Drive Beam Feedforward and Compression Current layout Issues Ideas for changes in the layout
Current Layout Final Compression, Phase Correction PETS First Compression, Phase and Energy Measurement Combiner Rings DB Accelerator Gun
Issues Energy spread is limited, i.e. a huge R56 is required for compression An incoming energy jitter will cause a huge phase jitter The phase correction must allow a huge correction range while maintaining an accurate phase correction (0.1deg @ 12GHz) The correction kickers must be strong and accurate The kickers require a lot of space and will be expensive (remember that we need 48 of these systems)
Some ideas for layout changes 1 Split phase correction in two parts => more accurate correction Zero total R56 behind final acceleration => phase becomes independent of energy jitter Final Re-compression, Phase Correction PETS DBA 2 First Re-compression, Phase and Energy Measurement Final compression, Phase Correction CR Uncompression DBA 1 Gun First Compression, Phase and Energy Measurement
Some ideas for layout changes 2 Since we don't expect any phase jitter to be induced in the beam lines behind the combiner rings* we could use a single correction system instead of 24 => simplify beam lines and reduce cost *there might be some jitter from the loop, but this cannot be corrected in any case Final Re-compression, Phase Correction PETS First Re-compression, Phase and Energy Measurement Final compression, Phase Correction CR DBA 2 Uncompression DBA 1 Gun First Compression, Phase and Energy Measurement
Some ideas for layout changes 3 If the combiner rings and the loops could be build in a way that CSR is small even for final bunch lengths we could remove uncompression and re-compression. Phase measurement and correction could be integrated in the loops => simplify beam lines and reduce cost Phase Correction via orbit bump in loop PETS Phase Measurement Final compression, Phase Correction CR DBA 2 DBA 1 Gun First Compression, Phase and Energy Measurement
Some ideas for layout changes 4 Again one can argue that we might not need 24 feed-forward systems on each side => simplify beam lines and reduce cost PETS Phase Correction via orbit bump in loop Final compression, Phase Correction CR DBA 2 Phase Measurement DBA 1 Gun First Compression, Phase and Energy Measurement