SECURITY SIG IN MTS 02 ND OCTOBER 2013 PROGRESS REPORT Fraunhofer FOKUS.

Slides:



Advertisements
Similar presentations
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Advertisements

Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -
SECURITY SIG IN MTS 28 TH JANUARY 2015 PROGRESS REPORT Fraunhofer FOKUS.
Introduction to the ISO series ISO – principles and vocabulary (in development) ISO – ISMS requirements (BS7799 – Part 2) ISO –
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
802.16m Closing Report September 16, 2010 St. Petersburg, Russia Session # IEEE m-10/0030r1.
Doc.: IEEE /430r0 Submission José A. Gutierrez November 02 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Liaison Report – Work Related to Date Submitted:
Liaison Update IEEE Computer Society Category A Liaison to JTC 1/SC 7 James W. Moore, CSDP The MITRE Corporation The opinions contained.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
SECURITY SIG IN MTS Fraunhofer FOKUS Tallinn, 4-5 October 2011 Berlin, 15 December 2011 update.
Jürgen Großmann, Fraunhofer FOKUS
Security SIG#6‘ in MTS 26th November 2012 Agenda & report
CONFORMIQ DESIGNER 2012 MTS #55 Meeting.
Security SIG in MTS 05th November 2013 DEG/MTS RISK-BASED SECURITY TESTING Fraunhofer FOKUS.
IEEE MEDIA INDEPENDENT HANDOVER
Closing Report Date: Authors: November 2008 September 2008
Security SIG in MTS Fraunhofer FOKUS Tallinn, 4-5 October 2011.
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
22 March Agenda Opening comments and attendance
Berlin, 15 December 2011 update
Security in MTS 14th May2013 SIG Report
Sophia Antipolis, 25 January 2012
Matthew B. Shoemake Task Group G Chairperson November 15, 2002
Recommended Next Steps and Timelines
Security in MTS 19th September 2012 SIG Report
doc.: IEEE <doc#>
Security SIG in MTS Fraunhofer FOKUS Tallinn, 4-5 October 2011.
PAD SG Closing Report Date: Authors: September 2012
Berlin, 15 December 2011 update
Berlin, 15 December 2011 update
802.11af Liaison Report Date: Authors: November 2011
802.11af Liaison Report Date: Authors: March 2012
doc.: IEEE <doc#>
Reliability Standards Development Plan
Security SIG#4 in MTS 10th August 2012
Security SIG#4 in MTS 10th August 2012 Report
Security SIG#5 in MTS 19th September 2012 Agenda
TGu Timeline Date: Authors: January 2005 January 2005
Security SIG#7 in MTS 18th January 2013 draft Agenda
TGs LA Closing Report Date: Author: January 2011
Closing Report Date: Authors: November 2009 November 2009
Security SIG in MTS 27th January 2016 Progress Report
IEEE IMT-Advanced Review Process
Liaison Report Date: Authors: July 2009
Security SIG#6 in MTS 19th November 2012 draft Agenda
September 2009 TGmb Closing Report
IEEE IMT-Advanced Review Process
TGaj Editor Report for CC22
TGaj Editor Report for CC22
Water Directors’ Meeting Working Group D (Reporting) activities
UPDATE on PICS GUIDE (EG ) REVIEW
MTS WG TST STATUS Axel Rennoch MTS#74, Sophia-Antipolis, May 24, 2018.
Revision of EG CTI October 2013
November 2008 Closing Report
Liaison Report Date: Authors: September 2010
Axel Rennoch MTS#74, Sophia-Antipolis, May 24, 2018
UCAAT 2017 is hosted and organised by Fraunhofer FOKUS.
How to write world class standards
Progress Report GUID on Information System Security Audit
TG 1 November Session Opening Report
TGmd July 2017 Closing Report
Submission Title: [WG-TG3 closing Report Sept02]
TGg Report to the IEEE Working Group
802.11af Liaison Report Date: Authors: July 2011 Month Year
Security in MTS 19th September 2012 SIG Report
Liaison Report Date: Authors: January 2011
UPDATE on PICS GUIDE (EG ) REVIEW
Testing Task Force process overview
Presentation transcript:

SECURITY SIG IN MTS 02 ND OCTOBER 2013 PROGRESS REPORT Fraunhofer FOKUS

Agenda SIG#8 Participants: Jürgen Großmann, Ari Takanen, Dieter Hogrefe, Emmanuelle. Chaulot-Talmon, Ian Bryant, Jorge Cuellar, Milan Zoric 1) Review/discussion APs and WI status 2) Security Testing Terminology and Concepts 3) Case Study Experiences 4) Design Guide & Security Testing Methodologies 5) Schedule 2

APs (from SIG#7) Jürgen/Peter: complete Diamonds case study input Ari/Peter: Invite E2NA and CTI to review Terminology & Concepts (after stable draft) Ian/Scott: provide stable draft for September MTS: request formal liaison with ISO SC27/WG3&4 3

Security Testing Terminology DTS/MTS SecTest_Terms in v0.4 Ari invited E2NA and CTI to comment on the last version Comments are available from Milan Zoric Comments are available from Conformiq Main remaining issues 1. MTS has to decide whether document shall be TS/TR (CTI proposes TR) 2. Alignment with other SIG WI -> AP: WI authors should provide major terms from their documents (until mid of October) 3. Imbalance between sections need to be resolved 4. References to ETSI performance testing documents necessary even if they do not tackle with security? 4

Cases Study Experiences DTS/MTS SecTest_cases in v0.3 Stable draft with 6 cases studies 4 case studies from DIAMONDS (banknote processing, banking, automotive, radio protocols) 2 case studies from SPACIOS (eHealth, document server) Main remaining issues 1. Minor editorial issues -> AP JGR check with EMM 2. Alignment with other Wis -> AP JGR/JCU provide list of terms from the case studies (until mid of October) 3. Start remote consensus -> AP JGR/EMM after 1 is finished Security SIG in MTS, 4-5 October

Design Guide & Security Testing M. Document status Work plan for WI has been provided by Ian Draft with lots of notes, needs to be compiled in a draft document but only sparse progress Support offer from Ari and Jürgen (input from RASEN/DIAMONDS project) Resolution 1. Speedup the progress is main goal 2. Proposal to MTS: Split document in two WIs WI: Verification and Validation Life Cycle part (Sections 1-5 and Annexes A, B from original document), Resp: IBR WI: Security Testing Methodologies (Section 6 with methodologies for risk based security testing based on standards like ISO and IEEE 829/29119), Resp: JGR 3. AP JGR/IBR establish work plan and initial contribution until next Security SIG meeting 4. AP JGR/IBR provide list of terms from the case studies (until mid of October) Security SIG in MTS, 4-5 October

Schedule Next version of DTS/MTS SecTest_Terms to be delivered for January MTS Next version of DTS/MTS SecTest_Cases to be provided for RC in October Work plan and initial version of 1. WI: Verification and Validation Life Cycle part (Sections 1-5 and Annexes A, B from original document), Resp: IBR 2. WI: Security Testing Methodologies (Section 6 with methodologies for risk based security testing based on standards like ISO and IEEE 829/29119), Resp: JGR to be provided until next MTS Security SIG Next MTS Security SIG November 5 th 7