Blanco TCS Upgrade PDR Introduction Tim Abbott. This review This Introduction –Panel, Motivation, Goals & Specifications, Staff Encoders & servos – Michael.

Slides:



Advertisements
Similar presentations
GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
Advertisements

TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
Highly Efficient Operations Keck Scientific Strategic Planning 2009 Hilton Lewis T. Armandroff, S. Adkins, R. Goodrich J. Johnson, K. Kinoshita, R. Matsuda.
MIS 2000 Class 20 System Development Process Updated 2014.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
Justification  The Observatory Automation project required the Dome Drive System to be remotely operated and provide monitoring capabilities Conduct.
TCS Software Design Review. Have we understood all the requirements? Do we understand all the quirks of the hardware? Is the design capable of doing the.
BHEL – Electronics Division, Bangalore
© 2003 Swagelok Company MPC Series Modular Platform Components.
Senior Project Design Review Remote Visual Surveillance Vehicle (RVSV) Manoj Bhambwani Tameka Thomas.
Integrating Acquired Subsystems Bob Dalesio 09/21/99.
Autonomous Surface Navigation Platform Michael Baxter Angel Berrocal Brandon Groff.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
Author Bob Broilo EVLA Hardware Monitor & Control PDR March 13, ANTENNA SERVO AND SUBREFLECTOR CONTROLLER.
AMICA Antarctic Multiband Infrared CAmera Favio Bortoletto INAF – Osservatorio Astronomico di Padova on behalf of the AMICA collaboration Telescope and.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
Tim Abbott DECam & CTIO. Tim Abbott DECam & CTIO DECam will greatly expand and extend wide field imaging capability at CTIO.
Lab Group L2Bx EECE 380 – Electrical Engineering Design Studio (Spring 2014) 1 Spectrum Analyzer Michael Halpenny-Mason, Presenter 2, Presenter 3, Presenter.
Ground Robotics Reliability Center Andrew Niedert, Yazan Aljeroudi, Dr. Nassif Rayess, and Dr. Richard Hill Department of Mechanical Engineering, University.
Manag ing Software Change CIS 376 Bruce R. Maxim UM-Dearborn.
Software Acquisition and Project Management Lesson I: Introduction.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
CTIO and the Dark Energy Camera Prepared for the CD-1 Director’s Review Tuesday, July 25, 2006 Fermilab Alistair R. Walker.
EML 2023 – Motor Control Lecture 1 – Closed Loop Motor Control.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
Tim Abbott DECam & CTIO. Tim Abbott DECam & CTIO: CTIO’s preparations Active Optics –33-pad system, LUT driven, updated every.
ANTI Roland Anderson - CpE Patrick Galloway - CpE Casey Miville - EE Michael Sperrazzo - EE Automatic Note Taker for the Impaired Group 29.
Tim Abbott DECam & CTIO. Tim Abbott DECam & CTIO DECam will greatly expand and extend wide field imaging capability at CTIO.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
Current Telescope Control System Big Bear Solar Observatory Pointing and Tracking Guiding Light Beam Control.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
© 2001 By Default! A Free sample background from Slide 1 Optical Ethernet Design Receiver Group G1 David Gewertz Ryan Baldwin.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
F/8 Repair and recommissioning status and near term forward look Ron Probst, Roberto Tighe 06 Nov 2012.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
CTIO Facilities Improvement Project (CFIP) Tim Abbott Joint Review Jan 2008.
Updates on projects 472, 470, 443, 462, 442, 471, 480, 483, 484 Tim Abbott Changes since 9 July are in blue.
DECam & NOAO/CTIO Tim Abbott DES Collaboration Meeting Rio de Janeiro, May 2009 Tim Abbott, DES Collab. mtg., Rio, May 2009.
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
The Blanco Environmental Control System Alistair R. Walker November
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Fan Assembly Driven by Magnetic Fields
NEW UPGRADE TO THE APS MAGNETIC FIELD INTEGRAL MEASUREMENT SYSTEM
4m. Blanco TCS Upgrade: Signals and Interfaces
Technical resources schedule
CTIO Weather Station renewal
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
4m. Blanco TCS Upgrade: Electronic Status at March/2010
From LSE-30: Observatory System Spec.
Communications in Railway Centralized Traffic Control Systems
Requirements Basis Requirements of an Image Visualization System (IVS), to support the verification of the correct functioning of some components under.
Alistair Walker Version 3 December
CTIO Weather Station renewal
OpSim4 vs OpSim3 Francisco Delgado
SOCS/Scheduler Development Plan Michael Reuter, Fransicso Delgado
ETS For ACTR 9the April 2015 R.Tighe april 2011 april /04/2015
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March ver 2
Blanco 4M F8sec Upgrade.
4m. Blanco TCS Upgrade: Signals and Interfaces
Computer Numerical Control
INSTRUMENT CONTROLLER OVERVIEW
MONSOON Status Barry Michael Starr 11/22/2018.
ACTR meeting 9 / 9 / 9.
Blanco TCS Upgrade PDR 23 Aug 2007
Command and Data Handling
Ref: Connolly and Begg 6th ed., Chapter 10
Presentation transcript:

Blanco TCS Upgrade PDR Introduction Tim Abbott

This review This Introduction –Panel, Motivation, Goals & Specifications, Staff Encoders & servos – Michael Warner Hardware – Eduardo Mondaca Software – German Schumacher

PDR Panel Bob Marshall (NOAO, Tucson) Brooke Gregory (CTIO) Darren Depoy (OSU) Charge: Is the project as presented capable of achieving its goals with the resources provided and in the time frame available? Please provide written comments and recommendations, separately or as a group.

