Project Planning, Scheduling and Control Planning: –defines objectives, tasks and preceeding relationships; estimates time and resources Scheduling: –identifies.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

Chapter 3 Project Management.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
1.040/1.401 Project Management Spring 2007 Deterministic Planning Part I Dr. SangHyun Lee Department of Civil and Environmental Engineering.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
إدارة المشروعات Projects Management
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
MGMT 483 Week 8 Scheduling.
Project Scheduling Critical Path Method
Chapter 3 (Continued) Outline Recap CPM (continued)  Assign time estimates to each activity  Compute the longest time path through the network.
Chapter 9 Project Management.
PERT/CPM Models for Project Management
Projects: Critical Paths Dr. Ron Lembke Operations Management.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
1 Material Management Class Note # 5-A ( in review ) Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Network Planning Methods Example PERT & CPM
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 Material Management Class Note # 6 Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Beni Asllani University of Tennessee at Chattanooga
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Chapter 16 – Project Management
Project Management.
PROJECT MANAGEMENT.
Project Management (專案管理)
ECE362 Principles of Design
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Time Planning and Control Activity on Node Network (AON)
Project Planning and Scheduling
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Time Planning and Control Activity on Node Network (AON)
Project Planning and Budgeting
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Time Planning and Control Precedence Diagram
Time Planning and Control Activity on Node Network (AON)
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Exercise – A small building.
Presentation transcript:

Project Planning, Scheduling and Control Planning: –defines objectives, tasks and preceeding relationships; estimates time and resources Scheduling: –identifies critical tasks which, if delayed, will delay the project’s completion time. Control: - monitoring and revising progress of a project Define activities Identifying precedence relationships (Sequencing activities) Determining activity times & costs Develop schedule Determining critical activities Estimating material & worker requirements Monitor and control project

Techniques –Gantt chart –CPM –PERT –Microsoft Project Graphically displays project activities Estimates how long the project will take Indicates most critical activities Show where delays will not affect project Consider precedence relationships Each uses a different activity times PERT and CPM

Critical Path Scheduling CPM (Critical Path Method) –Developed by DuPont for chemical plants (1956) to schedule preventative maintenance shutdowns. –Identifies longest time-consuming path required to complete a project (i.e. shortest time in which project can be completed). –Deterministic task times PERT (Program Evaluation and Review Technique) –Found by U.S. Navy for planning Polaris missile project. –Multiple task time estimates –Estimate probability that project will be completed by a given deadline

CP Definitions Earliest Start Time (ES) is earliest time a task can start Earliest Finish Time (EF) is earliest time a task can end. EF = (ES + duration of activity) Latest Finish Time (LF) is latest time a task can end, without delaying project. Latest Start Time (LS) is latest time a task can start, without delaying project. LS = (LF – duration of activity)

CPM : Forward Pass * Finds the ES and EF times * Goes through jobs in order * Start each job at the earliest time while satisfying the precedence constraints EF i = ES i + t i * ES for an activity leaving a node is equal to the largest of the EF for all activities entering that node

Backward Pass Fix the finishing time Look at tasks in reverse order Start the task at its LS time LS i = LF i - t i * LF time for an activity entering a particular node is equal to the smallest of the LS times for all activities leaving the node.

Critical Path Minimum length of project is the length of longest path Longest path is called the critical path Look for tasks whose earliest start time and latest start time are the same. ES=LS (equally, EF=LF) These tasks are critical, and are on a critical path. No flexibility in tasks on the critical path Total Slack is the difference between LS and ES, or LF and EF. An activity with a slack of zero is on the critical path

example for CPM ActivityPredecessorsDuration(days) A-6 B-9 CA, B8 D 7 ED10 FC, E12 AOA A,6A,6 B,9B,9 Dummy C,8C,8 D,7D,7 E,10 F,12 Node 1 = starting node Node 6 = finish node

9 Forward Pass (ES,EF) F, B,9B, Dummy A,6A,6 E, C,8C,8 D,7D,7

9 Backward Pass (LS,LF) F, B,9B, Dummy A,6A,6 E, C,8C,8 D,7D,7

ActivityES(i)LS(i) A03 B00 C918 D99 E16 F26 Total Slacks are computed as Activity A: 3 Activity B: 0 Activity C: 9 Activity D: 0 Activity E: 0 Activity F: 0 Critical path Activity with a slack of zero is a critical activity Path from node 1 to the finish node that consists entirely of critical activities is called a critical path. B-D-E-F is a critical path. The Makespan is equal to 38

Slacks (Floats) Free Float (FF) = Amount the termination of an activity can be delayed before delaying a successor. FFi = (ESi+1) min - ESi – Di Total Float (TF) = Amount of slack an activity has before it would cause the path on which it lies to become critical. TFi = LFi - EFi

CPM Network for Computer Design Project

3.0 Sys. design Pwr supply Int & test Finalize Prototype Packaging Main board Proj mgmt Start End Task no. Elapsed time End week Slack time Start week Network Diagram (Activity on Node)

