Copyright 2006 – Biz/ed Critical Path Analysis.

Slides:



Advertisements
Similar presentations
Project Management Techniques and tools Move mouse over arrow to enter presentation.
Advertisements

Lecture Network Analysis
Copyright 2006 – Biz/ed Critical Path Analysis.
PROJECT MANAGEMENT Network or Critical Path Analysis
Based on the book: Managing Business Process Flows
Productive Efficiency
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
Welcome to your final year at school! Introductions.
5.8 Project Management Chapter 37 HL - Only.
CPA A house is to have new carpets fitted throughout. The work involved has been divided into a number of tasks, as shown in the table.
Operations Management
CPA Setting up an ICT system. A consultancy company has divided the work into a number of activities. The table below shows the details. ActivityImmediate.
5.5.1 Plan of Operation 1 Guidelines for Implementation UPA Package 5, Module 5.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
15C Backward scanning and crashing
Lecture Network Analysis
Business Studies Grade 11.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Thought for the day: Being busy does not always mean real work.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
PROJECT MANAGEMENT Syllabus Outcomes : Construct and interpret a network, identify the critical path, and calculate the free and total float. Evaluate.
Project Management HNC Computing 2000 Unit 8 Quality Management Prepared by S Hargrave.
A brief summary of Critical Path (or network) Analysis Critical Path Analysis is a way of planning complex projects. It allows one to find those parts.
G048: Lecture 06 Critical Path Analysis Mr C Johnston ICT Teacher
IB Business and Management 5.8 Project Management (Critical Path Analysis)
Topic 5.8 ( only HL ) IB Business & Management Project Management Mr L Greenbank 1.
O PERATIONAL S TRATEGIES O PERATIONAL S TRATEGIES : L EAN P RODUCTION “Do not wait; the time will never be just right” Napoleon Hill “The clock not the.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Critical Path Analysis. Planning and Monitoring Tool.
PROJECT MANAGEMENT Approaches
University of Sunderland CIFM02 Unit 2 COMM02 Activity Planning Unit 2.
Operational strategies Lean production. The adoption of techniques that help to reduce waste.
A2 Operations Management Critical Path Analysis. How long will it take? n Walls have decided to launch a new Magnum ice cream. Machine delivery will take.
15B Critical path analysis. In a critical path analysis, edges represent activities. Nodes (vertices) represent the end of one activity and the start.
INVENTION, INNOVATION AND DESIGN Invention: A new way of making a product (e.g. walkman) or process (e.g. spray painting). Inventions usually come from.
Critical Path Analysis - Worksheet
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
Net work Analysis/Critical Path Analysis (L1) Learning Objective – Understand CPA Learning Outcomes - By the end of the lesson students should be able.
Critical Path Analysis. Starter – The Big Breakfast! On Saturday, I want to cook myself a big breakfast.I want to have some toast, scrambled eggs and.
First name ??? ist auf Englisch. Critical Path Analysis.
Lean Production: Critical Path Analysis 3.15 Lean Production Objectives; Understand the key requirements of critical path analysis (CPA) Understand the.
17 Project Management Homework; 1b, 4b, 5b, Sup1, Sup2.
Critical Path Analysis (CPA)
Critical Path Analysis
Critical Path Method(CPM)
UNIT II Scheduling Procedures & Techniques FLOAT
Critical Path Analysis
Chapter 17 Project Management McGraw-Hill/Irwin
Software Project Management
Lean Production.
Project planning Unit 3 Employability and Professional Development
Project Management for Business
Critical Path Analysis (CPA)
Project Time Management
Analysing the AoA network
Welcome to your final year at school!
Chapter 5 Planning
Critical Path Method Farrokh Alemi, Ph.D.
Activity on Node Approach to CPM Scheduling
PROJECT MANAGEMENT (BSBI 622)
Project Management (lecture)
Project Planning By Phaik San Liew.
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
CPA – Information Sheet
Project Management (lecture)
Importance of Project Schedules
Critical Path Analysis
Critical Path Analysis
Have a think…! What process do you need to go through to make bread or redecorate your bedroom? Are there any activities that could be done at the same.
Presentation transcript:

Copyright 2006 – Biz/ed Critical Path Analysis

Copyright 2006 – Biz/ed Critical Path Analysis

Copyright 2006 – Biz/ed Planning and Monitoring Tool

Copyright 2006 – Biz/ed Critical Path Analysis May be used as part of the decision making process Enables a firm to plan and monitor operations Time related – identifies the maximum time for an operation to be completed Identify potential problems in implementing operation Identifies where and when resources (including human ones) are needed

Copyright 2006 – Biz/ed Critical Path Analysis Advantages –Maximise efficiency in the use of time –Improve efficiency and generate cost saving in the use of resources –Beneficial to monitoring cash flow Disadvantages –Usefulness may be limited in complex and large scale operations –Necessity of having clear and reliable information –Skilled management and team philosophy is essential

Copyright 2006 – Biz/ed The Process

Copyright 2006 – Biz/ed CPA – the Process Identify and prioritise the activities Identify which activities MUST be done before others EST – identify earliest start time LFT – identify latest finish time Identify the FLOAT – tasks which can be completed outside the critical path Identify the critical path – points connecting ESTs and LFTs (where these are the same)

Copyright 2006 – Biz/ed Critical Path Analysis Nodes: Show the start and finish of a task 12 Node numbers showing order of activities in the left hand semi-circle of each node. 3 Earliest Start Time (EST) 5 Latest Finish Time (LFT) A 3 B 5 Arrows indicate the order of the tasks, the letter above shows the order, the time period below the arrow The Critical Path

Copyright 2006 – Biz/ed Examples Video – Around the world in 80 Days Over to you – Activity Bizhelp Morning routine… CPA Computer Project Specialist software

Copyright 2006 – Biz/ed In Conclusion What is CPA Advantages & Disadvantages The Process Diagram Syntax Examples Questions?