CASE STUDY: LITANI LOWER BASIN Progress Gumpoldskirchen 18-20 May 2006.

Slides:



Advertisements
Similar presentations
State of Water Statistics in Jamaica Regional Workshop on Water Accounting 16–18 July 2007 Santo Domingo.
Advertisements

Water Demand Management Role Play Regional Training of Trainers Workshop National Water Resources Institute, Kaduna, Nigeria 6 – 10 December 2004 West.
Climate Change and Water Resources in Lebanon Nadim Farajalla, PhD Director Department of Land, Water and Environment SETS.
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
URBAN AND NATURAL ENVIRONMENT CONSULTANTS European Commission 6 th Framework Programme for research and Technological Development Optimisation For Sustainable.
INTEGRATED MANAGEMENT OF GROUND WATER RESOURCES IN CYPRUS
MONGOLIA: Cost Benefit Analysis (CBA) Project selection Team members present at the training: Ms.Tsendsuren Batsuuri, Ministry of Environment and Green.
19/12/2006 CNTD-2006 OPTIMA PROJECT Tunisia case study Fourth Management Board Meeting December 19-20, 2006 Milano.
Hashemite Kingdom of Jordan Ministry of Water and Irrigation authority Water in Jordan: The way forward 2012 Pre by: Eng.Rateb Al-Adawn Water in Jordan:
1 OPTIMA INCO-MPC Third Management Board Meeting, May 18/ Gumpoldskirchen DDr. Kurt Fedra Environmental Software & Services GmbH A-2352 Gumpoldskirchen.
Dokuz Eylul University Water Resources Management Research and Application Center SMART Sustainable Management of Scarce Resources in the Coastal Zone.
1 New data to update the models: After the stakeholders workshop Third Management Board Meeting Gumpoldskirchen May 2006.
Optimization for Sustainable Water Resources
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
Potential Impacts & Adaptation Challenges of Climate Change in the UK Water Resources & Quality -Increasing temperatures, increasing evaporation and changing.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report.
Recent study indicates an available supply of water of little more than 1,000 m³ per person, which puts Pakistan in the category of a high stress country.
Water Issues In India by Vijay Kumar Eppakayala. India on the globe.
PRACTICE FROM CHINA GEF HAI BASIN INTEGRATED WATER AND ENVIRONMENT MANAGEMENT PROJECT World Bank / Liping Jiang In Cairns 23/10/2009.
URBAN AND NATURAL ENVIRONMENT CONSULTANTS European Commission 6 th Framework Programme for research and Technological Development Optimisation For Sustainable.
Capacity Building in Analytical Tools for Estimating and Comparing Costs and Benefits of Adaptation Projects in the Berg River Basin, South Africa AIACC.
Towards the comparative analysis of the case studies: operative steps Carlo Giupponi 1,2 and Gretel Gambarelli 2,3 1 Università degli Studi di Milano 2.
WATER ISSUES IN THE EASTERN EUROPE:
EU, SIXTH FRAMEWORK PROGRAMME Optimisation for Sustainable Water Management EU funded Project: OPTIMA INCO-MPC Partner: INTERGEO Environmental Technology.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
Water Stress in China: Shortage and Pollution CHEN Ying Research Centre for Sustainable Development (RCSD) Chinese Academy of Social Sciences (CASS) CASS-Nottingham.
1 OPTIMA INCO-MPC Project kick-off Meeting, October 28/29 Malta DDr. Kurt Fedra ESS GmbH, Austria Environmental Software.
THE RHONE RIVER BASIN Alex Houston February 23, 2012.
OPTIMA October 2004 WP01 Requirements and constraints.
INTEGRATED RIVER BASIN MANAGEMENT: FROM THEORY TO PRAXIS B.P.F. Braga Director Agência Nacional de Águas Regional Workshop and Capacity Building Training.
CLIMATE CHANGE AND WATER MAKING RIVER BASIN MANAGEMENT PLANS “CLIMATE PROOF” IN SPAIN.
Roberta Camera Valerie Cogan Beirut 12 | 06 | 03 Requirements and Constraints Analysis D01.1.
Measures to address agricultural pressures Ministry for the Environment and Ministry of Agriculture Spain.
OPTIMA Optimisation for Sustainable Water Resources Management October 28, 29 th 2004 Malta kick-off meeting National Centre for Remote Sensing - TUNISIA.
1 OPTIMA PROJECT Third Management Board Meeting, Gumpoldskirchen, Austria, May 18/20, 2006 Tunisia case study By Ahmed EZZINE.
1 OPTIMA INCO-MPC Third Management Board Meeting, May 18/ Gumpoldskirchen DDr. Kurt Fedra Environmental Software & Services GmbH A-2352 Gumpoldskirchen.
Opportunities and Challenges of Water Resources Management in Lao PDR
Ecologic.eu Brussels, 19 March 2009 Environmental & economic impact of water pricing and quotas in the agriculture sector What do we learn from practical.
Group Work IWRM Integrated River Basin Management.
OPTIMA OPTIMA Optimisation for Sustainable Water Resources Management The Case of the Gediz River in Turkey 28–30 October 2004 Senglea, MALTA.
INTRODUCTION 2.EUROPEAN UNION HARMONIZATION PROCESS 3.LEGISLATION STUDIES 4.ADMINISTRATIVE STRUCTURE 5.IMPLEMENTATION PROCESS.
Challenges, results and experience with cross-border cooperation - local and national level impacts - DRIMON and Transboundary Prespa Lake Basin Crossing.
Botswana Integrated Water Resources Management – Water Efficiency (IWRM-WE) Project Michael Ramaano IWRM/WE Project Manager, Tel:
September 11, 2012 Water Resources Statistics of the Republic of Kazakhstan A. Yepbayeva, Director of Production Statistics and Environment Department.
Climate Change Impacts on Water Resources and Human Livelihoods in the Coastal Zones of Small Island Developing States (CASCADE) Project Stakeholder Panel.
Technical and Policy Guidelines to ensure successful adoption of rain water harvesting technologies for small scale irrigation in Zimbabwe Eng. Waddilove.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
Public Participation in the SEA of Master Plan of Yerevan City in Armenia Sona Ayvazyan, Team Leader UNDP Pilot SEA Project as the Capacity Building Tool.
Towards concerted sharing: development of a Regional Water Economy model for the Jordan River Basin
Water Charge Instruments for Environmental Management in Latin America: from Theoretical to Practical Issues Mexico Country Case Lilian SAADE HAZIN and.
UNDP-GEF Project on Lake Tanganyika Best Practices and Challenges
WASTEWATER MANAGEMENT IN TURKEY
Local Government Climate Change Support Program 2016
Optimization   for Sustainable Water Resources Management (OPTIMA)
Inception Phase.
Concepts in Water Resources Management
Water Statistics and Water Account in Jordan
Water Statistics and Water Account in Jordan
Viet Nam Water Management Country Status Factsheet
The SWITCH Approach to Integrated Urban Water Management
IMPLEMENTATION OF ARTICLE 9
Guatemala Water Management Country Status Factsheet
WaterWare description
Ghana Water Management Country Status Factsheet
LIFE and the implementation of the Water Framework Directive
The Water Framework Directive: Challenges, Threats and Opportunities
Presentation of Jordan Case Study Second Management Board Meeting
Optimization for Sustainable Water Resources
Water Use in Agriculture ● 2009 EEA Report ● SoE-WISE Reporting ● Water Accounts
Presentation transcript:

