Options for Possible Sector Test Mike Lamont. LHC sector test2 4-3-2008.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
Injection test? Mike Lamont For initial discussion.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
LHC Sector Test1 LHC Sector Test - Beam IntroductionMike LamontIntroductionMike Lamont Proposed tests with beamBrennan GoddardProposed tests with.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC Sector Test 1 Roger Bailey, Helmut Burkhardt, Paul Collier, Brennan Goddard, Stephen Jackson, Lars Jensen, Rhodri Jones, Verena Kain, Alex.
LHC Sector Test Mike Lamont. LHC sector test - MAC June /6/2007 Outline Overview Motivation Pre-requisites/preparation Tests with beam Organisation.
Schedule IT General Schedule 9 th, September 09 Today.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Running scenario 2009/10 Run through components – and then synthesis.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Transfer Line Test preparation meeting V. Kain, R. Alemany.
LHC sector test - summary 1 14/03/2008 Possible injection into part of the machine Options etc.Mike Lamont Stopping the beamStefano Redaelli Proposed Tests.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Aperture measurements during LHC commissioning 2017
Luminosity monitor and LHC operation
DRY RUNS 2015 Status and program of the Dry Runs in 2015
LHC Commissioning with Beam
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Minimum Hardware Commissioning – Disclaimer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Introduction: FCC beam dumping system
MPI-ATL Calor Meeting 7-Sep-2009 H. Oberlack MPI für Physik, Munich
LHC schedule.
The LHC - Status Is COLD Is almost fully commissioned
Automatic Generation of the Radiation Level Weekly Reports Update 18
Summary of week 7 Hardware Commissioning:
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
Monday 11/07: Recovery Plenty of accesses.
Machine plans - Alignment workshop
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Commissioning Phases
Machine availability reaching well over 80%
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Remote setting of LHC BLM thresholds?
Alice solenoid – orbit distortion
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
LHC Injection and Dump Protection
Week 35 – Technical Stop and Restart
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
LHC Beam Operations Past, Present and Future
Collimation margins and *
HL-LHC operations with LHCb at high luminosity
450 GeV Preliminary Commissioning: Measurement Programme
Machine plans - CMS startup workshop
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Chamonix Workshop XIV CERN - 17th-21st January 2005
LHC status & 2009/2010 operations
Collimators: Operations - Baseline Assumptions
Luminosity and time estimates
The LHC Beam Interlock System
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Beam commissioning plans, 2007 and 2008
Daniel, Gianluca and Belen (for the Collimator team)
What systems request a beam dump? And when do we need them?
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Options for Possible Sector Test Mike Lamont

LHC sector test

LHC sector test

LHC sector test

LHC sector test Outline Motivation Options  Space & Time Access Pre-requisites Cold checkout Impact Schedule Conclusions

LHC sector test Baseline 1 week with beam Pilot Beam for the most part:  single bunch of x 10 9 protons Total intensity:  x protons

LHC sector test Motivation Beam tests form a integral part of full beam commissioning This has got to be done anyway  but gives lead time for problem resolution, improvements etc. Beam:  Polarity of magnetic elements  Aperture in the cold machine  Response of key beam instrumentation  Magnet field quality Very Visible Milestone

LHC sector test Integration Full test of a majority of subsystems over more than one eighth of the ring Allows staged approach to the full problem space Time to fully resolve problems before the real thing  Analysis, improvements, resolution, adjustment The lessons learnt will reduce the time needed for full commissioning Breathing space if there are any serious problem (less true now perhaps)

LHC sector test Integration & commission with beam: Full-blown system wide integration test

LHC sector test Option 1 layout

LHC sector test Option 1: Injection R8 – A78 – R7 No temporary dump to be installed at IR7 - use collimators instead (3 primaries, 5 secondaries for the single beam). No temporary installation of beam instrumentation at IR7. Need small part of 8-1, all 7-8 hardware commissioned to 450 GeV+. Minimal Impact Solution

LHC sector test Option 1: Pros and Cons Minimal requirements on Cryogenics & HWC  2 sectors Less area classified by RP Less impact on other systems  BI, LBDS Only one sector test - less systems tested  BI, LBDS, collimators missed BI configuration not perfect  Rely on in situ instrumentation  Not ideal – no BCT – some implications for measurements

LHC sector test Option 2

LHC sector test Option 2: Injection R8 – A78 – A67 – Dump Use TCDQ and TCS to block down stream aperture – safeguard only - no installation of temporary dump. RP approval/study required Beam onto TDE Can use correctors to steer into dump channel - so should be able to guarantee very little beam goes onto TCDQ etc. Rely on in situ instrumentation (BCT in dump line etc.). No temporary installation required. Need small part of 8-1, all 7-8, all 6-7 hardware commissioned to 450 GeV+.

