CALICE Collaboration Meeting Sept. 2008 Roman Pöschl LAL Orsay - Data Collected with the Ecal - Ecal in July running - Collected Data and Glimpse on Quality.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
1 AHCAL answers IDAG Erika Garutti On behalf of AHCAL analysis team.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Interactions of hadrons in the SiW ECAL (CAN-025) Philippe Doublet - LAL Roman Pöschl, François Richard - LAL CALICE Meeting at Casablanca, September 22nd.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
More on Testbeam Analysis FLZ. Stability Checks for TCMT Pedestal stability already shown by Kurt MIP calibration stability Response stability.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Interactions of pions in the Si-W ECAL prototype Towards a paper Naomi van der Kolk.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Interactions of hadrons in the SiW ECAL Towards paper Naomi van der Kolk.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Interactions of hadrons in the SiW ECAL (CAN-025) Philippe Doublet - LAL Roman Pöschl, François Richard - LAL SiW ECAL Meeting at LLR, February 8th 2011.
Régis Lefèvre (LPC Clermont-Ferrand - France)ATLAS Physics Workshop - Lund - September 2001 In situ jet energy calibration General considerations The different.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Interactions of pions in the Si-W ECAL prototype Towards a paper Naomi van der Kolk.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
1 Calice Analysis 21/7/08David Ward Quick look at 2008 e - data; low energy hits in 2006  2008 e - data from Fermilab; July’08  Looked at several runs.
Sohail Amjad, Roman Pöschl LAL Orsay Guard ring studies for SiW Ecal of ILD CALICE Collaboration Meeting Cambridge/UK Sept
Roman Pöschl LAL Orsay CALICE Ecal Meeting 3/6/08 - Installation Period - Beamline at FNAL - Overview on Data taken - Outlook on July Running Overview.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay ACFA/GDE Wordshop – TILC '08 Sendai Japan - Mar
SOCLE Meeting Dec Roman Pöschl LAL Orsay - Publications - Data taking at FNAL - Collected Data and Glimpse on Quality - EUDET Prototype - Summary.
Beam test of Silicon-Tungsten Calorimeter Prototype
Online Monitoring : Detector and Performance check
the CALICE test beam set-up and running experience
Status of Ecal(s) for ILD
Interactions of hadrons in the Si-W ECAL
Testbeam Timing Issues.
Calice Collaboration Meeting Sep. 2009
HCAL Commissioning and Related Activities
Detector Configuration for Simulation (i)
ScECAL+AHCAL+TCMT Combined Beam FNAL
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Installation and Run Plan
Commissioning of the ALICE-PHOS trigger
Rick Salcido Northern Illinois University For CALICE Collaboration
SOS Cerenkov Purpose: provide PID for NA Cerenkov efficiency studies
Michele Faucci Giannelli
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay - Data Collected with the Ecal - Ecal in July running - Collected Data and Glimpse on Quality - Summary and Conclusion SiW Ecal Performance in FNAL Testbeam May/July Running CALICE Collaboration Meeting Manchester/UK Sept Disclaimer: I will concentrate on the July Running For May Running see Most of the work was made by Hengne Li

CALICE Collaboration Meeting Sept The Ecal in the Testbeam......simply great.... Detector in testbeam(s) since 2005 A big 'thank you' to all the people involved in the project let's plunge into the details

CALICE Collaboration Meeting Sept Ecal FNAL Hengne Li

CALICE Collaboration Meeting Sept Sketch of the beamline A.Kaplan, H.Li

CALICE Collaboration Meeting Sept SiW Ecal in FNAL Beamline Ecal ready to take data by 25 th of April as all the other CALICE Equipment

CALICE Collaboration Meeting Sept SiW Ecal FNAL Picture courtesy of I. Polak

CALICE Collaboration Meeting Sept “Luminosity” - Recorded Data Total: 17.3 kEvens in beamData Runs~20% Calibration Data, i.e. muons ~25% with Fast Trigger (mostly e-) May July Physics Calibration Fast Calibration Slow All data recorded with Ecal on

