Prof. Shrikant M. Harle.  Scheduling is a process which tries to organize activities in logical sequence.  While it is not possible to know with certainty.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project Management from Simple to Complex
Work Breakdown Structures
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Developing a Project Plan
Advanced Project Management - CPH
Management & Development of Complex Projects Course Code - 706
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Project Management Session 7
What is Project Management?
Engineering Design Development. Turner College and Career High School.
Winter 05 Project Schedule A Gantt Chart is a means of presenting the master schedule of activities for your project –Named for Henry L. Gantt ( ),
Project Management Basics
BAR CHART Paweł Bilski Piotr Mazur Paulina Wawryca.
Chart Basics Paul Morris CIS144. Gantt Charts Gantt charts are essentially bar graphs that help plan and monitor project development, resource allocation,
Gantt Chart Engineering Design Development. Turner College and Career High School.
Project Management and Scheduling
Chapter 6 Introduction to Microsoft Project
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
SOFTWARE PROJECT MANAGEMENT
WEEK 3 Project Planning.
Project Management SAI’s Class. Project Management Task Cadets will create a project management plan and their project. a. Define the stages of project.
Creating a Work Breakdown Structure with Microsoft Project.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
A Brief intro to Project Management What can it do for you
Chapter 3 Managing the Information Systems Project
Work Breakdown Structure (WBS)
Time Management.
Project Management MGT 30725
Project Management Systems
By Wilmer Arellano Spring 2010
Managing the Information Systems Project
BUSINESS PLUG-IN B15 Project Management.
Project Management BBA & MBA
Project Scheduling
Work Breakdown Structure
Concepts and Definitions Work Breakdown Structures
Fall 06 ECE 361 Project Schedule
Project Management and Information Security
forward scheduling or backward scheduling
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Project Management.
Team member, Team member and Team member
Chapter 6: Project Time Management
System analysis and design
CHAPTER 6 PROJECT TIME MANAGEMENT
Chapter 5 Planning
MGT 605: CH 04 Defining the Project.
P ROJECT M ANAGEMENT Skills.
Information System Analysis
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Modern Systems Analysis and Design Third Edition
Team member, Team member and Team member
Importance of Project Schedules
CHAPTER 6 PROJECT TIME MANAGEMENT
Time Scheduling and Project management
Modern Systems Analysis and Design Third Edition
Scheduling.
Information system analysis and design
Presentation transcript:

Prof. Shrikant M. Harle

 Scheduling is a process which tries to organize activities in logical sequence.  While it is not possible to know with certainty how long a project will take, there are techniques that can increase your likelihood of being close.  If you are close in your planning and estimating, you can manage the project to achieve the schedule by accelerating some efforts or modifying approaches to meet required deadlines.

 One key ingredient in the scheduling process is experience in the project area; another is experience with scheduling in general.  In every government organization area there will be a body of knowledge that associates the accomplishment of known work efforts with time duration.  In some industries, there are books recording industry standards for use by cost and schedule estimators.

 Interviewing those who have had experience with similar projects is the best way to determine how long things will really take.  When preparing a schedule estimate, consider that transition between activities often takes time.  Organizations or resources outside your direct control may not share your sense of schedule urgency, and their work may take longer to complete.

 Beware of all external dependency relationships.  Uncertain resources of talent, equipment, or data will likely result in extending the project schedule.

 Taking its name from early project management innovator Henry L. Gantt, the basic Gantt chart or now one know it as Bar Chart is an easy way to document schedules.  It is a horizontal-bar schedule showing activity start, duration, and completion.  It shows the connection between events and the calendar, and provides a graphical analogy of the activity duration.

 The Gantt schedule can illustrate the relationship between work activities having duration, events without duration that indicate a significant completion, and milestones that represent major achievements or decision points.  Various comments can be used to communicate the progress of the project effort compared to the baseline plan, as well to depict in a graphical way areas where there are modified expectations from the baseline plan.

 Once a Gantt schedule has been established for a project, progress should be periodically plotted against the baseline schedule.  If different functional areas are involved in a project, each area may need its own detailed schedules to support the project master schedule.  In such cases it is important that working schedules be linked to a common master schedule in a way that they can be easily updated.

 Each activity or event on the schedule should have a responsible individual assigned, so there is clear ownership and so schedule status can be updated without a lot of argument.  “Activity”- An activity is a part of the project denoted by an arrow on the network. The tail of the arrow indicates the start of the activity whereas the head indicates the end of the activity.

 “Event” – Event is the stage or point where all previous jobs merging in it, are completed and jobs bursting out, are still to be completed.  Here 1 and 2 denotes the event form where the activities A, B, C, D can merge of burst out Scheduling process needs duration of the activity.

 A Work Breakdown Structure is a results- oriented family tree that captures all the work of a project in an organized way.  It is often portrayed graphically as a hierarchical tree; however, it can also be a tabular list of "element" categories and tasks or the indented task list that appears in your Gantt chart schedule.

 Large, complex projects are organized and comprehended by breaking them into progressively smaller pieces until they are a collection of defined "work packages" that may include a number of tasks.  The Work Breakdown Structure (WBS) is used to provide the framework for organizing and managing the work.

 In planning a project, it is normal to find oneself momentarily overwhelmed and confused, when one begins to grasp the details and scope of even a modest size project.  This results from one person trying to understand the details of work that will be performed by a number of people over a period of time.