- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -

Slides:



Advertisements
Similar presentations
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
XXXIX PANDA COLLABORATION MEETING GSI-DECEMBER 2011 B. GIRAUDO / D. ORECCHINI CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS FIRST APPROACH AND PRELIMINARY.
Joint Institute for Nuclear Research Status of the magnet for the PANDA Target Spectrometer Report from Dubna A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov,
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STT gas system a possible implementation
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Use, accuracy and How to read
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Update of MVD services and requests
Beam
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Micro Vertex Detector of PANDA Strip Detector
cooling and supports of the forward endcap EMC
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
C.Clerc ILD session, ALCPG /03/2010
IHEP group Shashlyk activity towards TDR
Integration – preliminary ideas on routing and tests
Integration issues at IHEP
EMC BWE PANDA Insertion
Requirements of the support mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
SIT AND FTD DESIGN FOR ILD
Integration and IR Hall
DET. Integration Inner detector envelope Radial clearances.
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Inner DET. Integration Inner detector envelope Radial clearances.
as a prototype for Super c-tau factory
SALTRO16 activities in Lund
Covering a Large Area ILC-TPC endplate
Presentation transcript:

- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

STRAW-TRACKER INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti ELECTRONIC_CARDS: 13 PLANES OF ELECTRONICS CARDS FOR EACH SECTOR. - THE UPDATE VERSIONE OF THE “S_TRACKER ROUTING STRUCTURE” IT’S DERIVED BY THE LATEST DEVELOPMENTS IN “ELECTRONICS ASPECTS” -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

ELECTRONIC_CARDS FLAT-CABLES & HIGH VOLTAGE CABLES STRAW-TRACKER END-PLATE ELECTRONIC_CARDS STRAW-TRACKER END-PLATE FLAT-CABLES & HIGH-VOLTAGE CABLES STRAW-TUBES MODULES INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti - TYPICAL “STRAW TUBES MODULE” WITH “ELECTRONICS COMPONENTS”. -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

STRAW TRACKER INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti FLAT-CABLES & HIGH VOLTAGE CABLES “BUNDLES” GAS PIPES FLAT-CABLES & HIGH VOLTAGE CABLES “BUNDLES” STRAW TRACKER -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- - EACH “FLAT-CABLES BUNDLES” MUST BE CONNECTED” WITH THE CORRESPONDING “PATCH PANELS”.

ROUTING SUPPORT STRUCTURE FLAT-CABLES BUNDLES CONNECTION SKIN STRAW TRACKER INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- “FLAT-CABLES BUNDLES” SUPPORT STRUCTURE.

STRAW TRACKER ROUTING SUPPORT STRUCTURE 3+3 PATCH-PANELS INFN-LNF - SPAS Note.... Screwed holes will be needed on the “Magnet Doors”. 1° HYPOTHESIS: PATCH PANELS FIXED ON THE MAGNET DOORS. GSI MEETING_March D. Orecchini – P. Gianotti -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

ROUTING SUPPORT STRUCTURE CONNECTION SKIN STRAW TRACKER PATCH-PANELS INFN-LNF - SPAS 2° HYPOTHESIS: PATCH PANELS DIRECTLY INTEGRATED ON THE ROUTING SUPPORT STRUCTURE. GSI MEETING_March D. Orecchini – P. Gianotti PATCH-PANELS -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

STRAW TRACKER ROUTING SUPPORT STRUCTURE PATCH-PANELS INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti 2° HYPOTHESIS: PATCH PANELS DIRECTLY INTEGRATED ON THE ROUTING SUPPORT STRUCTURE. -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

160 30(?) 40 (?) EMC (?) 30-40mm(?) FEE_CARDS ENCUMBRANCE SERVICES ENCUMBRANCE - Electronic cards Flat Cables - High Voltage Cables - Gas Pipes - Services Routing Support Structure STRAW-TRACKER END-PLATE FREE SPACE FOR FLAT BENDING NB.-PICTURE NOT IN SCALE EMC-BW:R 438 DIRC READ-OUT: R 440 INFN-LNF - SPAS PANDA T_BOARD- February D. Orecchini – P. Gianotti REMAINING SPACE: 2mm -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- -SERVICES ENCUMBRACES, ATTEMPT OF EVALUATION. RESIDUAL FRE SPACE: = 2mm

“EMC-BW” OUTER DIMENSIONS “DIRC READ-OUT” INNER DIMENSIONS FREE SPACE BETWEEN “EMC-BW” AND “DIRC READ-OUT”: - CLASH ISSUE: “DIRC READ-OUT” - ”EMC-BW” – VS - STRAW TRACKER “ROUTING SUPPORT STRUCTURE”. INFN-LNF - SPAS 2mm 27mm SERVICES ROUTING SUPPORT STRUCTURE THICKNESS: 30-40mm GSI MEETING_March D. Orecchini – P. Gianotti -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

More space It’s necessary to housing the “Rail reduced- Support Beam”. It’s strongly needed a slot in the Dirc “Read-Out” geometry. ACTUALLY, THE TWO COMPONENTS ARE IN INTERFERENCE!!! - CLASH ISSUE: ”DIRC READ-OUT” – “REDUCED RAIL SUPPORT BEAM”. INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

- DANGEROUS ISSUES : “STRAW TRACKER GAS SYSTEM”, “GEM” INTEGRATION. INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti (S_TRACKER GAS SYSTEM) 1150 Currently there is no interference between the “Straw Tracker Gas System” and the “GEM Parts”..... (GEM) 1139 (External) (GEM) 1160 (Internal) … but the components are very close... and they must be kept under control…. -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

- OPEN ISSUES: CENTRAL TRACKER ”RAILS SYSTEM” – “SUPPORT BEAMS” INTEGRATION. INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti Straw Tracker Rail UP Support Beam DOWN Support Beam Straw Tracker Guide -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

- OPEN ISSUES:”UP AND DOWN SUPPORT BEAMS” – “REDUCED RAILS SUPPORT BEAMS” INTEGRATION. INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti Reduced Rail Support Beam Reduced Guide Support Beam Up Support Beam Down Support Beam -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

- OPEN ISSUES: “CENTRAL SUPPORT FRAME” – “CROSS-PIPE” INTEGRATION. Cross Pipe Central Support Frame INFN-LNF - SPAS GSI MEETING_March D. Orecchini – P. Gianotti -STRAW TRACKER CLASH AND INTEGRATION ANALYSIS-

-PANDA APPARATUS_v LAST VERSION-