Project Motivation Keep Blanco operating as a state-of-the art facility –DECam, imposes some specifications, DES and the community. –NEWFIRM, another potentially very efficient observing facility –Existing instruments Retire & replace obsolete components –The existing system incorporates many obsolete and obsolescent components and technology. –Some components are home built with off-the-shelf options now available. –The power amplifiers are originals. –The mode-switching control model significantly constrains performance and was driven by the limited technology available at the time. Modernize software –Modern servo technology, both and sense and drive ends, has advanced significantly since the last upgrade (20 years ago!). –Can improve delivered image quality

Project Motivation Modernize software –Interfaces are dated –Capabilities are limited by today’s standards –Much useful telemetry is dropped on the floor Modularize –Existing system is highly centralized –Control and servo functions are blended Improve maintainability –Maintenance and modification get harder each year LSST prototyping –An opportunity to capitalize on SOAR experience and develop essential experience for LSST –Consolidated TCS support for 3 major telescopes.

Goals Maximize telescope efficiency for DECam/DES/NEWFIRM operations Replace obsolete & obsolescent components Replace wire-wrap & bread-boarded components with off-the-shelf and PCB components Use technology with an estimated >5 year market life

Goals Decouple mount, dome, rotator/guider from TCS Use SOAR/LSST model & components –Set point / Status model –Labview, Ethernet, Linux, new PMAC, Wallace kernel, comms middleware (DDS) –(In the longer term, plan to retrofit SOAR with Blanco innovations.) –(In the even longer term, plan to retrofit SOAR and Blanco with LSST innovations.) Introduce independent local and/or remote intelligence where appropriate

Goals Use new encoders –higher resolution, greater reliability, precision Integrate all existing instruments –Mosaic II, SISPI, Hydra, RC Spec, (NEWFIRM) Record and make available all telemetry from telescope to weather The upgrade is to be performed with existing TCS in place

Specifications Slew requirement: 2 degrees in 17 sec –To match DECam readout time Slew, project goal: 3 degrees in 20 seconds, track-to-track Tracking: <0.5” drift in 60 sec everywhere within the DES area Jitter: 100 mas r.m.s. Guide error signal delivery rate: 1 Hz Operational deadline: Sept 2010.

Replace: TCS –Kernel –Communications –Dome & utility control GUI Mount Control Telescope drive power amplifiers Encoders (SMCs later) Leave: Telescope motors Guiders Active optics Rotator f/8 control Instruments (SMCs, for the time being)

Blanco 4M Upgrade Diagram Operator GUI Mount Control TCS App Kernel Dome/ Utility 4MAPIMANROT4MF8SECCFADC DECAMISPIHYDRAMOSAIC Guider Interface Lamps Interface Dome Interface Ethernet RS-485 Mount Interface To Dome PLC Dome Encoders Comparison Lamps To Guider Motors Guider Encoders To Ra/Dec Motors HandPaddle Interlocks Encoders UDP, TCP/IP Ethernet/ Serial Interfaces Provided By CTIO Instruments Adapter Instruments Motor Controllers (SMC) Facility Database Weather, MASS DIMM, Sky Cam. Time IRIG-B Remote Ops IMAN PC-Guider NEWFIRM

Project Staff Tim Abbott (Project manager/scientist, DECam deputy project manager) German Schumacher (Software manager) Ricardo Schmidt (Electronics group manager) Eduardo Mondaca (Electronics engineer, interfaces, hardware, servos) Michael Warner (Servos, hardware) Manuel Martinez (Connectivity, motor controllers) Rolo Cantarutti (Software) Omar Estay (Software) Francisco Delgado (Software) Andres Montane & group (Mechanics, fab) CTIO DSS –Gale Brehmer (mgr), Enrique Schmidt, David Rojas, Javier Rojas, Humberto Orrego.

Software Timeline Jul-Sep 07Oct-Dec 07Jan-Mar 08Apr-Jun 08Jul-Sep 08Oct-Dec 08Jan-Mar 09Apr-Jun 09Jul-Sep 09Oct-Dec 09Jan-Mar 10 Servo Control Mount Software Serial Software TCS Application SMC Control Dome/ Utility Guider Instruments Interfaces Operator GUI Control Design Purchases Commis. GS 50% MW 50%MW 70% MW 50% OE 75% MM 50% RC 10%RC 70% FD 50% Facility Database FD 70% FD: Francisco Delgado GS: Germán Schumacher MM: Manuel Martínez MW: Michael Warner OE: Omar Estay RC: Rolando Cantarutti

Electronics Timeline Jul-Sep 07Oct-Dec 07Jan-Mar 08Apr-Jun 08Jul-Sep 08Oct-Dec 08Jan-Mar 09Apr-Jun 09Jul-Sep 09Oct-Dec 09Jan-Mar 10 SMC Tests TCS Application Tests Support Dome/Utility Interface D&I Guider Tests Instruments Interfaces D&I Conceptual Design Mount Interfaces and Power Drivers Purchases Commis. EM 60% ET 30% ED 30% DOME Tests Mount Tuning Encoder Tests Guider Interface D&I Instruments Tests D&I = Design and Implementation

Capital costs