CALICE Collaboration Meeting Sept Issues of Ecal Running during July - Extensive 'repair' work beginning of July (P. Cornebise LAL) Proper common ground Isolation of Detector from Chassis Still looks as if the power connectors - (More or less) Quiet Running during 'Fast Trigger' data taking and initial Slow Trigger Data Taking -> Figure - Noisy Layers/Pedestal Shifts back with us as we started the shifted program -> Figure - Hot whether at FNAL lead Ecal Currents in Bias Voltage Supply Chain to increase beyond 250  A Ecal is expensive thermometer Gradient ~10  A/degC No impact on Ecal Noise observed, steady monitoring with emcNoise runs Night running clearly enhances the efficiency of Ecal - Ecal shipped back to Europe for repair work Dead Cells in bottom part

CALICE Collaboration Meeting Sept Impressions from the Ecal Running I Ecal Noise largely tamed No noisy layers for > 90% of time Suggest to prepare data analysis such that Events with Ped. Shifts are simply rejected not corrected

CALICE Collaboration Meeting Sept Impressions from the Ecal Running II

CALICE Collaboration Meeting Sept Runs with Fast Trigger - “Ecal Program”

CALICE Collaboration Meeting Sept General Remarks on DQ Ecal spectrum  e- 2e- -- - Large  contamination - Multiparticle events (e.g. up to 5  's) - Where Cerenkov is missing Ecal can be used to separate particles Hengne Li, LAL

CALICE Collaboration Meeting Sept Hengne Li, LAL

CALICE Collaboration Meeting Sept Hengne Li, LAL

CALICE Collaboration Meeting Sept Hengne Li, LAL

CALICE Collaboration Meeting Sept Hit Maps... Marcel Reinhard, LLR Dead Cells in bottom layers – Main reason for repatriation of Ecal

CALICE Collaboration Meeting Sept First Steps towards Calibration (“Fast Trigger” Mode) Central Slabs Bottom Left Slabs Bottom Right Slabs Dependency on Production series number Hengne Li, LAL

CALICE Collaboration Meeting Sept Running at Different Hold Values Have to take data at “non”-optimal hold position due to delay of Cerenkov Signal - Larger MIP value when running “on-hold- peak”, as expected - Noise 20% larger when running “off-hold-peak” very large effect, not understood (expect ~1%) Analysis of Muon Runs Hengne Li, LAL Example

CALICE Collaboration Meeting Sept Summary and Conclusion - Successful data taking with SiW Ecal at FNAL 17.3 Mio. Triggers recorded with Ecal - No Pedestal Shifts for a large fraction of the data - Calibration for 2008 is on its way - Hold Story needs to be understood Valuable Reference sample at “optimal” hold value “Fast Trigger” Running - Ecal shipped back to Europe for maintenance/repair work Grounding and Connector Issues Dead (?) Cells in Lower Slabs - (Getting) Ready for Data Taking with the DHCAL

CALICE Collaboration Meeting Sept Backup Slides

CALICE Collaboration Meeting Sept Breakdown of recorded data I – Slow Trigger E/GeV kEvents E/GeV kEvents Mainly during commissioning phase kEvents E/GeV Managed to accumulate hadron data at both polarities Significant larger sample at negative polarities

CALICE Collaboration Meeting Sept Breakdown of recorded data II – Slow Trigger/”Special” Data E/GeV kEvents E/GeV kEvents Mainly commissioning run kEvents E/GeV Rotation program suffered most from significant beam down time Still, considerable amount of data collected To this adds a shifted detector program with total ~500k Triggers at 10 and 30 GeV and high energy proton running 160k Events

CALICE Collaboration Meeting Sept Breakdown of recorded data III – Fast Trigger E/GeV kEvents E/GeV kEvents Mainly during commissioning phase Considerable samples at small energies with fully equipped Ecal Pion content increases gradually with increasing energy