PM Report CFS /Gbl 13.04.2011 ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.

Slides:



Advertisements
Similar presentations
SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Nick Walker Marc Ross Akira Yamamoto ALCPG’11 Eugene Oregon GDE Project Management Summary ALCPG Eugene, Nick Walker 1.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Project Management: Nick Walker Akira Yamamoto Marc Ross ILC AD&I: Introduction and Overview 02/12/2009.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
John Carwardine 13 th April, 2011 Report on the 9mA program.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
26-Sept-11 LCWS - Granada Global Design Effort 1 Barry Barish LCWS11 - Granada 26-Sept-11 Global Design Effort ILC R&D and Technical Design Grooved Insert.
AS Webex meeting – January 27, 2010
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Baseline Technical Review – Central Region Accelerator Systems
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Agenda items TEB activities at KILC TDR SVN repository roll-out
SCRF WebEx Monthly Meeting Agenda and Reports from PM
SCRF Monthly WebEx Meeting May 6, 2010
Conventional Facilities and Siting Global Group (ARCFS)
Oct 22 Group Leaders Planning meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Barry Barish LCWS10 - Beijing 26-March-10
SCRF Monthly WebEx Meeting Sept. 22, 2010
SCRF Monthly WebEx Meeting May, 6, 2011
SCRF Monthly WebEx Meeting Jan. 12, 2010
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Technical Design Report preparation
, A. Yamamoto SCRF WebEx Meeting.
CLIC/ILC Collaboration Meeting: Objectives & Organization
ILC Global Design Effort
Barry Barish GDE Caltech
Nick Walker (DESY) EU GDE Meeting Oxford
Barry Barish LCWS10 - Beijing 26-March-10
Nick Walker for the Project Management
Barry Barish JSPS - Sendai 12-Sept-11
ILC Cryogenics -- Technical Design Report Planning
Barry Barish Paris ICHEP 24-July-10
Session Introduction & Damping Rings Baseline Lattice Decision
ILC - Global Design Effort
Presentation transcript:

PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc on FLASH 9mA –Peter G. on costing (likely his last PAC report for GDE) Fixed TDR Baseline Review dates PM to meet with XFEL (28-29 April) Prep DR TDR Review INFN and Prep 9mA Workshop DESY (John) 13/04/2011 PM Report - CFS / Global webex 1

Request for information to SRF industries 12 each GDE Plan: 1) Receive initial responses before PAC review; 2) Provide a common forum for discussion (24 July Chicago, prior to SRF2011); 3) Develop the scope of cost estimate effort (to end 2011) Goal: Replace the RDR estimate – which was based on DESY / TESLA studies 13/04/2011 PM Report - CFS / Global webex 2

TDR Technical Baseline Reviews Dates and venues: Physics and Detector to be represented 13/04/2011 PM Report - CFS / Global webex 3

Planning for the TDP 2 * Technical Baseline Reviews You are here! Risk Mitigating R&D Re-Baseline (CC) AD&I (TLCC) AD&I (TBR*) TeV upgrade study Update VALUE estimate Tech. Risk Assessment PIP Write TDR report(s) ALCPG Eugene, Nick Walker 4

TDP Key Focus (beyond R&D) SCRF Cost mass production models global distribution CFS design & cost Design update Value engineering Baseline Design Final design decisions Documentation Cost estimate Highest Priority (new estimate) High Priority (updated estimate) RDR update Documentation (scaled estimate) CFS requirements critical input ALCPG Eugene, Nick Walker 5

TDR Prep Review Meeting Goals: Review the TDP R & D and summarize progress and plans. Review the system design –including a change control procedure so that key design changes can be discussed openly –The updated baseline will be used for the TDR plan and cost estimate. Review the system cost –For SCRF and CFS, additional meetings, parallel sessions etc are also required. Review system interface criteria; –for example, requirements to CFS Review supporting documents for inclusion in the EDMS Discuss TDR preparation plans. –Upon the completion of the review, we should be able to publish a plan for producing that part of the TDR; resources, milestones, etc The review to be accessible to the community 13/04/2011 PM Report - CFS / Global webex 6

Topics for System Design Review Review the TDP R & D and summarize progress and plans. Review the system design –including a change control procedure so that key design changes can be discussed openly Example topics: 1.Cavity pairing – Power Distribution System. 2.Marx modulator 3.RDR HLRF fallback 4.RTML RF design and civil design. 5.Tunnel diameters 6.Power dissipation in the tunnel 7.DRFS components 8.Optimization of Positron production parameters: 1.undulator length and field; 2.polarization collimator space 13/04/2011 PM Report - CFS / Global webex 7

CFS – DR Review Preparation CFS should meet with AS groups via webex, starting May 2011, and process the list of questions –(should have no new questions at Baseline Review) –Started ALCPG11 –See questions from Emil for e+ (posted) –shown June in DR TDP-II schedule Tuesday weekly meeting topic? 13/04/2011 PM Report - CFS / Global webex 8

DR TDP-II Schedule 4/1/2011 AD&I Meeting Global Design Effort 9

DR Agenda Thursday, July 7 Morning Session Introduction DR Parameter Specifications Baseline Lattice Choice TDP R&D Progress/Plans Afternoon Session Interfaces to Adjacent Area Systems Layout & CFS Interface Friday, July 8 Morning Session Documentation Costing Afternoon Session TDP-II Schedule Review Closeout EDMS Session 4/1/2011 AD&I Meeting Global Design Effort 10

13/04/2011 PM Report - CFS / Global webex 11 1) We should produce a written, prioritized, list of specific topics for discussion –DR TAG and the PM (AND CFS) –to be merged –timing constraint concerns 2) 'final' all-system review where interfaces and dependencies are discussed. 3) term: 'WBS' in AD&I and ALCPG to refers the outline structure to be used for organizing documents in EDMS. 4) We will devote the 25 May ADI meeting to the 1 Tev upgrade. AD I notes –

Global Sys. SRF Review Prep How will we meet the ‘S2’ goals set forth in the S2 RDB report, generally, and in the RD Plan? we will not be able to do it all – but what are the problems and limits?: –Cavity detuning measurement –Cavity gradient – what do we miss with only limited high grad cavities? (note SNS gradient limits ~<20 MV/m) –Beam current – what do we miss by having ½ nominal 9 mA? –LDF compensation performance –Q_l adjustment control –Tuner reliability 13/04/2011 PM Report - CFS / Global webex 12

Global Sys. SRF Review Prep (2) What should we plan to do at FLASH in 2011/12? –Other test facilities? Dark current interaction with linac operation Workshop – June 2011… Review – January 2012 –how do 9mA tests define the new baseline? –Given our experience with FLASH - what are the implications for upcoming baseline technical choices? –mainly in support of the cryomodule gradient operation spec: –  reaffirm the CM Specification determined at BAW-1 13/04/2011 PM Report - CFS / Global webex 13