LHC sector test Option 2: Pros & Cons Test beam dump and related systems Don't irradiate ring - beam onto TDE (beam dump block) Check IR7 optics, performance of warm magnets Beam through 3 IRs, 2 full sectors Full suite of Beam Instrumentation in place  FBCT, Screens, BLMs Support required for 3 cold sectors cold while work in progress elsewhere in ring - clearly test has more of an impact. Favoured Solution

LHC sector test Option 3 – Injection point 2 Outside possibility – would imply problems elsewhere Need partial 1-2, complete 2-3 Dump on collimators in IR3

LHC sector test Tests

LHC sector test Access – closing the whole ring Pre-preparation, DSO tests  2 months Closing the ring: patrols etc  3-4 days Experiments out for a week  “a disturbance but acceptable” Access during test possible  to areas that don’t see beam Supervised areas after test  Given analysis, and measurements during and after the test, it is envisaged that: Certain areas might be declared controlled areas for the first few days after the test; Thereafter these areas would join the rest of the sectors involved as supervised areas

LHC sector test Monitoring Radiation monitoring  RAMSES operational  LHCb: 4-5 monitors planned under RAMSES Beam Loss Monitors  Sensitive to losses at 1% level with pilot bunch intensity Beam Intensities  Beam extracted, injected (and to dump) to be logged RPG survey after the event and perhaps during the test to ensure that activation remains low.  Careful survey afterwards planned after the test near the injection dump and dump itself.

LHC sector test BIC 3/16 of LHC Beam Interlock System SPS Extr. Kicker BIC SPS Extraction Lines Interlock System Radiation levels BLM Powering Interlock Warm Magnet Interlock Vacuum LHCb Access system will provide input to BIS which will inhibit SPS extraction. Configurable if the case of extraction required & LHC not ready (e.g. extraction tests) BIS

Required circuits Beam 2 Circuits only For limited recycling, it would be preferable for listed circuits to be available to, say, the equivalent 1-2 TeV level.

LHC sector test Injection RQ5.R8Q5 quadrupole RQ4.R8Q4 quadrupole RD2.R8D2 recombination dipole RD1.R8D1 recombination dipole

LHC sector test Triplets & LHCb RQX.R8Inner triplet RQX.L8Inner triplet RD1.L8D1 recombination dipole

LHC sector test LL5 & DS.L5 RQ7.L82*MQM RQ8.L8MQML RQ9.L8MQM MQMC RQ10.L8MQML RQTL11.L8B2MQTLI RQT12.L8B2MQT RQT13.L8B2MQT

LHC sector test A78 CircuitsNo. of circuitsPriority Main bendsMBRB.A7811 Main quadsMQRQF, RQD21 Skew quadsMQSRQS [B2]11 Trim quadsMQTRQTF,RQTD [B2]21 Orbit correctorsMCBRCB [B2]23 H & 24 V1 Lattice sextupolesMSRSF,RSD [B2]42 Lattice octupolesMOROD, ROF [B2]1- Skew sextupolesMSSRSS [B2]13 b3 spoolMCSRCS [B2]13 b4 spoolMCORCO [B2]1- b5 spoolMCDRCD [B2]1-

LHC sector test MR4 RQT13.R7B2QT RQT12.R7B2QT RQTL11.R7B2QTLI RQTL10.R7B2QTLI RQTL9.R7B2QTLI RQTL8.R7B2QTLI RQTL7.R7B2QTLI RQ6.R7B26* QTLH

LHC sector test

LHC sector test Other systems Injection elements: septa, kickers Collimators Machine Protection Beam Instrumentation:  BPMs, BLMs, BTV, BCT, BST Magnet Model Controls Software/tools Access system Radiation Protection Radiation Monitoring Optics, aperture model See Chamonix 2006 Test preparation largely orthogonal to HWC

