SOCLE Meeting Dec. 2008 Roman Pöschl LAL Orsay - Publications - Data taking at FNAL - Collected Data and Glimpse on Quality - EUDET Prototype - Summary.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Interactions of hadrons in the SiW ECAL (CAN-025) Philippe Doublet - LAL Roman Pöschl, François Richard - LAL CALICE Meeting at Casablanca, September 22nd.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Hadrons in a SiW Electromagnetic Calorimeter for a Future Linear Collider Roman Pöschl LAL Orsay LHC EUDET Annual Meeting DESY Hamburg September/October.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Roman Pöschl LAL Orsay CALICE Ecal Meeting 3/6/08 - Installation Period - Beamline at FNAL - Overview on Data taken - Outlook on July Running Overview.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay - Data Collected with the Ecal - Ecal in July running - Collected Data and Glimpse on Quality.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay ACFA/GDE Wordshop – TILC '08 Sendai Japan - Mar
Final CALICE OsC meeting: Status and summary of project
CALICE SiW Electromagnetic Calorimeter
CALICE Silicon ECal Sensors Status and prospects
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Preparation for CERN test beam
Status of Ecal(s) for ILD
ECAL project in the future 2-3 years
C. de La Taille IN2P3/LAL Orsay
ScECAL+AHCAL+TCMT Combined Beam FNAL
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Technical Board – DCAL Software
Stéphane Callier, Dominique Cuisy, Julien Fleury
Rick Salcido Northern Illinois University For CALICE Collaboration
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
Dual readout calorimeter for CepC
Michele Faucci Giannelli
Presentation transcript:

SOCLE Meeting Dec Roman Pöschl LAL Orsay - Publications - Data taking at FNAL - Collected Data and Glimpse on Quality - EUDET Prototype - Summary and Conclusion Review on 2008 and Prospects for 2009 SOCLE Meeting Annecy Dec. 2008

SOCLE Meeting Dec Institutes and People 1 Permanent 1 PostDoc 1 PhD Student Analysis Mechanical Construction SiWafer Development Software Development 2 Permanent 0 PostDoc 1 PhD Student Analysis SiWafer Development VFE Electronics 1 Permanent 1 PostDoc (>2009) 1 PhD Student 0 Permanent 2 PostDoc (>2009) 2 PhD Students Staff (Physicists)Direct SupportContribution Mechanics Division Electronics Division Computing Division Electronics Division Computing Division Mechanics Division Electronics Division Mechanics Division Electronics Division Analysis Mechanical Construction VFE Electronics Analysis VFE Electronics Mechanical Construction Software Development Not too many people

SOCLE Meeting Dec Starting the Harvest – Publications on 2006 data taking Editor in Chief: A.M. Magnan, Imperial S/N Calibration Uniformity Experience to deal with different manufacturers and production series Essential for final detector ~3000m 2 of Silicon needed - Linearity O(1%) Editor in Chief: C. Carloganu, LPC Compromised by acceptance effects

SOCLE Meeting Dec Ongoing analyses and goals for Advanced study on shower shape analysis Response w.r.t to Electrons, George and Valeria -> Next SiW Ecal publication ? - Advanced study on spatial resolution Response w.r.t to Electrons, Manqi and Laurent -> Next SiW Ecal publication ? - Analysis of 2007 data started Response w.r.t to Electrons, LLR and LPC - Analysis of VFE exposed to high energetic showers (R.P.) - No effect visible in small sample, suited observables? - Analysis to be extended to full sample - Expectation from MC? - Hadronic response of SiW Ecal - Two analyses started, e.g., P. Doublet LAL - Aim for publication 12/2009?

