Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
1 Cigre Study Committee C5- Brazilia workshop Market Structures and Institutions RISK MANAGEMENT Svein Storstein Pedersen Convenor of TF C
1 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November th EXECUTIVE COMMITTEE Meeting, Montecatini.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 29 th of April, st Steering Committee.
Stage 3 Review: TFEIP/ETC-ACC Karin Kindbom, Martin Adams & Justin Goodwin.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Davenport University Strategic Planning, Goal Development and Budget Process December 15, 2009.
Green Partnerships Local Partnerships for Greener Cities and Region Stavroula Tournaki, Chemical Engineer MSc, ΕU Projects Manager 2 nd SC – Portalegre,
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.
Electric Energy Systems Smart Grids and IEA ENARD – Annex II: DG System Integration into Distribution Networks Helfried Brunner Operating Agent AnnexII.
Concept paper Task XXI Standardisation of Energy Savings Calculations (ESC) Harry Vreuls, SenterNovem IEA DSM EXCO meeting 3-4 April 2008, New Delphi,
April, 2008 ABPS Infrastructure Advisory ABPS Infrastructure Private Limited _________________________________________ INTERNATIONAL ENERGY AGENCY IMPLEMENTING.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task XVII Workshop on Demand Side Management.
Task XV Extension: Task Status Report Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting New Delhi,
Water.europa.eu CIS Ad hoc activity on WFD Economic Issues -Progress Update Strategic Coordination Group Meeting, 23 February 2010 DG Environment, European.
European Commission Virtual Institutes Workshop--28 September Thematic network contracts Megan Richards DG RTD Virtual Institutes  Thematic Network.
Task XVIII: DSM and Climate Change Task Status Report Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee.
Reports foreseen within Task 21 Task 21 Experts meeting, Seoul 20 April 2011 Harry Vreuls Operating Agent.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
New Task on DSM and Climate Change Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting Brugge, Belgium.
Renewable Energy Technologies IEA - ENARD Electricity Networks - Analysis, Research and Development Draft Annex 2: „DER System Integration in Distribution.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
IEA DSM Programme Task XV: Network-Driven DSM Dr David Crossley Task XV Operating Agent and Managing Director Energy Futures Australia Pty Ltd.
Brussels, January 16th, Overview and status of the project.
Implementation of RCA Projects
Status report on CJK NGN Working Group
New transparency guidelines
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
GEOSS Data Sharing Principles
REPORT OF THE ELECTRONIC WORKING GROUP UNEP(DEC)/CAR WG.29/INF.12
Grid Code Development Forum – 6 September 2017
ESB Networks AIP Programme
9th KSC meeting Bali, 23rd August 2017
Status report on CJK NGN Working Group
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Pentalateral Energy Forum
Cost of Service Analysis & Rate Design
Update on European Network Codes
5. Areas under organic farming
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
24th January 2017 Teleconference
Activities of the UNECE-UNODC Task Force on Victimization Surveys
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
LAMAS Working Group 7-8 December 2015
19th meeting of the WG GES 22/03/2018
Smart Grid Technology – a Master Program
Role of DER in the EU and current status in the Baltic States
Passenger Mobility Statistics 21 May 2015
Approach to Market Cutover - Draft for Discussion
X-DIS/XBRL Phase 2 Kick-Off
Activity on WFD and agriculture
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
European Winter Outlooks 2008/2009 and 2009/2010
WG 2.B Integrated River Basin Management
Promoting European works - Challenges and Experiences
Session 1: The report on CIS-members´ views on the experience in the implementation of the economic aspects of the WFD.
European Statistical System Network on Culture (ESSnet Culture)
STRUCTURE AND METHODS OF CO-OPERATION
WP 1 Management and Coordination
The New Biogeographic Process General info – December 2011
Scene setter European Commission DG Environment
Passenger Mobility Statistics 21 May 2015
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
eContentplus 2007 Work Programme
Environmental Objectives and Exemptions State of Play
Presentation transcript:

Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting Brugge, October, 2007

2 Background At the Executive Committee meeting in April 2006 in Copenhagen the executive committee members  unanimously approved the initiation of the Task and nominated Seppo Kärkkäinen as the Operating Agent. The Task was given number XVII  decided that the Task Definition Phase may include a negotiation procedure and  decided that an Experts meeting (workshop) should be held in September The negotiation phase has taken clearly more time than originally planned. At the EXCO meeting in Maastricht in October 2006 there were not yet enough countries to arrange expert meeting. The target for the meeting was November 2006 in Madrid, but also this was postponed. In Seoul EXCO 6 countries were willing to send experts to task definition meeting. Finally, the meeting was arranged in June 2007 in Finland.

3 Objectives of the Task The main objective of the proposed Task is  to study how to achieve the optimal integration of flexible demand with Distributed Generation, energy storages and Smart Grids, and thus increase the value of Demand Response, Demand Side Management and Distributed Generation and decrease problems caused by intermittent distributed generation (mainly based on RES) in the physical electricity systems and at the electricity market The Task deals with distributed energy resources both  at local (distribution network) level and  at transmission system level where large wind farms are connected.  The Task will also provide the integration based solutions and examples on successful best practices to the problems defined above to the different stakeholders.