LHC sector test Near test schedule Phase Time Sectors checkout, interlock & machine protection tests etc. T start - 2 weeks Close ring T start – 4 day Access tests & final qualification T start – 4 day Beam to end TI8 T start – 1 day Tests with beam 1 week Radiation survey T end + 1 day Establish supervised areas T end + 2 day

LHC sector test Injectors

LHC sector test

LHC sector test Impact Sector test makes clear demands on:  What is needed to be cold & commissioned and to what level  Fairly limited: Beam 2 Circuits & limited recycling,. Cryogenics, QPS, HWC support required during test  In general, low current levels with occasional cycles  Interesting possibility of quenches Access  Experiments - “acceptable”  HWC – NB that commissioning in other sectors can continue  Scheduled access possible (could imagine access/day if we can guaranteed a reasonable efficient recovery). LHCb

LHC sector test Conclusions A sector test would be a useful exercise and undoubtedly speed full commissioning with beam  most of it has to be done anyway Could provide a useful buffer if any major problems are discovered. The impact is not negligible, mainly because the whole ring has to be closed  This in itself is a very useful exercise  Machine as is or as will be. Work carries on elsewhere.  All major installation will have finished and access to the zones affected after the test will be limited. This is a back up - to be invoke if delays  3 months Need minimum lead time of some weeks for preparation

LHC sector test Thanks… MagnetsLuca Bottura Beam InstrumentationRhodri Jones, Lars Jensen, Stephen Jackson InjectionBrennan Goddard, Jan Uythoven Radiation ProtectionDoris Forkel-Wirth, Helmut Vincke INB Ghislain Roy AccessPierre Ninin LHCbRolf Linder HWCRoberto Saban & team Installation Katy Foraz PlanningEsther Barbero Soto VacuumPaul Cruikshank, Miguel Jimenez ControlsRobin Lauckner ++ OP/APRoger Bailey, Verena Kain, Massimo Giovannozzi, Stephane Fartoukh, Helmut Burkhardt, Alex Koshick, Stefano Raedelli, Ralph Assmann, Frank Zimmerman… and the rest of the commissioning team.

LHC sector test Chamonix 2006 Sector test with beam Overview, motivation and schedulingMike Lamont Proposed tests with beamBrennan Goddard Magnet quenches with beamAlex Koschik Beam InstrumentationLars Jensen Magnet requirementsLuca Bottura Controls requirementsRobin Lauckner Sector test preparationChair: Pierre Strubin PlanningEsther Barbero Soto Global Hardware StatusMiguel Jimenez Layout in LSS7Jan Uythoven Hardware CommissioningRoberto Saban State of LHCb for the testMassimiliano Ferro-Luzzi Radiation IssuesHelmut Vincke Access systemPierre Ninin

LHC sector test

Reserve slides

LHC sector test LHCb Worst case scenario: it is estimated that a total 3 x 1011 protons will be lost in the LHCb region during the whole test. The losses will be distributed over time. It has to be noticed that this number is quite pessimistic – under “normal” beam conditions the losses are more in the order of 1x10-4. The aperture in LHCb is large; the injection optics means relatively small beams in the inner triplet to the right of the experiment; the separation and crossing angle bumps will be off; there is therefore no reason to expect significant losses in this region. RP conclusion (H. Vincke) (Preliminary, based on extrapolations of presently available exemplary calculations): Dose rates: All 3 x 1011 protons will be lost in carbon surrounded by steel and copper (already existing calculation) at the last day of the 14 days of tests: maximum 13 uSv/h. The 3 x 1011 protons will be lost in one point after one week. After the cooling time of another week the maximum dose rate will be 2.8 uSv/h. This scenario can be considered as a more realistic approximation of continuous losses (at the same loss point) over two weeks. Assuming that the new French law on area classification will not become stricter than the present Swiss one: Non-designated area: < 2.5 uSv/h for temporary stay (0.5 uSv/h for permanent working places, i.e. assuming 2000 hours/year) This goal seems to be achievable, even under pessimistic assumptions. In case the dose rates will be higher (e.g. due to an incident), the area (around the loss point) will have to be classified as supervised area (radiation workers B in the worst case, but most probably VCT status (physicists and technicians from outside institutes will receive dosimeters without medical certificate) will be sufficient – to be checked).