SOCLE Meeting Dec Large scale testbeam effort by CALICE Collaboration Data taking 2006, 2007, 2008 TCMT CALICE Testbeam Data Taking Testbeam Setup at CERN 2007 ECAL Analogue HCAL TCMT Slabs slit into alveolas Data taking /3 equipped Ecal Data taking 2007 (nearly) fully equipped Ecal Data taking 2008 fully equipped Ecal

SOCLE Meeting Dec Detector Installation - Equipment ready by 25 th of April – Ready to accept beam on the 29 th of April - Setup – Combined effort of DESY, Uni Heidelberg, NIU, LLR, LAL and FNAL - Setup comprises SiW Ecal, Ahcal and TCMT plus beamline equipment - Sept. 09 Data taking with Scint Ecal, Ahcal and TCMT

SOCLE Meeting Dec SiW Ecal FNAL Picture courtesy of I. Polak... strong french participation in shifts at FNAL

SOCLE Meeting Dec “Luminosity” - Recorded Data Total: 17.3 kEvens in beamData Runs~20% Calibration Data, i.e. muons ~25% with Fast Trigger (mostly e-) May July Physics Calibration Fast Calibration Slow All data recorded with Ecal on

SOCLE Meeting Dec Analysis of 2008 Data - General Remarks on DQ Ecal spectrum  e- 2e- -- - Large  contamination? - Multiparticle events (e.g. up to 5  's) - Where Cerenkov is missing Ecal can be used to separate particles - Data analysis has started H. Li – Calibration coll. with M. Reinhard P. Doublet - Hadrons Hengne Li, LAL - Fully equipped Ecal - Rich e- sample – Repetition of 2006 low e- electron data - Low energy hadron with overlap to cern range - For future testbeams it is Important to obtain a profound picture on FNAL beam quality

SOCLE Meeting Dec Hit Maps... Marcel Reinhard, LLR Dead Cells in bottom layers – Main reason for repatriation of Ecal

SOCLE Meeting Dec EUDET Prototype Logical continuation to the physical prototype study which validated the main concepts : alveolar structure, slabs, gluing of wafers, integration Techno. Proto : study and validation of most of technological solutions wich could be used for the final detector (moulding process, cooling system, wide size structures,…) Taking into account industrialization aspect of process First cost estimation of one module Short detector slabs (×14) 3×15 cells Technological prototype Complete Tower of 4 wafers = 18×18 cm 2 Long detector slab (1) Short detector slabs (×14) 3 structures : 24 X 0 (10×1,4mm + 10×2,8mm + 10×4,2mm) sizes : 380×380×200 mm3 Thickness of slabs : 8.3 mm (W=1,4mm) VFE outside detector Number of channels : 9720 (10×10 mm 2 ) Weight : ~ 200 Kg 1 structure : ~ 23 X 0 (20×2,1mm + 9×4,2mm) sizes : 1560×545×186 mm3 Thickness of slabs : 6 mm (W=2,1mm) VFE inside detector Number of channels : (5×5 mm 2 ) Weight : ~ 700 Kg

SOCLE Meeting Dec The groups working on the EUDET Electromagnetic Calorimeter - What we call “EUDET Module” is in fact the next SiW Ecal CALICE Prototype - Financial support by EU but largest fraction of funding still from “Calice” ressources!!!!

SOCLE Meeting Dec Parties Involved 6 Laboratories are sharing out tasks in according to preferences and localization: Assembling of A.S.U. (industrialization, gluing and tests) + backend system ( DIF support ) + services Tests of wafers Global Design + composite Structures Thin PCB with embedded ASICs Detector slabs integration External cooling system Fastening system ECAL/HCAL + composite plates Wafers PCB + ASICs A.S.U. backend system H structure Alveolar structure. Detector slabs (short & long)     + thermal cooling + Interconnection of ASU, DIF

SOCLE Meeting Dec Status of the Project 2008 June 2009 Deliverable Ecal Design originally planned for 6/08 ~Today Construction Phase Ecal Prototype available for TNA Deliverable Structures and moulds Timeline of the Project - No major delays - Design Phase concluded Details see talk in JRA3 parallel session and... - Milestone(s) are accompanied by two EUDET Memos - Funding is still critical... Studies on a demonstrator

