Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.

Slides:



Advertisements
Similar presentations
Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
Advertisements

SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
Mark Raymond /10/051 Trip-t testing brief status report test setup description - hardware and software some very early results.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
F.F. - 18/07/ User Guide of the Input Trigger Multiplexer unit with input signal rate counters.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Control Software (CAT) Introduction USB Interface implementation Calorimeter Electronics Upgrade Meeting Frédéric Machefert Wednesday 5 th May, 2010.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LHCb Calorimeter Meeting – 2 nd December 2015 Calorimeter upgrade update Universitat de Barcelona, Institut de Ciències del Cosmos ICC-UB Laboratoirede.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
FED 9U Analog Characterization Stefanos Dris CERN & Imperial College.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
BPM stripline acquisition in CLEX Sébastien Vilalte.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Calorimeter CROC PRR CERN Calorimeter ReadOut Card PRR Tests of the CROC Calo CROC PRR – Tuesday 19 December 06.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
M.N Minard Trigger Validation Board Tests and Implantation Cyril Drancourt, Pierre-Yves David,Victor Coco, Thomas Chouvion,M.N Minard - Production status.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
Summary of the Barcelona Meeting March 10 th and 11 st, 2009 Calorimeter Upgrade Meeting Frédéric Machefert On behalf of the Barcelona and Orsay Groups.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
1 ECAL/HCAL FEB and CROC. FEB serialisers Serialiser tests GANIL Irradiation test. CROC bit flip error modifications and tests Calorimeter Detector/Electronics.
PreShower Characterisations
D. Breton, S. Simion February 2012
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
PADME L0 Trigger Processor
Data Acquisition (DAQ) Status
MCPPMT test bench at LAL D. Breton, L. Burmistov, J. Maalmi, V
Calorimeter Upgrade Meeting - News
LHCb calorimeter main features
SLB Synchronization in H4 Beam (LIP - Lisbon)
Commissioning of the ALICE-PHOS trigger
Tests Front-end card Status
Overview of the LHCb Calorimeter Electronics … focus in the ECAL/HCAL
Test of Link and Control Boards with LHC like beam, CERN, May 2003
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
Presentation transcript:

Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting2 Introduction Time phase shifts have been observed in the past The amplitude of the shift was up to ~ 2 ns This was seen on 2 crates after the latest winter shutdown This effect Was measured with beams (particles) Can potentially affect the system (mainly the trigger) Exchange between crates have to be properly time adjusted Is not understood Some hypothesis are Shift appears somewhere on the fiber path (patch panel, source of the signal) Dust on the TTCrq fiber connector The TTCrq mezzanine A component on the CROC Try to develop a cheap system to measure the relative phase between the crates (Marie-Noëlle)

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting3 The system The FEB can measure integrals 2 overlapping clocks (coincidence) may be integrated with our FEB Idea consists in Having a clock from each crate to be measured Having a reference signal Provided by a crate -> synchrone with one of the clocks to be measured Has a lower repetition rate than a clock Coincidence would be a low repetition rate square signal Surface is constant if no phase shift Surface depends on the phase between The clocks from the crates The reference signal Requires an extension of the FEB Receives 22 clock signals (PRS, ECAL, no HCAL) Perform the coincidence with the reference Reference would be the calibration pulses Phase measurements are performed altogether with the LED pulsing FEB Extensio n Calibration (Integration coincidence ) 22 crate inputs After- coincidence Signal to be integrated

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting4 Coincidence and measured signal Referenc e Crate A Crate B

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting5 What is measured

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting6 Installation and integration to the acquisition The boards have installed during the latest TS 2 FEB 1 per side 1 FEB deals with 4 PRS 7 ECAL crates The clock signal cables have been attached (as neatly as I could... I am not an expert !) and their length have been adjusted so that the integrated signal is in the middle of the allowed range We have a « safe » +/- 3ns range of measurement around the present value The reference signal is the calibration pulse The L0 used to acquire the pin-diode is used here to acquire the « integrated coincidence » This required an adjustment of the latency in the FEB CROC and TELL1 (Stéphane) channels for the 2 FEBs have been enabled Olivier adapted the software New FEB are not in the physics path On the fly building of histograms Integrated signal amplitude RMS of the signal Trending Now integrated in the presenter : Calorimeters -> Ecal -> Crate Timing

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting7 How it looks like : not very nice... RM S Trendin g Signa l 2 regimes : collisions (L0) - no collisions (no L0) Difference ~ [75, 200] ADC, [0.25,0.75] ns 1ns ~ 280 ADC counts Noise is multiplied by a large factor Value (no L0) corresponds exactly to post-installation meas.

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting8... and this can be worst (crate 19) Some « extra-features » : ● Peaks : detector throttling, run change, re-configuration -> most probably ok ● 2 regimes appear when not in stable beam ● Undefined state (no beam), Internal/external clock,... ?

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting9 Discussion (I) Recall : A single phase shift would be noticed by A SINGLE measurement affected -> clock not from the crate with the reference ALL measurements BUT ONE -> reference and corresponding crate shifted Still a lot to understand L0/no L0 regimes (probably the worst problem) ALL crates are affected Also the clock which is measured in the SAME crate as the reference This first led to the conclusion that the problem affects only the clocks Not the reference NIM, FPGA output of the CROC ? Difficult to see how this would be linked to the L0 rate FPGA is a APA: remember that this caused problems at high rate ! Idea (Jacques) : the problem could be caused by the REFERENCE This would explain what is observed Calibration pulse (produced in the Sequencer) would be affected Sequencer receives the L0 data from the 8 Fe-PGA -> L0 rate Sequencer is an APA Idea can be tested at LAL on a test bench – difficult to cure System can still be used but with 2 reference values for the « default behaviour »

Wednesday 21st, 2011Frédéric Machefert – Calorimeter Meeting10 Discussion (II) Other problems : Understanding would require to know the state of the detector During physics -> mostly ok Shift leader / big brother writes state in the logbook This permits to see throttling, run change, etc... While there is no physics it seems that Configuration, resets, de-allocation, LHC(b) clock used, etc... affect the measurements harmless, but we would like to understand Short term survey Automatized alarm on the trending not feasible Anyway, this is not really wished looking at the trending curves ! Could we imagine (Benoît, Olivier) Define a range around the « nominal ADC count » 0.3 ns ~ 85 ADC count Once in physics, measurement is ~ stable (but for throttling, run change) Define it for physics period ONLY Provide a message to the piquet if ADC count out of range for more than x minutes