CASE STUDY: LITANI LOWER BASIN Progress Gumpoldskirchen 18-20 May 2006

The Litani Lower Basin Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Update of the TS daily data LEGEND 700 701- 900 Update of the TS daily data Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Demographic Change 2.16-2.2 % yearly demographic increase 105567 capita 104 communities,5 caza. 7 towns having a population greater than 3000 2.16-2.2 % yearly demographic increase Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

River use Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Total: 22 Millions m3/year (Litani water Authority) 62km2 (Citrus) 55km2 (banana) Total: 22 Millions m3/year (Litani water Authority) Litani Irrigation Canal Qasmiyye Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Agriculture ELARD, 2001 Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Institutional Framework* Planning/Supervision MINISTRY OF ENERGY AND WATER Reports to Reports to INFRASTRUCTURE Irrigation (Qasmiyye canal, Litani canal 900) Recreational South Lebanon Water & Wastewater Establishment Litani Water Authority Reports to WATER FLOW WATER QUALITY DOMESTIC WATER from Litani River Water Authorities (Jabal Aamel) * “Decrees 5469/1 -5469/16- 5469/25- 5469/40 (1966); Law 121/2001” Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Stakeholders Workshop in september 2005 Pub. Auth NGO Workshop in september 2005 Workshop report sent to all the stakeholders Update of stakeholders’ list and information/ (27 qs and 56 stakeholders) Analysis of proposed objectives and constraints from the workshop Presentation of the Project progress scheduled with the Litani Authority Follow up second workshop in August 2006 Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

WP05: GIS DATA Metadata Input Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Land Use Change (level) Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Land Use Change Increase in Urban Fabric Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Land Use Change (Banana/ Citrus) 1998 Decrease in citrus and banana 2005 Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Land Use Change (Olives) 1998 Land Use Change (Olives) 2005 Decrease in Olives Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

WRM Baseline Scenario Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Rainfall Runoff Model (15 subcatchments) Problems with the calibration data Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Criteria (based on issues qs and ws) Infrastructural Management Legislative Awareness Increase of surface water and ground water pollution Waste water treatment plants Compliance monitoring plans Enforce standards Capacity building for local water authorities Increase in irrigation demands New channels/ dams Decision from the Council of Ministries Increase of domestic demand (increase of urbanization) Awareness Campaigns Incorrect exploitation of the river in Tourism/ violations Monitoring and control Improve permitting system Awareness campaigns Losses to the sea (winter) Development of the Agricultural sector Training on new techniques for irrigation Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Supply meeting consumption demand CONSTRAINTS Environmental Level flow in the river in some portions (especially at the coast) Supply meeting consumption demand OBJECTIVES Increase water demand efficiency Better exploitation of the River (balanced exploitation) Control sources of pollution Decrease losses to the sea Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Waste water treatment plant(s) Hydroelectrical plant(s) Hill lakes INSTRUMENTS Irrigation canal (8.05m3/sec agricultural use and 0.64 m3/sec domestic) cost of 132Million Euros 2 Dams (128 Millions m3) Waste water treatment plant(s) Hydroelectrical plant(s) Hill lakes Infrastructure Legal Update legislation/improve enforcement Decrease violations on River Water pricing Improvement of the canalization (decrease of losses) Management Awareness campaigns Irrigation technologies (surface irrigation to drip or sprinkle) Alternative crops (less water consuming) Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Finalize Baseline scenario (data, economic information, etc.) PROBLEMS RRM model (daily data for control points on subcatchment, data cannot be calibrated to a control station) Water Quality (Stream cannot be used since there were no levels of BOD detected during sampling in the River; potential campaign in summer(?)) FUTURE WORKS Finalize Baseline scenario (data, economic information, etc.) Input to WP04 (Instruments and water technologies, cost of infrastructure on the River Optimization runs Second workshop to quantify constraints, validate scenarios, in August 2006 after the progress report Intro. The river basin Stakeholders WP05 Landuse change WRM Obj/Const Instruments Conc.

Thank you