How much time do you need to prepare and consume the meal? Menu consists of soup and baked chicken Soup must be boiled 35 minutes and will allow 15 minutes to serve and consume Chicken dish requires 30 minutes to boil rice, 15 minutes to brown chicken in frying pan, 15 minutes to bake rice and chicken in baking dish Sauce takes 5 minutes to prepare in frying pan and 15 minutes to boil peas Only have two pots and one frying pan Wine takes 5 minutes to uncork and 30 minutes to let breath before serving Allow 25 minutes to serve and consume entrée and wine

Meal Planning Exercise : WBS Boil Soup (Pot 1) Boil Rice (Pot 2) Brown Chicken (Fry Pan) Open WineWine Breathes Eat Entree Bake Entree Prepare Sauce (Fry Pan) Boil Peas (Pot 2) Eat Soup (Pot 1) Activity Name (Resource)

Meal Planning Exercise Critical Path Method - Forward Pass 015 Brown Chicken Open Wine Boil Rice Boil Soup Eat Soup Boil Peas Prepare Sauce Wine Breathes Bake Entree Eat Entree 25 ESEF Activity Name duration

Meal Planning Exercise ( Backward Pass) Critical Path Brown Chicken Open Wine Boil Rice Boil Soup Eat Soup Boil Peas Prepare Sauce Wine Breathes Bake Entree Eat Entree ESEF LF Activity Name duration LS FF = = 5

Complete Network AON

Complete Network AON

Activity-on-Node Network

Activity-on-Node Network Forward Pass

Activity-on-Node Network Backward Pass

Activity-on-Arrow Network

Activity-on-Arrow Network Forward Pass

Activity-on-Arrow Network Backward Pass

AOA Network Backward Pass, Forward Pass, and Slack

Project Network For A House Lay foundation Design house and obtain financing Order and receive materials Dummy Finish work Select carpet Select paint Build house All Possible Paths A: => = 9 months; critical path B: => = 8 months C: => = 8 months D: => = 7 months

Early Times (Housebuilding example) ES 12 = 0 EF 12 = ES 12 + t 12 = = 3 months ES 23 = max (EF 2 ) = 3 months ES 46 = max (EF 4 ) = max (5,4) = 5 months EF 46 = ES 46 + t 46 = = 8 months EF 67 =9 months, the project duration

Computing Late Times LF 67 = 9 months LS 67 = LF 67 - t 67 = = 8 months LF 56 = minimum (LS 6 ) = 8 months LS 56 = LF 56 - t 56 = = 7 months LF 24 = minimum (LS 4 ) = min(5, 6) = 5 months LS 24 = LF 24 - t 24 = = 4 months ES=0, EF=3 LS=0, LF=3 ES=3, EF=5 LS=3, LF=5 ES=5, EF=5 LS=5, LF=5 ES=5, EF=8 LS=5, LF=8 ES=6, EF=7 LS=7, LF=8 ES=8, EF=9 LS=8, LF=9 ES=3, EF=4 LS=4, LF=5 ES=5, EF=6 LS=6, LF=7

Activity Slack Activities on critical path have ES = LS & EF = LF Activities not on critical path have slack S ij = LS ij - ES ij S ij = LF ij – EF ij S 24 = LS 24 - ES 24 = = 1 month ActivityLSESLFEFSlack (S) 1-2* * * *88990* Critical path

AON Network for House Building Project Start Design house and obtain financing Order and receive materials Select paint Select carpet Lay foundations Build house Finish work

Start Critical Path A: => = 9 months B: => = 8 months C: => = 8 months D: => = 7 months

Activity Start Times Start Start at 3 months Start at 6 months Start at 5 months Finish at 9 months Finish

Mode Configuration Activity number Activity duration Earliest start Latest start Earliest finish Latest finish

Earliest Activity Start and Finish Times Start Design house and obtain financing Select pain Lay foundations Select carpet Build house Finish work Order and receive materials

Latest Activity Start and Finish Times Start Design house and obtain financing Select pain Lay foundations Select carpet Build house Finish work Order and receive materials

* Critical Path *7* *4* *2* *1*1 Slack S EF LF ES LS Activity Activity Slack

Project Control Gantt Chart Graphical technique (bar chart) that shows the amount of time required for each activity. Developed by Henry Gantt in 1914 Provides visual display of project schedule Graph with bar for representing time for each task Also shows slack for activities

Gantt Chart for building a house |||||||||| Activity Design house and obtain financing Lay foundation Order and receive materials Build house Select paint Select carpet Finish work Month Month slack

Pour foundation & frame Buy shrubs etc wk. 4 wk. 2 wk. 6 wk. Do interior work Landscape Roof Critical path is longest path: 12 weeks. Critical Path in Network

1-2 Fdn & frame 1-3 Buy shrubs 2-3 Roof 2-4 Interior work 3-4 Landscape Activity Build House Project Gantt Chart :Earliest Start and Finish

1-2 Fdn & frame 1-3 Buy shrubs 2-3 Roof 2-4 Interior work 3-4 Landscape Activity Build House Project Gantt Chart : Latest Start and Finish