AASHTO Trns port TM SiteManager TM and Estimating 1998 TEA October 27, 1998 Portland, Maine.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Trns•port SiteManager Materials Management and LIMS Presentation
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
TxDOT's AASHTO SiteManager Implementation as of October 2004 TxDOT's AASHTO SiteManager Implementation as of October 2004.
2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
1 Bid And Proposal Evaluation Bill Shelton Scott Norton
IMPLEMENTATION KICK-OFF.  Perry’s Introduction  Project Director  Stacy Garton  Executive Team  Sandy  Jason  Bill  David.
SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
/1.401/ESD.018 Project Management Lecture 20 Project Reporting Project Close-out Samuel Labi and Fred Moavenzadeh Massachusetts Institute of Technology.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Overview of FDOT’s Long Range Estimating System 2005 TEA Conference November 4, 2005 Daytona Beach, Florida.
Claim Tracking System. Why was the Claim Tracking System Built? Mandated by the 2002 Legislature Automated Monthly Summary Reports Track and Ensure Construction.
EM15 – Contractors COST MANAGEMENT
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Methods of Measurement.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
AASHTO Trnsport SiteManager Materials Management in ALDOT October 15, 2004 Charlie Brown, ALDOT.
The Environment and Cost Benefit Analysis in Feasibility Studies
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Solutions Summit 2014 SmartAnalysis Reporting Terri Sullivan.
Tyrone Ware FDOT Specifications & Estimates Office Estimating Systems Support Section.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
ALMobile – single comprehensive platform 1© 2015 Austin Lane Technologies, Inc. ALMobile Time Tracking Equipment Extras Quantity Work Orders Production.
Go CATS!!!. KAHC-KYTC Joint Meeting March )Construction Information on Web 2)Formal Acceptances 3)Final Pay Estimates 3\16\07.
Bill-of-Material Tracking and Estimating Michael Jenkins Indiana Department of Transportation October 22, 2010.
SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.
Chapter 13 Estimates for Remodeling Work
1. EDS Project Accounting Long project lists? Completed projects can be removed from list Have your RE contact the Construction Office 2.
Measurement and Payment
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Data Warehouse A place the information system department puts the data that is turned into information. Data must be properly prepared,organized,and presented.
The Concepts of Business Intelligence Microsoft® Business Intelligence Solutions.
Public Purchasing in Florida MyFloridaMarketPlace Brief September 16, 2005.
BONDING & ACCESS TO CAPITAL SMALL CONTRACTORS INITIATIVE.
Maintenance Management System (MMS) Florida Department of TRANSPORTATION Kirk Hutchison Office of Maintenance.
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
SiteManager and Maintenance Management
EZSource Electronic Source Selection Tool
Supply Chain Management
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
SiteManager/FieldManager Interface
WORLD BANK Harmonized SBD-Works
REPORTING SDG INDICATORS USING NATIONAL REPORTING PLATFORMS
AASHTO Subcommittee on Construction Contract Administration Section
Chapter 12: Project Procurement Management
SAP Business One – Maintenance Management
Construction Approach and Productivity Issues
Innovative Contracting and Trns*Port
Wide Area Workflow (WAWF) Overview
Force Accounts.
Administrator of Construction Todd Wilson Senior Project Manager
Determine Labor and Payroll Reporting Functions
Data Warehouse A place the information system department puts the data that is turned into information. Data must be properly prepared,organized,and presented.
Proof of concept 29 September 2010
Comparative Reporting & Analysis (CR&A)
Work Orders I will be reviewing Work Orders and addressing some problematic issues.
Software Testing Lifecycle Practice
DSS Concepts, Methodologies and Technologies
Materials Certification List
State Aid Construction
Utgangspunkt for PowerPoint presentasjoner
Project Certification Planning Phase August 27, 2014
Presentation transcript:

AASHTO Trns port TM SiteManager TM and Estimating 1998 TEA October 27, 1998 Portland, Maine

SiteManager and Estimating n Introductions n SiteManager Key Processes n SiteManager Data n Accessing SiteManager Data n End Results n Summary

SiteManager Flow n Pre-Construction Interface n Contract Activation n Daily Work Reports and Diaries n Estimate Generation – line Item detail – auto pay items and adjustments – stockpiled materials – discrepancies – approvals

SiteManager Flow - cont’d. n Financial Pass n Change Orders n Materials Management – samples/tests – required testing – mix designs n Finalization – change order, estimate, materials certification, contract status n DSS Pass

SiteManager Data n Contract Items – bid quantity and amount – change order quantity and amount – final quantity and amount n Change Orders – force accounts – extra work – over/underruns n Plan discrepancies n Disputes and Claims

SiteManager Data - cont’d. n Adjustments (line item and contract levels) – incentive/disincentives – milestones – bituminous price and fuel – liquidated damages – stockpiled materials n Materials – samples/tests (pass/fail); materials and sources – mix designs – sampling requirements

Accessing SiteManager Data n Relational Database Format – adhoc queries and reports – extract data to various formats – load data into other databases, spreadsheets or statistical analysis tools (e.g. SAS) n DBA Assistance n Technical assistance for adhoc tools n User execution of reports and queries n User analysis

End Results n As built data available n End of job analysis (what was bid and what was built) n Improve future designs and cost estimation based on historical data n Analysis of contractor performance n Analysis of material, source and mix design performance for future improvements n Others?

Summary n SiteManager is a large repository of construction data n SiteManager’s technical platform allows accessing data easily and with a variety of tools n SiteManager’s data can allow a DOT to improve future estimates and designs based on historical data n Future improvements to SiteManager can facilitate additional benefits