Preparing for a LOI Quick overview of SiD Charge to SiD speakers Substance of.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
SiD Snowmass 05 Jaros1 Optimizing SiD getting from here….……………….to there SiD Concept/Snowmass August 16, 2005 John Jaros.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Status Report – CEOS-CGMS Working Group on Climate Presented to CGMS-43 Plenary session, agenda item G.1.
Updating the Regulation for the JINR Programme Advisory Committees
Working in Groups in Canvas
Oct 22 Group Leaders Planning meeting
Physics Analysis Summaries towards a proposal
PDAP Junji Haba, KEK.
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
The SiD Detector Outline Overview
The DBD: Outline and Scope
Roadmap to Enhanced Technical Regulations of WMO
APPA – Term 3 Breakfast Session
Loyola’s Performance Management Process For Employees
Strategic Plan Implementation July 18, 2018
Loyola’s Performance Management Process For Employees
The Silicon Detector Design Study European Kickoff Meeting
Presentation transcript:

The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros

The Detector Roadmap … as proposed by WWS at LCWS07 A call for LOIs by ILCSC this summer, due summer 2008 These LOIs will provide a description of the proposed detector and its performance, and will note the intent of those planning to collaborate on developing the EDR. LOIs will be reviewed by the IDAG, an International Detector Advisory Group of experts chosen by ILCSC. IDAG will facilitate the definition of two, complementary and contrasting detector designs, and report the result to ILCSC. The result of this process should be two proto-collaborations operating by the beginning of 2009 to produce EDR documents by end …as planned by the ILCSC at LCWS07 Issue Call for Detector LOIs summer Search for and appoint a Research Director, to oversee the experimental program for the ILC, coordinate reviews of the LOIs, facilitate the selection of two, complementary detector designs, help generate support for the two detector EDRs, and monitor EDR development. …

Calling for LOIs signals a Phase Change for the Detector Concepts. Detector “Design Studies” are becoming “Detector Collaborations.” Calling for LOIs also sends signals to the ILC Detector R&D Community. Now’s the time to align with a detector concept, participate in the optimization process, and contribute to the LOIs. Four goes to Two. The four ILC detector concepts, plus any that emerge within the next year, must eventually contract to two, suitable for full engineering design. Spontaneous Coalescence (e.g., LDC and GLD) Induced Coalescence? Shotgun Marriage? Roadmap Implications

Roadmap Update ILCSC met again at LP07 in Daegu: Nominated a Research Director. Official acceptance expected this month. Accepted Notion of LOI and IDAG. Details to be worked out with RD. Will run these developments past FALC Expectation: RD will issue call for LOIs this month. Guess that LOIs will be due ~9/08

Definition of Letter of Intent to express an interest to design and engineer a detector at the International Linear Collider Version The purpose of this document is to define more precisely the letters of intent (LOI) for detectors at the ILC. With the LOI a group expresses its interest to develop a design for a detector at the ILC. LOIs will form the basis on which two groups will be invited to further develop and detail its plans and eventually submit an engineering design report, EDR. The LOI should contain information on the proposed detector, its overall philosophy, its subdetectors, and how this will work to address the ILC physics questions. The evaluation of the detector performance should be based on a list of agreed upon benchmarks, which will be the same for all LOIs. It should contain a discussion of integration issues with the machine. It should be developed enough to allow a first preliminary assessment of civil engineering issues like interaction hall, support halls etc. It should enable the reader to judge the potential of the detector concept and to identify the state of technological developments for the different components. Alternative technological options should be elaborated. Where needed, areas of further research and development should be identified, together with timelines and milestones. The group submitting the LOI should define its position and role in the ongoing international research and development for a detector at the ILC. The LOI should include a preliminary cost estimate. The overall length of the LOI should not exceed 100 pages. The LOI can, but need not, refer to other documents where more technical details are given. If so these documents should be submitted together with the LOI. In addition to a concise technical description of the proposed detector the LOI should present the structure of the group which is proposing the detector. The resource needs and their evolution in time should be presented, along with a plan to mobilize these resources. The LOI will not represent any formal commitment of the groups signing it to the project or the proposed detector. It should however enable the reader to judge the capacity and the seriousness of the groups to carry out the work until the EDR. Input from WWS Will the RD Change?

SiD’s Goals for LOI Optimize the global parameters already. Prove the concept. This has been our goal from the start; time to complete it. Detail and Integrate the Subsystem Designs. Specify all parameters, flesh out the designs, evaluate the costs, choose the subsystem technologies. Benchmark SiD’s Performance. Simulate a Realistic Detector. Benchmark it’s performance subsystem by subsystem. Benchmark its integrated physics performance. Engage new collaborators. Lots to do for the LOI. Need to strengthen SiD Collaboration.Help is needed and designs are in flux. A good time to join and a good time to contribute.

Draft Milestones/Schedule … working backwards 9/08 Submit LOI 8/08 Finalize results; finalize edits; finalize authorlist 7/08 Complete LOI Draft. Collaboration reviews and comments. 4/08 GEANT4 Description Ready Benchmarking & Performance Studies ready 3/08 Detector Design Frozen Subsystems fully specified; technologies (and alternates) chosen; conceptual engineering designs done. 1/08 Freeze Global Parameters. First pass detector design. 12/07 First pass global parameters and calorimeter choices 10/07 Subsystem Plans in Place How to accomplish the above

Milestones/Schedule comments Top priority: Define SiD Global Parameters with PFA. Physics benchmarking and Subsystem performance studies must get started now, on present SiD MC, to be ready for the optimized detector MC next spring. SiD needs a working PFA. Real Challenges for each subsystem: fully specified, realistic detectors.

Work(shop)ing toward LOI draft ILC/LHC-SLAC ~1/18/08 SiD WS-Oxford/RAL ~3/20/08 SiD WS-KEK?Tokyo? ~7/08 We need opportunities to discuss and debate the design choices before us.

LOI Editors International team has agreed to serve as editors for the SiD LOI: Hiro Aihara Phil Burrows Mark Oreglia Thank you! Put us to work!