3x1x1 m 3 Anode deck Suspension system WA105 meeting - 21 st of January, 2015 B. Aimard, G. Balik, L. Brunetti, G. Deleglise, D. Duchesneau, N. Geffroy.

Slides:



Advertisements
Similar presentations
BA Electrical Machines Insert image here Cast Iron Motors M3000, Status January 2003; What is new in M3BP355 and 400?
Advertisements

W89-A-0501 ZPU 08 / 14 / 24 1 High Pressure Pump for Grease Type ZPU 08 / 14 / 24.
Material Handling Modules Configuring Your Own Work Cells.
WP F/L Development of the Dom support and rope- and cable management for KM3-Net. KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef Edward Berbee.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Copyrights © ATTEXOR Clinch Systems SA 1 Modules (for integration) This presentation is for internal use of ACS’ exclusive.
Overview The top seal mechanism consists of a foil unwinding and feeding mechanism and a cutting and welding mechanism. It is designed to cut out and weld.
Larox Pinch Valves T HE S OLUTION Y OU ´ VE B EEN L OOKING F OR.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
A Preliminary Design of the Rotator for the DES Simulator Stand February 28, 2008 Edward Chi Fermilab/PPD/MD.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
Vacuum Fundamentals High-Vacuum Technology Course Week 6 Paul Nash HE Subject Leader (Engineering)
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
R 180 – R 280 Rolling Shutters. Why? Innovation for better competitiveness.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Installation of the T600 at Fermilab CSN2, September 22,
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S.,
1 LUND March 16 th, 2016 ESS ELLIPTICAL CRYOMODULE Vacuum vessel: Ports and sealing, Manufacturing feedback LUND, March 16th, 2016 Unité mixte de recherche.
WA105 General meeting CERN – 21 January 2015 Feedthroughs for the 3x1x1m 3 Franco Sergiampietri ETH Eidgenössische Technische Hochschule Zürich Swiss Federal.
Mu2e Protection Collimator, PC Andy Stefanik January 19, 2016.
Titre Drawbacks of standard fittings Dead Volume. Gaskets Particle Generation Twisting of Tubes Male / Female Parts Inventory Welding Panel Design Assembly.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
DECAM LN2 PUMP REMOVAL - CHECKLIST
LCWS11 WG4 Fully featured accelerating structure engineering design
EDML#17 First Mill Head Service
COMPRESSED AIR PRODUCTION USING VEHICLE SUSPENSOR for PNEUMATIC BRAKING SYSTEM with INTELLIGENT BRAKING APPLICATION(SEMI- AUTOMATED) BY VIDYAPUTRA.
Stator Plan & Schedule Chris Booth 2nd March 2009
Teleconf ACS – FREIA 28th March 2017
Teleconf ACS – FREIA 13th March 2017
Installation of the T600 at Fermilab
GOVERNMENT ENGINEERING COLLEGE DAHOD
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Plans for the construction of the new membrane cryostat in bldg 182
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
IT-4189 Supply and installation of a cryogenic distribution system
new straw end plug: D=10.6 mm straws support frame Levan option
HFM Test Station Main Cryostat
NOVA DESK RANGE.
Teleconference ACS – FREIA 18th April 2017
Flexible lines production and planning
Teleconference ACS – FREIA 17th October 2017
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Teleconference ACS – FREIA 31st October 2017
All you Need to Know About the Wiring Harness
Status of the PANDA Solenoid Magnet Production in BINP
SHANGHAI ROTORCOMP COMPRESSOR ONLY USE.
Teleconference ACS – FREIA 20th February 2018
LARP Phase II Secondary Collimator RC-1
Cryomodule Assembly Plan
Electrical and fluid couplings
Teleconference ACS – FREIA 19th June 2017
Enrobing+ wheelmachine 50Kg
UPPSALA UNIVERSITY_GERSEMI PROJECT
CLASS® Compressible Liquid Adaptive Suspension System
Presentation transcript:

3x1x1 m 3 Anode deck Suspension system WA105 meeting - 21 st of January, 2015 B. Aimard, G. Balik, L. Brunetti, G. Deleglise, D. Duchesneau, N. Geffroy

21/01/2015 B. Aimard 2 Anode deck suspension Anode deck Insulation Top Cap Suspension 3 Suspension 2 Suspension 1 Liquid Argon

21/01/2015 B. Aimard 3 Hanging system Specifications (SPFT) 40 mm full range movement 0,1 mm positioning accuracy CRP + deck mass : 120 kg (3 chimneys : 40 kg / cable) Vacuum-tightness to keep LAr purity Foresee system maintenance Mechanical stop / end of stroke (safety & maintenance)

21/01/2015 B. Aimard 4 System Overview Motor + brake Gears Ball-screw Over-stroke limiter Bellow Air purge Mechanical stop Suspension cable

21/01/2015 B. Aimard 5 Top-cap integration (1/2) Top view 3D view System fits well in the whole assembly Angular position can easily be changed Cable tray not yet defined

21/01/2015 B. Aimard 6 Top-cap integration (2/2) ~ 1053 mm Height of the assembly : 1053 mm Mass : ~ 50 kg / chimney ~ 229 mm

21/01/2015 B. Aimard 7 SPFT - lower part overview Conflat flanges (DN125 type with copper ring) Suspension cable Bellow (welded diaphragms) Over-stroke limiter Air purge Mechanical stop

21/01/2015 B. Aimard 8 Over-stroke limiter – in operation In operation, transmission between the drive and the wire Loose adjustment allows misalignment between upper and lower parts

21/01/2015 B. Aimard 9 Over-stroke limiter - maintenance In maintenance : Mechanical stop (green plate) sticks to grey flange  Compression of the O-ring Over-stroke limiter (orange part) unsticks  Liberation of the cable tension in the upper part, allowing easy disassembling. Elastic ring to avoid fall of the orange part during maintenance

21/01/2015 B. Aimard 10 Air Purge 6 mm diameter purge Welded connector Swagelok adapters + manual valve foreseen Vacom Quick CF connection

21/01/2015 B. Aimard 11 Mechanical stop Rubber O-ring to seal the Ar volume  50 kg tension (CRP + deck mass) to deform the O-ring

21/01/2015 B. Aimard 12 Drive integration Drive choice : Siemens motor and gears Bosch ball-screw 100 mm stroke 5 mm step 25mm diameter shaft Junction between motor/gear and ball-screw :  Suitable for 3x1x1 and 6x6x6

21/01/2015 B. Aimard 13 Drive automation  Common architecture for 3x1x1 and 6x6x6

21/01/2015 B. Aimard 14 Order of the drive architecture : End of January > Hardware delivery in March Production drawings : End of January 2015 End of electrical studies: March 2015 End of production : March 2015 (mechanical parts vacuum tested) Cabinet cabling: April 2015 Tests at LAPP (process with uncoupled motors): May 2015 Integration at CERN (commissioning of the hardware, cabling…): June 2015 Tests at CERN: July 2015 Schedule (main milestones)