Civil Assets, Stations & Facilities Project - ESTEEM (WLC) (Engineering Strategy for Economic & Efficient Management) April 2010.

Slides:



Advertisements
Similar presentations
Operation & Maintenance Engineering Detailed activity description
Advertisements

© AMD Publishing/ Terry Hill 2005 T. Hill, Operations Management 2e. Palgrave Macmillan ISBN: / X Chapter 14 PROCESS AND DELIVERY SYSTEM.
Value for Money – new requirements and challenges
Chapter 1 Business Driven Technology
Chapter 4 Scope Management
Control and Accounting Information Systems
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Framework for comparing power system reliability criteria Evelyn Heylen Prof. Geert Deconinck Prof. Dirk Van Hertem Durham Risk and Reliability modelling.
Decision Analysis. What is Decision Analysis? The process of arriving at an optimal strategy given: –Multiple decision alternatives –Uncertain future.
Managerial Decision Modeling with Spreadsheets
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Modelling the Aerospace Aftermarket with Multi-agents Systems Ken Woghiren Technical Director - Lost Wax.
Rational Unified Process
Unit 6 University of Sunderland COMM80 Risk Assessment of Systems Change Risk Assessment: the Generic Concept COMM80: Risk Assessment of Systems Change.
“ Hard work and concern for the society is the key to success ” - O P Jindal On-site and Off-site Emergency Plans Based on Integral Risk Management – Key.
FASAB Update CIGIE/GAO Financial Statement Audit Conference Wendy Payne Executive Director March 30, 2011.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Page 0 Optimization Uncertainty Decision Analysis Systems Economics Masters of Engineering With Concentration in Systems Engineering A 30 hour graduate.
Sustainment Management Systems
DELIVERING SAFE & RELIABLE OPERATION
Financial performance measures and transfer pricing
Planning and Budgeting
Release & Deployment ITIL Version 3
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Project Management: Madness or Mayhem
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
1 Ministry of Transport, Public Works and Water Management.
Sociology 3322a. “…the systematic assessment of the operation and/or outcomes of a program or policy, compared to a set of explicit or implicit standards.
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
Asset Management Strategies: Moving from costs to outcomes Tyrone Toole, ARRB Group Ltd South East Australian Transport Strategy Inc, Ordinary General.
Session 7: Population projections for national populations 7.1. Spectrum 7.2. Evaluation of projection results 7.3. Accounting for uncertainty – choosing.
Overview Asset Management (AM) is a systematic process of operating, maintaining, upgrading and disposing of assets cost- effectively while maintaining.
IT Requirements Management Balancing Needs and Expectations.
Computerized Manufacturing Systems
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.
Developing an Investment Governance Framework
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
David Moser USACE Chief Economist
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
P5 : Advanced Performance Management. B1: External Influences on Organisational Performance B1. Changing business environment B2. Impact of external factors.
Contact us: Call: Mail: Visit:
Road Investment Decision Framework
Ofwat – Protecting consumers, promoting value and safeguarding the future Water and Regulation Improving the value from statistics Gordon Allan Engineering.
SAP TRM ONLINE TRAINING Contact us: Call: Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
Asset Degradation Modelling at Townsville Water
The Impact of Accountable Care Organizations in Radiology
Cost Estimating Investment Planning and Project Management
Chapter 13 Inventory Management McGraw-Hill/Irwin
Multi-Year Programming and Predictive Modelling
Project Management Processes
Project Integration Management
PROGRAM OVERVIEW We have put you into multi-country teams to foster:
CRISC Exam Certified in Risk and Information Systems Control (CRISC)
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
Increasing Asset Lifecycle through the application of Innovative Technology
Risk Management: What’s a CMMS got to do with it?
CIS12-3 IT Project Management
MSCOA Risk management Inculcating ethical culture through
SAP TRM ONLINE TRAINING
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
Project Management Processes
Operational Excellence - Transforming our operations
And now the Framework WP4.
Presentation transcript:

Civil Assets, Stations & Facilities Project - ESTEEM (WLC) (Engineering Strategy for Economic & Efficient Management) April 2010

WLC savings in excess of 20% over 30 years in comparison with current practice Bayesian (ABLE) enables Learning & Clear traceability of actual performance against plan based on Probability BAU User screens for Data Collection & Change Management Instant access to integrated data, AAMP produced from Business as Usual (BAU) Verifiable prediction of “Residual Liability” to minimise future “Investment Bow Wave” and Financial Risk. Benefits

Decision Tree or Equivalent for WLC Optimisation “Time Variant” Data Warehouse for Data Management (philosophy of data entered only once) Bayesian used for Modelling Uncertainty that is Complex - Variable Duty/Environments/Systems/Costs/Degradation BAU User Screens supports Change Management & Bayesian Updates of Plan Forecasts. ESTEEM Methodology

WLC Optimisation Asset in Good Condition Yes £20k Yes £70k Yes £100k Yes £200k Planned Maintenance (2 yrs) Breakdown (Component Replace) No (Postpone 5 yrs) Replace Major Components No (Postpone 10 yrs) Performance Loss + System Degradation No (Postpone 4 yrs) New Asset/ System? Close Note: The replace option is not appropriate for LU Civil Assets, and is only shown here to illustrate the concept of WLC (Paint) (Shot Blast &Paint) (Patch Repair & Paint) (Replace)

Policy 1: Meet Standards and Contract Benchmarks Policy 2: Least Cost to Maintain Assets in Perpetuity Policy 3: Expenditure Deferred Safely for a 5-10 year Period Policy 4: Do the Minimum, i.e. Expenditure Deferred within Safety Constraints Policies can be Mixed to Illustrate Long Term Consequences of Different Budget Constraints. Policy Options

NOW N years Long-Term Decision Tree Mouchel Latest Event Time Node Least Cost Path for a Policy Option

Asset Condition Assessment Data Warehouse “Plan, Do, Review, Actions and Impacts” tracks data quality, knowledge change, costs, unit rates, condition and degradation at MI level Hand Held Inspections Scenario Plans, AAMP, Excel Shops for Decision Analytics & Feedback Loop Work Scheduling Reliability, Availability, Maintainability (RAM) Techniques ABLE Model Data Management & Bayesian Engineering Methods (optimisation) Prior Model Rules Sample Studies Asset Life- Degradation Environments Prior Model Data Governance – Master Data Management Layer WLC Optimise & Population Models BAU Web User s SAP Accounting

User Screens & Reports (Costs are illustrative only)

Pivot Table A – Slice 2 Policy 2 standard interventions (masonry, concrete, painting)

Pivot Table A - Slice 1 Policy 1 Custom Interventions Deck Strengthening

“If implemented as planned ESTEEM exceeds PAS55 Asset Management requirements and should be in the “Excellence” band of the audit Model. Defined as “Leading edge and continuously improving” This would represent a “World Best Practice” Approach to Asset Management (AM) for Long Lived Assets” LU committed to PAS55 ESTEEM designed as “a centre of excellence for AM” in LU that is recognisable by stakeholders. Independent Audit by ORR Reporters