SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
CP Chapter 4 Schedule Planning.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Chapter 3 Managing the Information Systems Project
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
CE 405 – SCHEDULING CRITICAL PATH In order to be an effective Scheduler/ Project Manager – and realizing that you will have too many things demanding your.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Chapter 3 Managing the Information Systems Project
Project Time Management
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Amin Salari, CCM, PMP, LEED AP – Lundgren Management
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Project Schedules The Cabinets New Categories of Scheduling.
PROGRAMMING Frank Ellis B.Sc. ARSM Thursday 26th March 2015
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Chapter 3 Managing the Information Systems Project
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Lecture 3 Part 1 Managing the Information Systems Project.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
For Life™ [Insert Date Here] [Insert Instructor Name Here] Project Management Skills.
Project Management PTM721S
Chapter 11 Project Management.
Chapter 3 Managing the Information Systems Project
Project Management – PTM721S
Managing the Information Systems Project
Business System Development
Plan Schedule Management
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Business System Development
TOPIC-8A- PROJECT TIME CONTROL
Project Planning and Scheduling
ECE2799 Project Management
Chapter 6: Project Time Management
Information Technology Project Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Introduction to Project Planning & Scheduling Software Microsoft Project Prepared by; Emedya Murniwaty Samsudin emedya murniwaty samsudin_msp2013 sem 2.
CMGT 410 Education for Service-- snaptutorial.com.
PMIS Initiating a Project Application of Project Management Processes Project Charter Stakeholder Analysis and Stakeholder Register 2. Planning.
CMGT 410 Teaching Effectively-- snaptutorial.com.
Software Project Management
Project Theory and Application
Project Time Management
CIS12-3 IT Project Management
Project Time Management
Chapter 6 Activity Planning.
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Project Management CPM/PERT Professor Ahmadi.
Project Time Management
Project Time Management
Chapter 6 Activity Planning.
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

SCHEDULE MANAGEMENT MODULE 8

Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced notice of changes (15 days notice) Level 2 schedule – standard Less than $1 million, 100 or more working days $1 to $5 million, or over $5 million and less than 100 working days Use and submit computer software, training Duration activities less than 20 working days Correct rejected schedules, resubmit within 7 days, 7 day review Level 3 schedule – complex Total bid over $5 million and 100 or more working days Time impact analysis, other terms

Required by Specification (City/Caltrans) Receipt of a baseline schedule Time-scaled network diagram (bar chart) Critical Path Method Schedule Updated schedule monthly Adjustments to schedule as work moves forward Withholding of schedule payments, if necessary

Scheduling by the contractor Contract Scope of Work Establishing Major Milestones Start/End dates Correct number of working days Critical Path Items Activity Relationships Each activity should have a start/finish, no open ended activites Resource Allocation Makes sense

Project Scheduling basics Establishing objectives Determining available resources Sequencing activities Identifying precedence relationships Determining activity times & costs Estimating material & worker requirements Determining critical activities Use of a Work Breakdown Schedule (WBS)

How do you manage a schedule? Prior to construction Think about the work yourself. How would you build it? Talk about the approach with the contractor Pre-bid - Emphasize that all contract requirements are met Baseline submission Review the document (full size, color) Revised/resubmitted or approved Schedule Updates Monitor, status the project, correct, adjust

Requirements of the CM Team Systematic approach to review, approve and monitor Baseline schedule How will contractor build the project? Does the plan with all other provisions of contract? Finish date/working days Permit dates Does it make sense? Check schedule updates Monitor - Is contractor maintaining his progress? Maintain – Are any adjustments necessary? Enforce – Communicate, document and act. Is he falling behind?

Preconstruction/Scheduling Meeting Review the schedule from the contractor Talk about the approach with the contractor Does his approach make sense Does it comply with the contract Emphasize that all contract requirements are met

Baseline Analysis Establish and approve baseline schedule Progress of critical path activities Time critical submittals Track long lead- time items Identify milestones established in the contract Shut-down Switch-overs Special constraints or conditions Weather, shut-downs, threats to environment, permits Adjacent contracts on-going, cooperative clause

Baseline submission – CM Team’s role Review Revised/resubmit or Approve Are all contract terms satisfied?

Baseline (Spec) 1. Planned/actual start & completion date of each activity… Submittals, plans Material procurement, milestones Interface with other Departments and outside entities Erection and removal shoring, traffic handling, test periods Final cleanup 2. Order proposed to prosecute the work 3. Logical links between the time-scaled work activities 4. All controlling activities (critical activities) 5. Legible description of each activity 6. At least 1 predecessor and 1 successor to each activity 7. Duration of at least 1 working day for each activity 8. Start milestone date as the Contract approval date

1. Submittals / Milestones 1. Start / Finish Dates

2. Sequence

3. Correct Logic

4. Critical Path (Red)

Critical Path Identifies critical path Longest path in network Shortest time project can be completed Any delay on critical activities will delay project Activities on the critical path have zero (0) float How is this calculated Done by detailed analysis, usually by computer (interdependencies) Some contract provisions require electronic submission Primavera P6 or Microsoft Project

5. Activity Descriptions

6. Activity Durations

5. Start Milestone and Contract Approval NTP

Example 1 – City Sewer Project

1. Start / Finish 3. Links 4. Critical Path 5. Descriptions 7. Durations 8. Milestones 2. Order 6. Pred/Succ

Schedule Update Monitor the progress – diaries, photos, logs Status the project – log dates of critical activities Correct – notify contractor Behind schedule Failure to work on critical activities Adjust Request recovery schedule (by letter) Contractor initiated corrections Longer work hours Additional crews Different equipment/means

Baseline Schedule

Update June 5th

Questions for Reviewer Completion date? Are you on schedule? Are you within budget? Probability of completing by...? What are the “Critical” activities? Have they changed? Is duration of critical activity changing? Enough resources? Will project finish on time? Early? Late?

Tracking progress Use “Weekly Statement of Working Days,” to track the status of contract time to the contractor. Weather Shut-downs Suspensions Added days via CCO

References Caltrans Construction Manual Chapter 5 Contract Administration Section 4 Disputes Construction Management Association of America Construction Management Standards of Practice