Lucie Linssen, CLICdp meeting, June 2 2015 1 CLICdp welcome + news from CLIC staging baseline.

Slides:



Advertisements
Similar presentations
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Advertisements

CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
CLIC Staged Design October 2012 D. Schulte for the CLIC collaboration.
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
Proposed machine parameters Andrei Seryi July 23, 2010.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Introduction / CLICdp news (CLICdp - CLIC detector and physics) -- CLICdp meeting at AWLC14, 13 May Konrad Elsener, CLICdp session, AWLC14 1 Konrad.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
News, plans, wrap-up -- CLIC workshop, Febr. 5 th Lucie Linssen, CLICdp, wrap-up, February 5th Lucie Linssen.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
CLICdp news -- CLICdp 2-day meeting June 10 th Lucie Linssen, CLICdp, 2-day meeting, June 10th
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
News from the executive team CLIC detector and physics IB meeting June 11 th 2013 Lucie Linssen L. Linssen, CLICdp IB meeting, June 11th Last week’s.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Rebaselining Progress D. Schulte for the CLIC rebaselining team Davide Aguglia, Roberto Corsini, Steffen Doebert, Konrad Elsener, Alexej Grudiev, Erk Jensen,
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Lucie Linssen, CLICdp, bi-monthly meeting, 3 Aug General news CLICdp monthly meeting August 3 rd 2015.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
CLICdp, introduction and general news Lucie Linssen, CERN CLIC workshop, January 27 th e + e -  ttH  WbWbH  qqb τνb 1.4 TeV.
Questions from the CLIC accelerator team (D. Schulte, LCD “monthly” 25 Feb. 2013) -> a first attempt to answers 1 25 March 2013.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
X-Band Technology, requirement for structure tests and its application for SASE FEL D. Schulte for the CLIC collaboration Special thanks to A. Grudiev,
Report from the spokesperson -- CLICdp IB meeting Febr. 5 th Lucie Linssen, CLICdp IB, February 5th
General news LCD monthly meeting 12/8/2013 L. Linssen, LCD monthly meeting, 12 Aug August 8 th 2013.
General news… Monthly meeting, CLIC physics and detector study, 24/9/2012 Lucie Linssen L. Linssen, CLIC physics and detector, Monthly 24/9/
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
Prospects for Beyond Standard Model Physics at CLIC Lucie Linssen, CERN on behalf of the CLIC detector and physics collaboration (CLICdp) 1 Particles and.
CLIC Organogram CLIC Collab. Board L.Rivkin MoU with annexes describing coll. efforts (note: in reality more complicated) CLIC SC (Stapnes) Repr. from.
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
General news LCD monthly meeting 22/4/2013 Lucie Linssen L. Linssen, LCD monthly meeting, 22 April
Memorandum of Cooperation for the CLIC detector and physics study Lucie Linssen Monthly meeting 19/11/
Report from the spokesperson Lucie Linssen CLICdp IB meeting 21/1/2016 Lucie Linssen, CLICdp, IB meeting, January
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
CLIC detector & physics study -- Intro and general news -- Lucie Linssen Lucie Linssen, CLICdp 2-day meeting, October 1st Detector model CLIC &
J.P.DelahayeTILC08: 06/ 03/ 081 CLIC-ILC Collaboration? Following visit of CERN (Nov 07)
Welcome to the RFQ Meeting
ILC - Upgrades Nick Walker – 100th meeting
Staging in the TDR.
Status of the CLIC main beam injectors
WP3 status Interaction Region design
CLIC Rebaselining at 380 GeV and Staging Considerations
CLIC Klystron-based Design
Report by Steinar Stapnes
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
Lucie Linssen, CERN CLICdp meeting, May 15th 2017
Future Collider Projects at CERN
LCWS 2017 – 26th October C. Rossi
CLIC Civil Engineering Update
Measurements, ideas, curiosities
SuperB project. Injection scheme design status
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
CLIC source update CLIC main beam injectors reminder
CLIC Detector studies status + plans
Status of the CLIC Injector studies
Yasuhiro Okada, Executive Director, KEK
Damping Ring parameters for the new accelerating structure
Explanation of the Basic Principles and Goals
Barry Barish Paris ICHEP 24-July-10
Parameter Optimization in Higgs Factories Beam intensity, beam-beam parameters, by*, bunch length, number of bunches, bunch charge and emittance.
CLIC Feasibility Demonstration at CTF3
Power Consideration of CEPC
Presentation transcript:

Lucie Linssen, CLICdp meeting, June CLICdp welcome + news from CLIC staging baseline

Welcome ! Lucie Linssen, CLICdp meeting, June Welcome to the CLICdp meeting ! 56 persons inscribed, ~19 institutes represented Apologies for the early morning start and dense agenda (due to overlap with AIDA-2020 kick off meeting) Practical details: All presentations in CERN council room Institute Board meeting (restricted to IB members) in room 4-S-030 Today at 12 hrs (sandwiches provided) Workshop photo: today, at end of last session, ~18 hrs

Workshop dinner Lucie Linssen, CLICdp meeting, June Where: Fromagerie Michelin Grilly (near Divonne), France Transport: Bus at 18:45 hrs At CERN reception, building 33 Departure 19 hrs sharp! Menu (local products): Salads + Charcuterie Cheese Fruit + Ice cream Payment: 38 Euro (or 40 CHF), wine included Advance payment with Kate Ross Today during coffee breaks

CLIC re-baselining Lucie Linssen, CLICdp meeting, June Requirement, following the discussion at January 2015 CLIC workshop: First stage:E cms =380 GeV,L=1.5x10 34 cm -2 s -1, L 0.01 /L>0.6 Second stage:E cms =~1.5TeV, Final stage:E cms =3 TeV,L 0.01 =2x10 34 cm -2 s -1, L 0.01 /L>0.3 Optimised solution, by Daniel Schulte et al. Optimised acc. structures for 380 GeV (which are also compatible with klystron powering) at 72 MV/m. 4 deceleration sectors for 380 GeV Add different structures when going to high energies => good solution exists close to the current R&D on “CLIC_G” structures (with small change in length and aperture) at 100 MV/m. Adding 21 sectors yields 3.01 TeV.

CLIC parameters at 380 GeV Lucie Linssen, CLICdp meeting, June parameterunitvalue N nbnb 352 τ RF ns244 f rep Hz50 GMV/m72 x/yx/y  m/nm 0.95/30 x/yx/y nm/nm149/2.9 zz mm 70 L total cm -2 s L cm -2 s nn 1.5 (emittances at the IP)

CLIC re-baselining status Lucie Linssen, CLICdp meeting, June Editing of re-baselining document has started Expect a first full draft by end July 2015 Physics part based on CDR, CLIC Snowmass paper and CLICdp Higgs paper => => hope to complement with more info on top couplings Assumptions for annual running: CDR => based on 200 days/year at 50% efficiency (accelerator + data taking combined) => 0.86×10 7 seconds per year New assumption => 250 days/year (8 months) at 50% efficiency (accelerator + data taking combined) => 1.08×10 7 seconds per year => => may require some scaling of our benchmarking results (~0.6 ab -1, ~1.6 ab -1, 2.4 ab -1 )

Lucie Linssen, CLICdp meeting, June Enjoy the meeting !