SOCLE Meeting Dec Two EUDET Memos published in 2008 EUDET-Memo EUDET-Memo Covering apects of the alveolar structures Addresses all issues of the technical realisation Memos do document the significant progress of the project in 2008 IN2P3 Members

SOCLE Meeting Dec Mainlines for should be the analysis year!!! - Finalizing existing analyses - Large bulk of 2007 data still poorly analysed – Scope/Aim of analyses? Analysis has started at LLR and LPC. - Hadrons in the Ecal – Exploration of high granularity - Tighten the interplay with full detector studies - Detector LOI's in 2009 – Impact of Calice results? - Revision of current Ecal software and improvement of e.g. digitisation? - Testbeam at FNAL with DHCAL towards end of 2009 !? - Completion of first round of CALICE Program - Please reserve some resources in your travel budget! - Construction of EUDET Module - First half of the year mainly hardware - Needs to be accompanied by software/analysis effort by late summer '09 Responsibles for task? - Preparation of next round of test beams - Definition of Programs - Preparing the requests of beam times (I)LC Testbeam meeting at LAL Orsay – First week of november 09

SOCLE Meeting Dec Backup....

SOCLE Meeting Dec Impressions from the Ecal Running I Ecal Noise largely tamed No noisy layers for > 90% of time Suggest to prepare data analysis such that Events with Ped. Shifts are simply rejected not corrected

SOCLE Meeting Dec EUDET Module and Transnational Access - > June 2009 Electronics R&D Mechanics R&D EUDET Ecal Module EUDET DAQ“EUDET” Soft (Combined) Testbeams Operability of an ILC Detector Validation of Simulation (VALSIM) Test of Non-Ecal Electronics The Ecal Project

SOCLE Meeting Dec CALICE Testbeam at FNAL - Installation Phase: 7/4/08 – 25/4/08 - Commissioning Phase: 28/4/08 – 7/5/08 - “Physics Runs” Phase: 7/5/ /5/08 General Running Conditions: - Day operation – Beam between ~6m and 6pm - Testbeam delivery interrupted by “Shot Setup” for TEVATRON experiments ~2 hours during our running - No major machine downtime Some failures towards the end of the running Compensated by two extra half days on 26/5/08 and 27/5/08 – Running 6am – 12pm Agreement on short notice FERMILAB provides excellent support for our running - see above - e.g. Extensive help during (non trivial) setup of computing - Restart Phase: 1/7/08 – 4/7/08 - Calibration Runs: 4/7/08 – 9/7/08 Calibration with Fast Trigger Calibration with Slow Trigger - “Physics Runs” Phase: 9/7/08 – 1/8/08 'Fast Trigger Running': 7/7/08 – 13/7/08 'Slow Trigger Running': >13/7/08 General Running Conditions: - Night operation – Beam between ~8pm and 10am Machine (and detectors) suffered from hot FNAL summer (up tp 42 o C) - Testbeam delivery interrupted by “Shot Setup” for TEVATRON experiments ~2 hours during our running - Major machine downtimes (at least until 22/7/08) up to 50% during several days Partially compensated by extensions > 10am - Downtime did cut into our program! Concern was brought to FERMILAB Management and acknowledged. Mostly open to extensions but also harsh cuts of beam (scheduled) on-time

SOCLE Meeting Dec Breakdown of recorded data I – Slow Trigger E/GeV kEvents E/GeV kEvents Mainly during commissioning phase kEvents E/GeV Managed to accumulate hadron data at both polarities Significant larger sample at negative polarities

SOCLE Meeting Dec Breakdown of recorded data II – Slow Trigger/”Special” Data E/GeV kEvents E/GeV kEvents Mainly commissioning run kEvents E/GeV Rotation program suffered most from significant beam down time Still, considerable amount of data collected To this adds a shifted detector program with total ~500k Triggers at 10 and 30 GeV and high energy proton running 160k Events

SOCLE Meeting Dec Breakdown of recorded data III – Fast Trigger E/GeV kEvents E/GeV kEvents Mainly during commissioning phase Considerable samples at small energies with fully equipped Ecal Pion content increases gradually with increasing energy