4 Approach The first step in the Task is to carry out a scope study collecting information from the existing IEA Agreements, participating countries and other sources (research programmes, field experience, information collected through Cigre working groups, etc), analyse the information on the basis of the above mentioned objectives and synthesize the information to define the more detailed needs for the further work. Especially information exchange and coordination with Wind and ENARD IAs is organised, and possibility to have common workshop is considered.

5 Subtasks Four subtasks are planned  Subtask 1: Information collection on the characteristics of different types of DER in the integrated solutions  Subtask 2: Analysis of the information collected and preliminary conclusions (state of the art)  Subtask 3: Feedback from the stakeholders: Workshop  Subtask 4: Final conclusions and the detailed definition of the further work

6 Subtask 1: Information collection on the characteristics of different types of DER in the integrated solutions (1) The information to be collected and analysed is dealing with integrated solutions where energy efficiency/demand response is combined (or seen possible to combine) with at least one of the following technologies: distributed generation, energy storage or smart grid technology aspects. The exact definition of DG will be defined, but it includes both low and medium voltage level generation as well as large aggregated generation of small units at transmission system level (like wind farms). The information is collected both by the OA and country experts based on research, pilot projects, demonstrations and other experiences. OA prepares a list of projects/public sources on the available information and prepares a draft of questionnaire to country experts. This is discussed at the first expert meeting and agreed how country experts proceed with the information collection.

7 Subtask 1: Information collection on the characteristics of different types of DER in the integrated solutions (2) The exact form of the information collection will be defined at the first expert meeting, but information to be collected include at least  technical information on the integrated use of DER (minimum requirement is DR or DSM in combination with one of the following technologies: DG, storages, Smart Grid Technologies)  penetration levels of technologies  market conditions  economy impacts on different voltage and system levels

8 Subtask 2: Analysis of the information collected and preliminary conclusions (state of the art) On the basis of the collected information a draft synthesis report and preliminary conclusions are written down including 1.Status and technical and economical characteristics of DG, energy storage and demand response including the system effects of intermittent type DG 2.State of the art of integration of DER at customer, network, system and market level; pilot and research projects and actual applications 3.Preliminary conclusions on improvements needed to enhance the integration 4.Preparation of the workshop The draft analysis and preparation of the workshop is done by OA with the assistance of country experts

9 Subtask 3: Feedback from the stakeholders: Workshop An open workshop is arranged with stakeholders with the objectives 1. To collect additional information from the invited speakers 2. To get feedback on the preliminary conclusions 3. To get inputs for the future work OA produces the workshop proceeding with the conclusions

10 Subtask 4: Final conclusions and the detailed definition of the further work As a result of the previous subtask the final products of the scope study are produced including 1. The updated synthesis report with conclusions 2. Detailed work plan for the additional work The first product is mainly produced by OA with the assistance of country experts. The workplan is produced by the expert group with OA

11 Expected results of the first stage The main deliverables of the first stage are  State-of-the art report on the integration with conclusions and first set of best practices  Workshop proceedings  Detailed plan for the further work

12 Time schedule Duration of the first phase is one year

13 Estimated resources needed Operating Agent: Personnel costs (6 person-months)75000 € Travels 3000 € Workshop 5000 € Total83000 € Country experts:6 person-weeks

14 PROGRESS SINCE APRIL 2007  Task definition workshop was arranged in Espoo, Finland, June Experts from the following countries attended: Austria, Finland, Korea, Netherlands, Spain and USA  OA sent the next version of the Task Definition to the experts for comments in July 2, 2007 on the basis of the discussions in the workshop  Comments from experts in July  Final version of the Task Definition in the middle of August  Draft text of the legal annex was prepared by OA with the help of Anne Bengtson, Fred Morse and Pamela Murphy, 22 August 2007  Draft National participation plans (NPP) were sent to the interested EXCO members by Anne Bengtson in August 22

15 Present status of participation On the basis of this progress OA decided to start the work in September 2007 and sent the invitation to the first expert meeting in Vienna 1-2 October. Due to the difficulties of time schedules, the meeting has been postponed by one month and will be arranged in Madrid 1-2 November.

16 Workplan for the next 6 months According to the project plan the work plan for the next 6 months is as follows  OA prepares the information collection form to be discussed in expert meeting  First expert meeting (in Madrid 1-2 November)  Information collection by the experts and OA, November – January 2008  Analysis of the information and draft report of the state of the art, January – March 2008  The second expert meeting at the end of March 2008

17 MATTERS FOR THE EXECUTIVE COMMITTEE (1) Cost sharing The Task budget is €, if the number of participants is less than 10 countries. If the number of participants is 10 or more, the budget will increase gradually. OA proposes, that costs are divided evenly between participating countries as follows: Number of countriesCost/country (in euros) or more8600 OA sends the first invoice of 6000 € in October 2007 to the countries who have completed the NPP Second invoice is sent in January 2008 and the amount is depending on the number of participating countries.

18 MATTERS FOR THE EXECUTIVE COMMITTEE (2) Task information plan The outputs of the task are  Workshop proceeding  The synthesis report with conclusions and first set of best practices  Detailed work plan for the additional work OA proposes that all the information is public after the end of the Task. Reason for this is that this information is needed in the decision making of the future work.